Büyük ticari yapı ruhsatları: New York

Son 90 günde verilen, beyan edilen maliyeti 1 milyon $ ve üzeri 1180 ruhsat (yeni yapı, büyük tadilat, yıkım). Güncelleme: 2026-10-30.

Veri seti: https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Approved-Permits/rbx6-tga4

🔒 Açık adres, tam maliyet, yüklenici ve mal sahibi adları yalnızca üyelere gösterilir.
Ruhsat tarihiBölgeİş türüBeyan edilen maliyetAçıklama (resmî, İngilizce)Üyeler
2026-10-28Manhattan · East Midtown-Turtle BayInitial Permit · General Construction50 milyon $ üzeriInterior work includes the installation of acoustical window inserts at courtyard-facing rooms. No change to occupancy or use. Structural application number M01369356-I1.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Hereby filing demolition of the space including all furnishings, finishes, interior framing and abandoned fit-out services. as shown on plans filed herewith. No change to use, occu🔒 Adres ve yükleniciler
2026-10-28Brooklyn · GreenpointInitial Permit · General Construction1–5 milyon $LOADING RACK AND TANK PIPING MODIFICATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-28Brooklyn · Sunset Park (East)-Borough Park (West)Renewal Permit Without Changes · General Construction50 milyon $ üzeriP.S. 004K: PROPOSED A NEW 4-STORY SCHOOL BUILDING.🔒 Adres ve yükleniciler
2026-10-28Bronx · Throgs Neck-SchuylervilleInitial Permit · General Construction1–5 milyon $HEREWITH TO FILE ALTERATION TYPE ONE IN ORDER TO DO ERECT INTERIOR PARTITIONS & STAIRS. TO DO PLUMBING WORK UNDER SUBSEQUENT DOB NOW BUILD APPLICATION, AND TO OBTAIN NEW CERTIFICAT🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Standpipe1–5 milyon $Hereby filing to install sprinkler heads and fire hose cabinets with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupa🔒 Adres ve yükleniciler
2026-10-28Queens · Kew GardensInitial Permit · General Construction1–5 milyon $Proposed interior renovations to East Wing on ground and first floor per plans. Exterior work to include renovations to roof. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-28Staten Island · Grasmere-Arrochar-South Beach-Dongan HillsInitial Permit · Support of Excavation1–5 milyon $SOE FOR PHASE 2 SITE PREPARATION (EARTHWORK) AND FUTURE NEW BUILDINGS IN PHASE 3.🔒 Adres ve yükleniciler
2026-10-28Brooklyn · BensonhurstRenewal Permit with Changes · General Construction10–50 milyon $Construct New 2 Stories Self Storage Facility all as per plan submitted🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Sprinklers1–5 milyon $Hereby filing to install sprinkler heads and fire hose cabinets with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupa🔒 Adres ve yükleniciler
2026-10-28Queens · Bay Terrace-ClearviewRenewal Permit Without Changes · General Construction1–5 milyon $P.S. 184-Q: Replacement of select roofing systems, roofing repairs, repairs to existing masonry, extension of roof guardrails, scuppers at roof, stair railing and areaway grating r🔒 Adres ve yükleniciler
2026-10-28Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachRenewal Permit with Changes · Structural1–5 milyon $Structural and foundation work for new 3 story elevator and stair addition , new ADA ramp, 1st floor elevator vestibule, relocation of stair egress.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Mechanical Systems1–5 milyon $Mechanical modifications on floors 2-5 and Roof as per plans filed herewith. No changes in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Harlem (South)Renewal Permit with Changes · General Construction10–50 milyon $PROPOSED TWELVE (12) STORY MIXED-USE DEVELOPMENT.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction10–50 milyon $General construction associated with tenant interior alterations on floors 2-5, including critical infrastructure work in sub-cellar, basement, 1st and roof as per plans filed here🔒 Adres ve yükleniciler
2026-10-28Manhattan · West VillageInitial Permit · General Construction5–10 milyon $Interior renovations as per plans filed herewith. No change to use , egress or occupancy.🔒 Adres ve yükleniciler
2026-10-28Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · General Construction1–5 milyon $Interior renovation of existing office area, includes new non load bearing partitions, finishes, lighting, electrical, etc.🔒 Adres ve yükleniciler
2026-10-28Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $INSTALLATION OF NEW NON-LOAD-BEARING WALLS, DOORS, WALL AND FLOOR FINISHES, CEILINGS, AND MILLWORK ON 25TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Lower East SideInitial Permit · General Construction1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-10-28Manhattan · Upper West Side-Lincoln SquareRenewal Permit Without Changes · General Construction10–50 milyon $Filing herewith Alteration-CO (Alt-CO) for new outdoor theater building erected on Damrosch Park at 61 Amsterdam Avenue (Block 1134, Tax Lot 10) as an enlargement of 140-146 West 6🔒 Adres ve yükleniciler
2026-10-28Manhattan · GramercyInitial Permit · Sprinklers1–5 milyon $Modifications to existing Sprinkler System related to Guestrooms renovation.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION TAKING PLACE ON 2ND & 8TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-28Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $Architectural work to new roof amenity building envelope, interior finish. Mechanical, Electrical and Plumbing Systems filed under separate application. Interior: Multifunction roo🔒 Adres ve yükleniciler
2026-10-28Brooklyn · Prospect Lefferts Gardens-WingateInitial Permit · Mechanical Systems50 milyon $ üzeriHerewith filing to INSTALL STEA &CONDE. PIPING FROM MER ECW39 TO PUMP AND TANK ROOM ECW39.2.INST. HIGH TO MED.PRESSURE STEAM REDUC STATION AND HIGHTO LOW PRESS. STEAM REDUCISTATION🔒 Adres ve yükleniciler
2026-10-28Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $MODIFICATION TO EXISTING NON-BEARING PARTITION LAYOUT THROUGHOUT APT 8-N INCLUDING NEW FINISHED CEILINGS, REPLACEMENT OF FINISH FLOORING, CABINETWORK AND COUNTERTOPS. NO CHANGE IN🔒 Adres ve yükleniciler
2026-10-28Manhattan · Upper East Side-YorkvilleInitial Permit · Plumbing1–5 milyon $REPLACE EXISTING SITE STORMWATER DRAINAGE SYSTEM & INSTALL NEW DRAINAGE SYSTEM FOR PLAYGROUND & INSTALL NEW SITE SANITARY CONNECTION FOR SPRAY SHOWER INCLUDING, NEW CATCH BASINS, M🔒 Adres ve yükleniciler
2026-10-28Manhattan · East Harlem (North)Renewal Permit Without Changes · General Construction1–5 milyon $Work includes per the filed plans replacement of existing roof system, associated flashing and masonry parapets interior and exterior waterproofing at cellar level, repair of mason🔒 Adres ve yükleniciler
2026-10-28Manhattan · Morningside HeightsRenewal Permit with Changes · General Construction1–5 milyon $interior alteration to existing Barnard offices, addition of classroom use and occupancy. This is accessory to the college. No change in egress🔒 Adres ve yükleniciler
2026-10-27Brooklyn · CanarsieRenewal Permit Without Changes · General Construction1–5 milyon $OT: Interior - Remove Flooring, Doors, Signage and provide new. Exterior - Remove/ Repair Existing Masonry. Provide Concrete Pad on Grade. No change in Occupancy, Use, or Egress.🔒 Adres ve yükleniciler
2026-10-27Bronx · Wakefield-WoodlawnRenewal Permit Without Changes · Structural1–5 milyon $X019- Exterior Masonry Structural Work🔒 Adres ve yükleniciler
2026-10-27Staten Island · Grasmere-Arrochar-South Beach-Dongan HillsRenewal Permit with Changes · Foundation1–5 milyon $PROPOSED ALTCO OF EXISTING 2-STORY COMM BLDG - PROPOSED EXPANSION WITHIN EXISTING BLDG. CHANGE IN OCCUPANCY FROM RETAIL STORE & COMM VEHICLE STORAGE TO AUTO SALES & AUTO SERVICE DE🔒 Adres ve yükleniciler
2026-10-27Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL MODIFICATIONS TAKING PLACE ON 14TH & 15TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-27Brooklyn · Sunset Park (Central)Initial Permit · General Construction1–5 milyon $File to propose vertical and Horizontal Enlargement for an existing 2 Story Building. Obtain 4 Family CofO.🔒 Adres ve yükleniciler
2026-10-27Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Plumbing1–5 milyon $Modifications to plumbing, sprinkler and standpipe systems as per plans filed herewith. No change of use, occupancy or egress.🔒 Adres ve yükleniciler
2026-10-27Manhattan · East Harlem (South)Initial Permit · General Construction1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-10-27Manhattan · East Harlem (South)Initial Permit · Plumbing1–5 milyon $PROPOSE PLUMBING SCOPE FOR MINOR RENOVATION FROM 2ND THROUGH 20TH FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-27Manhattan · West VillageInitial Permit · Mechanical Systems1–5 milyon $Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-27Brooklyn · BrownsvilleRenewal Permit Without Changes · Plumbing5–10 milyon $Installing 6 domestic hot water heat pumps, 11 hot water storage tanks, new dom water serv,., replacement of wc, repl of W/S piping in basement, installing two electric swing tanks🔒 Adres ve yükleniciler
2026-10-27Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $Filing herewith interior renovation at existing Cellar and 1st floor, Citi Bank. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-27Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Filing for interior renovation of restaurant space at cellar and first floor. Structural and plumbing work filed subsequently in DOB NOW. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-27Brooklyn · Cypress HillsInitial Permit · General Construction1–5 milyon $Providing full accessibility to the school. Work includes Auditorium ramp renovation, front entrance concrete renovation, bathroom renovations, and the addition of an area of rescu🔒 Adres ve yükleniciler
2026-10-27Queens · Kew Gardens HillsInitial Permit · Mechanical Systems10–50 milyon $HVAC scope includes replacement of ACUs 110, D/X units 11, 13, 15, 16, HV 14, EF 147, and ~200 VAV/CV boxes. New chilled water and steam-to-hot water systems to improve efficiency 🔒 Adres ve yükleniciler
2026-10-27Brooklyn · Bedford-Stuyvesant (West)Renewal Permit with Changes · General Construction1–5 milyon $PROPOSING VERTICAL ENLARGEMENT TO AN EXISTING TWO STORY BUILDING.🔒 Adres ve yükleniciler
2026-10-27Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $Interior renovations of non-load bearing partitions, replacements of interior finishes at ceiling, wall and floor surfaces, and installation of new LED lighting. No change in use,🔒 Adres ve yükleniciler
2026-10-27Brooklyn · Borough ParkRenewal Permit Without Changes · General Construction1–5 milyon $Existing 3-Story mixed use building, to be enlarged horizontally and combined to a mixed use building🔒 Adres ve yükleniciler
2026-10-27Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit Without Changes · General Construction1–5 milyon $PROPOSED VERTICAL ENLARGEMENT OF AN EXISTING 1-STORY WAREHOUSE BUILDING TO A 4-STORY 8-FAMILY BUILDING AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-26Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachInitial Permit · General Construction1–5 milyon $Replace main and bulkhead roofs and facade repairs as plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-10-26Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $Filing general construction work as per plan filed herewith. Related applications are filed under separate application in DOBnow. No change use, egress, and occupancy under this ap🔒 Adres ve yükleniciler
2026-10-26Brooklyn · East New York (North)Initial Permit · Structural1–5 milyon $HEREWITH FILING STRUCTURAL MODIFICATIONS FOR INTERIOR FIT-OUT PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-10-26Queens · Springfield Gardens (North)-Rochdale VillageInitial Permit · General Construction1–5 milyon $RENOVATE EXISTING LIBRARY SUITE 2368 - REMOVE EXISTING NON-STRUCTURAL PARTITIONS - MODIFY SUSPENDED CEILING- PROVIDE NEW NON-STRUCTURAL PARTITIONS - NO CHANGE IN USE - NO CHANGE IN🔒 Adres ve yükleniciler
2026-10-26Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $INSTALL NEW DUCTWORK AND UNITS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-26Manhattan · Tribeca-Civic CenterRenewal Permit with Changes · General Construction1–5 milyon $Proposed horizontal/vertical enlargement and change of use as per plans filed.🔒 Adres ve yükleniciler
2026-10-26Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-26Queens · WoodsideRenewal Permit Without Changes · General Construction1–5 milyon $New 6 story mix-use building with commercial, community facility and residential. Obtain new C of O.🔒 Adres ve yükleniciler
2026-10-26Manhattan · East Midtown-Turtle BayRenewal Permit with Changes · General Construction5–10 milyon $GENERAL CONSTRUCTION AND FACADE MODIFICATIONS TAKING PLACE ON FLOORS 2-21 AND ROOF AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-26Manhattan · Murray Hill-Kips BayInitial Permit · General Construction1–5 milyon $Installation of new partitions, doors, ceilings and finishes on the 16th floor (TD Bank- Marketing Floor 17) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-26Queens · SunnysideInitial Permit · Sprinklers1–5 milyon $Removal of existing plumbing fixtures and connected piping and extend piping to new plumbing fixtures as shown on plans. Removal and relocation of existing sprinklers heads, fire 🔒 Adres ve yükleniciler
2026-10-26Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction1–5 milyon $Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-26Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Structural1–5 milyon $Structural Modifications: Structural Steel Reinforcing and Reinforcing Existing Roof Slab on the 40-42 and Roof Levels as per plans (ATRU Abatement Filing.) No change to use, egres🔒 Adres ve yükleniciler
2026-10-26Bronx · Crotona Park EastRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING 🔒 Adres ve yükleniciler
2026-10-26Brooklyn · Clinton HillRenewal Permit Without Changes · General Construction1–5 milyon $Removal and installation of interior non load bearing partitions for the installation of an elevator Schaft as per plans filed.🔒 Adres ve yükleniciler
2026-10-26Bronx · Crotona Park EastRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING 🔒 Adres ve yükleniciler
2026-10-26Bronx · Crotona Park EastRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING 🔒 Adres ve yükleniciler
2026-10-26Brooklyn · Gravesend (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $THE REMOVAL OF EXISTING AIR TERMINALS AND DUCTWORK. THE REPLACEMENT OF EXISTING ROOFTOP AIR HANDLERS, EXHAUST AIR UNIT, AND ASSOCIATED DUCTWORK, PIPING, CONTROLS AND ACCESSORIES.3.🔒 Adres ve yükleniciler
2026-10-26Brooklyn · Gravesend (East)-HomecrestRenewal Permit with Changes · General Construction1–5 milyon $Application filed to combine #251 and #255 Avenue W, Block 7150, Lots 36 & 37. Also, a building renovation including a horizontal enlargement with a change in use, egress and occup🔒 Adres ve yükleniciler
2026-10-23Manhattan · Murray Hill-Kips BayInitial Permit · General Construction1–5 milyon $Remaining Steam Tunnel Enclosure System (Delegated Design)🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $TTD- CONST. FL 41 / MARKETING FL 43 - FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $TTD - CONST. FL 41 / MARKETING FL 43 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION AND NON-STRUCTURAL DEMO AS SHOWN ON PLANS. THERE WILL BE NO CH🔒 Adres ve yükleniciler
2026-10-23Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Plumbing1–5 milyon $PL/SP work as per plans.🔒 Adres ve yükleniciler
2026-10-23Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Plumbing1–5 milyon $Alterations to plumbing and sprinkler systems as per plans filed herewith🔒 Adres ve yükleniciler
2026-10-23Queens · Glen Oaks-Floral Park-New Hyde ParkRenewal Permit with Changes · General Construction1–5 milyon $PROPOSE A NEW 2ND STORY VERTICAL ENLARGEMENT TO EXISTING 1-STORY WITH CELLAR; AND CONVERSION FOR A NEW COMMERCIAL OFFICE BUILDING. OBTAIN NEW C OF O.🔒 Adres ve yükleniciler
2026-10-23Queens · AuburndaleInitial Permit · General Construction1–5 milyon $Install ventilation system for Boiler and Oil Tank Rooms, replace piping and miscellaneous equipment.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $TTD- CONST. FLS 42 THRU 44 / MARKETING FLS 44 THRU 46 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE NEW STAIRS AS SHOWNON PLANS.. THERE WILL BE NO CHANGE OF USE, OCCUP🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $TTD -CONSTRUCTION FLS: 24 & 39 / MARKETING FlS 26 & 41 - FILING HEREWITH MECHANICAL PLANS TO INDICATE DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRE🔒 Adres ve yükleniciler
2026-10-23Staten Island · Mariner's Harbor-Arlington-GranitevilleInitial Permit · Foundation1–5 milyon $PROPOSED 1 STORY ADDITION WITH MEZZANINE TO ENLARGE EXISTING LOBBY. GENERAL CONSTRUCTION, STRUCTURAL REINFORCEMENTS AND FOUNDATION FOOTINGS PER PLANS FILED.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $TTD - CONST. FL 42 / MARKETING FL 44 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION WORK AND NON-STRUCTURAL DEMO AS SHOWN ON PLANS. THERE WILL BE N🔒 Adres ve yükleniciler
2026-10-23Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction5–10 milyon $Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $TTD -CONST. FLS: 43RD & 44TH / MARKETING FLS 45 & 46 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION AND NON-TRUCTURAL SEMO AS SHOWN ON PLANS. THERE🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $OFFICE RENOVATION ON 12TH FLR - VESTAL POINT, WORK TO INCLUDE PARTITION, CEILING, AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-23Bronx · Fordham HeightsRenewal Permit with Changes · Structural1–5 milyon $Propose to gut rehab an existing masonry structure with floor system, including replacement of the exist. structural & nonstructural bldg. elements such as rotted floor joists, rus🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $TTD - CONST. FL 40 / MARKETING FL 42 - FILING HEREWITH FOR MECHANICAL DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Lower East SideInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL WORK FILED IN CONJUNCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $TTD - CONST. FL 40 / MARKETING FL 42 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION AND NON-STRUCTURAL DEO AS SHOWN ON PLANS. THERE WILL BE NO CHAN🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $TTD- CONST. FLS: 24 & 39 / MARKETING FlLS 26 & 41. FILING HEREWITH FOR GENERAL CONSTRUCTION WORK TO INCLUDE INTERIOR RENOVATION AND NON-STRUCTURAL DEMO AS SHOWN ON PLANS. THERE W🔒 Adres ve yükleniciler
2026-10-23Manhattan · Upper East Side-YorkvilleInitial Permit · General Construction1–5 milyon $FACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $TTD -CONST. FLS: 43RD & 44TH / MARKETING FLS 45 & 46 - FILING HEREWITH FOR MECHANICAL DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS AP🔒 Adres ve yükleniciler
2026-10-23Bronx · Mott Haven-Port MorrisRenewal Permit Without Changes · General Construction5–10 milyon $CMU BLOCK PINNING. MASONRY MORTAR REPAIR. CONCRETE CRACK REPAIR.REPLACEMENT OF WINDOWS AND DOORS. NEW LED EXTERIOR LIGHTING. ROOF AND FASCIA REPAIR ATAREAS OF CRACKING.🔒 Adres ve yükleniciler
2026-10-23Brooklyn · Clinton HillRenewal Permit Without Changes · General Construction1–5 milyon $Filing for facade repairs and roof replacement as per plans filed herewith no change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Structural1–5 milyon $REMOVAL OF TRAVERTINE VENEER. REMOVAL AND REPLACEMENT OF MASONRY BACKUP WALL AT 2ND THROUGH 5TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-23Manhattan · Murray Hill-Kips BayInitial Permit · Mechanical Systems1–5 milyon $Mechanical work in conjunction with Alt-CO, as shown on plans.🔒 Adres ve yükleniciler
2026-10-23Brooklyn · Sunset Park (West)Initial Permit · General Construction1–5 milyon $PROPOSED NEW 6-FAMILY FOUR STORY BUILDING. OBTAIN NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-22Manhattan · Financial District-Battery Park CityInitial Permit · General Construction10–50 milyon $Reach 4 - FBS includes elevated platform with precast decks, cast-in-place slabs/beams, floodwall to EL 16.5' on drilled shafts, roller gates, pipe-pile barrier, micropile T-wall, 🔒 Adres ve yükleniciler
2026-10-22Queens · WoodsideRenewal Permit with Changes · General Construction1–5 milyon $CONVERSION AND VERTICAL EXTENSION OF EXISTING 1 STORY FACTORY BUILDING TO 2 STORY OFFICE/STORAGE BUILDING WITH FIRST FLOOR AS INDOOR PARKING AREA. NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-22Brooklyn · Bushwick (West)Renewal Permit Without Changes · General Construction1–5 milyon $Face brick replacement. Remove and restore existing stone masonry and repoint. Gutter lining in existing gutter. Saw cut pavement and excavation provide concrete or smooth surface,🔒 Adres ve yükleniciler
2026-10-22Queens · Astoria (North)-Ditmars-SteinwayRenewal Permit Without Changes · General Construction1–5 milyon $Window replacement and exterior stairway replacement in kind. No change to use, occupancy, or egress🔒 Adres ve yükleniciler
2026-10-22Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST & 14TH FL ROOF BULKHEAD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-22Manhattan · Upper West Side-Lincoln SquareRenewal Permit with Changes · Full Demolition10–50 milyon $full demolition of 22 story structure using hand held and mechanical equipment to assist.🔒 Adres ve yükleniciler
2026-10-22Brooklyn · East WilliamsburgInitial Permit · General Construction5–10 milyon $Filing for building Enclosure rehabilitation to the facade and roof.🔒 Adres ve yükleniciler
2026-10-22Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-10-22Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $General contraction of interior partitions, doors, suspended ceilings, flooring and finishes on the 15th Floor (Dentons) as per plans No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-22Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $INSTALL ALL NEW MECHANICAL SYSTEMS IN BUILDING CONSISTING OF AIR COOLED HEAT RECOVERY COOLING/HEATING SYSTEM AND DEDICATED OUTDOOR AIR SYSTEM.🔒 Adres ve yükleniciler
2026-10-22Queens · JamaicaInitial Permit · General Construction1–5 milyon $HEREWITH FILING FOR A HORIZONTAL ENLARGEMENT TO ENCLOSE PARTIAL FIRST FLOOR OF A TWO STORY BUIDING. OBTAIN A NEW CO🔒 Adres ve yükleniciler
2026-10-22Brooklyn · FlatbushInitial Permit · Mechanical Systems1–5 milyon $Direct replacement in kind of (4) existing Air handling units serving IT Server space.🔒 Adres ve yükleniciler
2026-10-22Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $CHAPEL & SACRISTY- FACADE RESTORATION INCLUDING LOCALIZED BRICK AND BROWNSTONE MASONRY REPAIRS, SELECT ROOF REPLACEMENT, RECONSTRUCTION OF MASONRY TURRETS, STAINED AND LEADED-GLASS🔒 Adres ve yükleniciler
2026-10-22Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Plumbing1–5 milyon $Modifications to sprinkler and plumbing systems as per plans filed herewith. No change of use, occupancy or egress.🔒 Adres ve yükleniciler
2026-10-22Queens · Bay Terrace-ClearviewInitial Permit · General Construction1–5 milyon $THIS PROJECT IS A CONNECTION OF TWO EXISTING ONE STORY SPACES INTO ABREEZEWAY THAT CONNECTS THE TWO STORIES. THIS SCOPE INCLUDES NEWCONSTRUCTION OF A STAIR AND ELEVATOR, NEW FACADE🔒 Adres ve yükleniciler
2026-10-22Queens · Murray Hill-Broadway FlushingInitial Permit · General Construction1–5 milyon $Renovation of existing supermarket due to fire, address vacate order complaint #4A11591, no change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-10-22Brooklyn · East WilliamsburgInitial Permit · General Construction1–5 milyon $Renovation of existing office space, consisting of partial ceiling replacement, minor partition modifications, new roof membranes at bulkheads, & installation of a mechanical scree🔒 Adres ve yükleniciler
2026-10-22Manhattan · Tribeca-Civic CenterInitial Permit · Structural1–5 milyon $MODIFICATION OF TEMPORARY RAKER SHORING SYSTEM PREVIOUSLY FILED UNDER 123558159 TO ALLOW FOR NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121190497.🔒 Adres ve yükleniciler
2026-10-22Brooklyn · Windsor Terrace-South SlopeRenewal Permit Without Changes · General Construction1–5 milyon $PS 154 - K REPLACEMENT OF ALL OF ROOF NO.2 AND PARTIAL OF ROOF NO.1 INCLUDING FLASHINGAROUND PERIMETER OF ROOF NO.1 AND GUARDRAIL AT ROOF NO.2. INTERIOR FLOOR REPAIRS. AS PER PLANS🔒 Adres ve yükleniciler
2026-10-22Manhattan · East Harlem (South)Initial Permit · Structural5–10 milyon $HEREWITH FILING FOR STRUCTURAL MODIFICATIONS INCLUDING SHOULDER OVERBUILDS AND SLAB MODIFICATION AS PER PLANS.🔒 Adres ve yükleniciler
2026-10-22Queens · Astoria (East)-Woodside (North)Renewal Permit Without Changes · General Construction1–5 milyon $Propose 4 story 3 family new building🔒 Adres ve yükleniciler
2026-10-21Bronx · University Heights (South)-Morris HeightsRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical plans filed herewith🔒 Adres ve yükleniciler
2026-10-21Brooklyn · Gravesend (East)-HomecrestInitial Permit · General Construction1–5 milyon $HEREWITH FILING FOR HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION. NOCHANGE IN USE EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-21Brooklyn · Prospect HeightsRenewal Permit Without Changes · General Construction1–5 milyon $Vertical and horizontal enlargement and renovation of existing building.🔒 Adres ve yükleniciler
2026-10-21Brooklyn · Coney Island-Sea GateRenewal Permit with Changes · General Construction1–5 milyon $APPLICATION FILED TO HORIZONTALLY ENLARGE AND RENOVATE THE EXISTING 3-STORY + CELLAR SYNAGOGUE AND DORMITORY.🔒 Adres ve yükleniciler
2026-10-21Queens · WoodsideRenewal Permit Without Changes · Plumbing1–5 milyon $filing for the installation of plumbing fixtures and all associated work for plumbing as per plans.🔒 Adres ve yükleniciler
2026-10-21Bronx · Mott Haven-Port MorrisRenewal Permit Without Changes · General Construction1–5 milyon $Building rehabilitation of 42 apts, new kitchen and bathrooms, new windows, refinishing apt. floors, scrape, patch & paint apt. walls/ceiling, new build entry/vest. doors, new mail🔒 Adres ve yükleniciler
2026-10-21Manhattan · Tribeca-Civic CenterInitial Permit · Mechanical Systems1–5 milyon $Mechanical modifications as per plans🔒 Adres ve yükleniciler
2026-10-21Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction10–50 milyon $GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 15TH AND 16TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-21Bronx · Mott Haven-Port MorrisRenewal Permit Without Changes · General Construction1–5 milyon $Building rehabilitation of 42 apts, new kitchen and bathrooms, new windows, refinishing apt. floors, scrape, patch & paint apt. walls/ceiling, new build entry/vest. doors, new mail🔒 Adres ve yükleniciler
2026-10-21Queens · Queensboro HillInitial Permit · Mechanical Systems1–5 milyon $FIT OUT_INFUSION 6TH, 7TH, 8TH FLOORS AND ROOF - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-21Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Interior renovation of commercial office space - Removal/installation of interior non-bearing partitions & related finishes. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-10-21Brooklyn · Crown Heights (South)Initial Permit · General Construction5–10 milyon $General Construction work for Medgar Evers College🔒 Adres ve yükleniciler
2026-10-21Brooklyn · Fort GreeneInitial Permit · Mechanical Systems1–5 milyon $Alt. MS filed subsequently with the alt. GC application. Modify existing and install new HVAC components.🔒 Adres ve yükleniciler
2026-10-21Brooklyn · Prospect HeightsRenewal Permit Without Changes · General Construction10–50 milyon $Vertical and horizontal enlargement and renovation of existing building.🔒 Adres ve yükleniciler
2026-10-21Queens · SunnysideInitial Permit · Mechanical Systems5–10 milyon $Mechanical modifications taking place on floors 1-5 as per plans filed herewith. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-10-20Bronx · Throgs Neck-SchuylervilleInitial Permit · Mechanical Systems1–5 milyon $HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-20Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction5–10 milyon $Patching and repairing of existing roofing membrane with in-kind materials at new structural penetrations as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-20Brooklyn · GreenpointRenewal Permit with Changes · General Construction1–5 milyon $PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 3 STORY & CELLAR BUILDING.🔒 Adres ve yükleniciler
2026-10-20Queens · Pomonok-Electchester-HillcrestRenewal Permit Without Changes · General Construction1–5 milyon $Infrastructure to improve management of stormwater runoff from the tributary impervious surfaces. On-site Green Infrastructure Cloudburst Pilot Project. DEP Capital Contract No. GQ🔒 Adres ve yükleniciler
2026-10-20Queens · Long Island City-Hunters PointInitial Permit · General Construction1–5 milyon $TO CONVERT A WAREHOUSE TO AN INDOOR AMUSEMENT PLAYGROUND ON 1ST FLOOR. TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-20Queens · SunnysideRenewal Permit Without Changes · Structural1–5 milyon $Q125- Flood elimination, interior wall and courtyard repair, mitigation of interior water damage, excavation and waterproofing foundation walls.🔒 Adres ve yükleniciler
2026-10-20Brooklyn · East New York-New LotsInitial Permit · Structural10–50 milyon $Structural filing for partial demolition of existing building and construction of new building using existing elements as per plans filed. Changes to use, egress, and occupancy bas🔒 Adres ve yükleniciler
2026-10-20Brooklyn · Bedford-Stuyvesant (West)Initial Permit · General Construction1–5 milyon $NYCHA BOILER - Removal of boilers and related equipment, replacement of equipment to remain, and related minor exterior work. NO CHANGE TO USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-20Queens · Astoria (North)-Ditmars-SteinwayInitial Permit · Foundation5–10 milyon $remove existing asphalt in the lot with in the area of work, install new subsurface stormwater infiltration system, repave the area with new asphalt, replace existing fence in plac🔒 Adres ve yükleniciler
2026-10-20Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · General Construction1–5 milyon $Interior Renovation on 5th Floor.🔒 Adres ve yükleniciler
2026-10-20Queens · AuburndaleRenewal Permit Without Changes · General Construction1–5 milyon $ENLARGEMENT OF EXISTING COMMERCIAL BUILDING IN CONJUNCTION WITH SI#421842395. NEW CERTIFICATE OF OCCUPANCY FOR 2-STORY COMMERCIAL BUILDING.🔒 Adres ve yükleniciler
2026-10-20Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Mechanical Systems1–5 milyon $INSTALLATION OF NEW MECHANICAL SYSTEMS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-20Bronx · LongwoodRenewal Permit Without Changes · General Construction1–5 milyon $BUILDING REHABILITATION AS FLOOWS: EXTERIOR REPAIRS, NEW BUILDING ENTRY AND VEST. DOORS, KITCHEN CABINET, BATH. WALL/FLOOR SURFACE REPLACEMENT, REPAIR FLOOR/WALL SURFACES, IN EACH🔒 Adres ve yükleniciler
2026-10-20Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $Interior renovation on parts of 13th and 14th floors related to conference center.🔒 Adres ve yükleniciler
2026-10-20Bronx · University Heights (North)-FordhamInitial Permit · General Construction1–5 milyon $THE SCOPE INCLUDES STRUCTURAL FLOOR REPAIRS, RECONFIGURATION AND MODERNIZATION OF KITCHEN AND BATHROOM LAYOUTS, INSTALLATION OF NEW FINISHES THROUGHOUT, AND REPLACEMENT OF ALL DOOR🔒 Adres ve yükleniciler
2026-10-20Staten Island · Westerleigh-Castleton CornersInitial Permit · Earth Work1–5 milyon $remove and replace pavement, install basketball court, install new fitness units.🔒 Adres ve yükleniciler
2026-10-20Brooklyn · Bath BeachRenewal Permit Without Changes · General Construction1–5 milyon $Exterior Masonry work such as re-pointing of masonry joints, brick replacement areas, cleaning of face brick efflorescence, and sealant replacement of all coping stone joints and w🔒 Adres ve yükleniciler
2026-10-20Manhattan · Upper West Side-Lincoln SquareRenewal Permit with Changes · General Construction1–5 milyon $RENOVATION OF EXISTING HOUSE OF WORSHIP, INT & EXT DEMO, GENERAL CONSTRUCTION. REMOVAL & REPLACEMENT OF EXISTING FACADE INCLUDING ORNAMENTAL TOWER/SPIRE, EXISTING ARCADE & EXTERIOR🔒 Adres ve yükleniciler
2026-10-19Brooklyn · East New York-New LotsRenewal Permit with Changes · Plumbing1–5 milyon $REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPL🔒 Adres ve yükleniciler
2026-10-19Brooklyn · Brooklyn HeightsInitial Permit · General Construction5–10 milyon $Modification of existing building to include General construction, facade and roof work as well as a change in use on the first floor.🔒 Adres ve yükleniciler
2026-10-19Manhattan · Manhattanville-West HarlemRenewal Permit with Changes · General Construction1–5 milyon $NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS.🔒 Adres ve yükleniciler
2026-10-19Manhattan · Manhattanville-West HarlemInitial Permit · Mechanical Systems1–5 milyon $APPLICATION FILED FOR MODIFICATION TO EXISTING HVAC SYSTEM INCLUDING A NEW AIR HANDLING UNIT, NEW DUCTWORK AND ASSOCIATED MECHANICAL WORK.🔒 Adres ve yükleniciler
2026-10-19Bronx · AllertonInitial Permit · General Construction1–5 milyon $Roofing replacement and rooftop structure renovation🔒 Adres ve yükleniciler
2026-10-19Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Filing herewith interior demo. and renovation on the 39th FL. (37th Construction, 39th Marketing) as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-19Brooklyn · Bushwick (East)Initial Permit · General Construction1–5 milyon $Exterior masonry repair and replacement, interior water infiltration remediation🔒 Adres ve yükleniciler
2026-10-19Queens · SunnysideRenewal Permit Without Changes · General Construction1–5 milyon $INSTALLATION OF AN OPEN NON-ACCESSORY BATTERY ENERGY STORAGE SYSTEMS INCONJUNCTION WITH Q01010975.🔒 Adres ve yükleniciler
2026-10-19Brooklyn · BrownsvilleInitial Permit · Sprinklers1–5 milyon $SPRINKLER SYSTEM FILED IN CONJNCTION WITH ALT CO JOB NUMBER B01246769-I1.🔒 Adres ve yükleniciler
2026-10-19Brooklyn · FlatbushInitial Permit · General Construction1–5 milyon $Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Roof (Kings-Theater) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-19Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-10-19Manhattan · East Midtown-Turtle BayInitial Permit · General Construction10–50 milyon $Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 38th floor (Ares- Buildout) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-19Manhattan · East Harlem (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $NYCHA EAST RIVER BOILERS CONSISTING OF MECHANICAL WORK FOR BOILER REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-19Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Lobby renovation, with installation of new partitions, doors, suspended ceilings, and finishes on the 1st Floor (Lobby), as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-19Brooklyn · Bedford-Stuyvesant (East)Renewal Permit Without Changes · Structural1–5 milyon $NYCHA Sumner Building 6- Proposed Structural work.🔒 Adres ve yükleniciler
2026-10-19Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit Without Changes · General Construction10–50 milyon $ROOFING REPLACEMENT, MASONRY REPAIRS, PARAPET REPAIRS AND PARTIAL REPLACEMENT, LIMITED WINDOW AND EXTERIOR DOOR REPLACMENT, CONCRETE WALL, SLAB, AND VAULT REPAIRS AT CELLAR, CONCRE🔒 Adres ve yükleniciler
2026-10-19Queens · SunnysideRenewal Permit Without Changes · General Construction1–5 milyon $installation of a BESS system in conjunction with EESE filing🔒 Adres ve yükleniciler
2026-10-16Bronx · Williamsbridge-OlinvilleInitial Permit · Structural1–5 milyon $New 233rd Street Pumping Station. NYC DEP Capital Project WP-269 PS-DES-2 Pumping Stations.🔒 Adres ve yükleniciler
2026-10-16Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction5–10 milyon $Interior Renovation as per plans filed herewith. No change of use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-16Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $FILING FOR INTERIOR RENO FOR 7TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-16Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction50 milyon $ üzeriAlt-CO being filed for the conversion of a commercial building to a residential use per Article 1 Chapter 5.🔒 Adres ve yükleniciler
2026-10-16Brooklyn · Brooklyn Navy YardRenewal Permit Without Changes · Structural1–5 milyon $Installation of Electrical Platform as per plans. SUBSTATION G BUILDING 386, no change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-10-16Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $RENOVATION OF EXISTING 39TH FLOOR OFFICE SUITE FOR NEW OFFICES & CONFERENCE ROOMS, INCLUDING DEMOLITION OF EXISTING AND CONSTRUCTION OF NEW INTERIOR PARTITIONS, FINISHES, DOORS, C🔒 Adres ve yükleniciler
2026-10-16Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems5–10 milyon $MECHANICAL WORK TO REMOVE EXISTING COOLING TOWER AND INSTALL OF HEAT PUMP CHILLERS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-16Manhattan · Tribeca-Civic CenterRenewal Permit Without Changes · General Construction5–10 milyon $Interior renovation of the Cellar (A Level), including ceilings, partitions, floors and finishes as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-15Bronx · Bedford ParkInitial Permit · General Construction1–5 milyon $Lehman College, Carman Hall Courtyards & Main Staircases waterproofing: Removal / replacement /repairs of waterproofing membrane, spalled concrete & deteriorated reinforcements, fl🔒 Adres ve yükleniciler
2026-10-15Manhattan · Manhattanville-West HarlemRenewal Permit with Changes · General Construction1–5 milyon $NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Upper West Side (Central)Renewal Permit Without Changes · Full Demolition1–5 milyon $full demolition of four story structure🔒 Adres ve yükleniciler
2026-10-15Manhattan · Manhattanville-West HarlemRenewal Permit with Changes · General Construction1–5 milyon $NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS.🔒 Adres ve yükleniciler
2026-10-15Brooklyn · Brooklyn Navy YardInitial Permit · Standpipe1–5 milyon $Bldg 3: Revisions to the existing fire sprinkler system and standpipe.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Financial District-Battery Park CityInitial Permit · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy🔒 Adres ve yükleniciler
2026-10-15Brooklyn · East New York-New LotsInitial Permit · General Construction1–5 milyon $GC work correspondent to the installation of a new water line and RPZ within an existing comfort station @Jerome Playground Comfort Station. All as per plans filed herewith.🔒 Adres ve yükleniciler
2026-10-15Queens · Flushing Meadows-Corona ParkInitial Permit · Foundation50 milyon $ üzeriFILING HEREWITH FOUNDATION/EARTHWORK FOR TEMPORARY PARKING AREA AS PER PLANS. FILED UNDER MPP Project-000000254.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy🔒 Adres ve yükleniciler
2026-10-15Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $General construction plans filed herewith to show interior renovations. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-15Queens · Astoria (East)-Woodside (North)Initial Permit · Mechanical Systems1–5 milyon $THIS APPLICATION IS FILED FOR MECHANICAL WORKTYPE IN CONJUNCTION WITH Q00921620-I1.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $PROPOSED CONVERSION OF EXISTING NINE (9) STORY COMMERCIAL BUILDING USE TO RESIDENTIAL & COMMERCIAL USE AND ADDITION OF SIX (6) STORIES.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Upper West Side (Central)Initial Permit · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, AND CEILINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-15Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $Installation of a new HVAC system on the 38th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Manhattanville-West HarlemRenewal Permit with Changes · General Construction1–5 milyon $NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS.🔒 Adres ve yükleniciler
2026-10-15Queens · Flushing Meadows-Corona ParkRenewal Permit with Changes · General Construction50 milyon $ üzeriMPP#442/NYC DEV HUB FILING: Application filed for renovations to Arthur Ashe Stadium and updated layouts to obtain new CO.🔒 Adres ve yükleniciler
2026-10-15Manhattan · East VillageInitial Permit · General Construction1–5 milyon $Upgrading school auditorium (lights, PA system, finishes).🔒 Adres ve yükleniciler
2026-10-15Manhattan · Manhattanville-West HarlemRenewal Permit with Changes · General Construction1–5 milyon $NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Manhattanville-West HarlemRenewal Permit with Changes · General Construction1–5 milyon $NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS.🔒 Adres ve yükleniciler
2026-10-15Manhattan · West VillageRenewal Permit Without Changes · General Construction1–5 milyon $General Construction modifications taking place on floors CEL-006 as per plans filed herewith. No change in Use, Egress or Occupancy.🔒 Adres ve yükleniciler
2026-10-15Manhattan · Murray Hill-Kips BayInitial Permit · General Construction1–5 milyon $General construction associated with lobby renovation on 1st floor as per plans filed herewith. No changes in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-14Manhattan · West VillageRenewal Permit Without Changes · Plumbing1–5 milyon $Installation of new plumbing infrastructure, fixtures and related piping for proposed 5-story multi-family residential building with accessory parking storage.🔒 Adres ve yükleniciler
2026-10-14Manhattan · Morningside HeightsRenewal Permit with Changes · General Construction1–5 milyon $MS MORNINGSIDE - CHAPEL PAVILION FACADE REPAIRS - GENERAL CONSTRUCTION INCLUDING FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Bedford-Stuyvesant (East)Renewal Permit Without Changes · Structural10–50 milyon $INT. REMOVALS & INSTALLATIONS OF NON-LOAD BEARING PARTITIONS, FLOOR, WALL & CLG FINISHES. REPAIR/REPLACEMENT OF WINDOWS & 1FL FRONT ENTRY AND ROOF MEMBRANE/INSULATION REPAIR AND/OR🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Gravesend (South)Renewal Permit with Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-14Queens · Astoria (East)-Woodside (North)Initial Permit · General Construction1–5 milyon $installation of energy storage system in open space. no change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Bedford-Stuyvesant (East)Renewal Permit Without Changes · General Construction5–10 milyon $P.S. 057-K: Window replacement, limited facade maintenance/renovation, limited repaving, replacement of exterior lighting fixtures, parapet repairs, and miscellaneous exterior repa🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Brooklyn HeightsInitial Permit · General Construction1–5 milyon $Sidewalk wearing course, curb and limited roadway paving replacement at Court Street & Montague Street frontages over vault water proofing and below grade sidewalk vault structural🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Bay RidgeInitial Permit · Structural1–5 milyon $Conversion of the reail space to the day care center🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Gravesend (East)-HomecrestRenewal Permit with Changes · General Construction1–5 milyon $COMPLETE RENOVATION OF THE EXISTING BUILDING, HORIZONTAL AND VERTICAL EXTENSIONS, PARTITIONS🔒 Adres ve yükleniciler
2026-10-14Manhattan · West VillageRenewal Permit Without Changes · General Construction1–5 milyon $MISCELLANEOUS FACADE, ROOF AND TERRACE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-14Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Sidewalk Shed1–5 milyon $INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookInitial Permit · General Construction1–5 milyon $New elevator addition and existing building alterations for ADA compliance including but not limited to: accessible toilets, exterior accessible ramp, fire rescue rooms and other u🔒 Adres ve yükleniciler
2026-10-14Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-10-14Brooklyn · East WilliamsburgInitial Permit · General Construction1–5 milyon $Repair of roof and replacement of skylights. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-14Manhattan · Upper West Side-Lincoln SquareRenewal Permit with Changes · Structural1–5 milyon $MSW - WEST BUILDING FISP SUB-CYCLE FACADE REPAIRS - GENERAL CONSTRUCTION FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Gravesend (South)Renewal Permit with Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-14Bronx · Morris ParkInitial Permit · General Construction1–5 milyon $ARCHTECTURAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-14Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachInitial Permit · Structural5–10 milyon $structural work at cellar as needed. Related Job Numbers: B01266291-I1; B01266291-S1; B01266291-S2; B01266291-S3; B01322412-I1🔒 Adres ve yükleniciler
2026-10-14Queens · Queensbridge-Ravenswood-Dutch KillsRenewal Permit Without Changes · General Construction1–5 milyon $PROPOSED NEW BUILDING WITH EXISTING ELEMENTS TO REMAIN FOR A 4 STORY MIXED USE BUILDING WITH 6 CLASS A DWELLING UNITS🔒 Adres ve yükleniciler
2026-10-14Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · Mechanical Systems1–5 milyon $Modification of mechanical systems as per plans filed herewith.🔒 Adres ve yükleniciler
2026-10-14Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit with Changes · Structural10–50 milyon $Structural work for the construction of new 23 story Mixed Use Building as per plans filed🔒 Adres ve yükleniciler
2026-10-13Brooklyn · Ocean HillInitial Permit · General Construction1–5 milyon $Exterior Facade Repair🔒 Adres ve yükleniciler
2026-10-13Brooklyn · Ocean HillRenewal Permit Without Changes · General Construction1–5 milyon $New addition foundation walls, excavation and backfill, concrete basement slab on grade, floor framing for floors 1-4, reinforce masonry exterior bearing walls, steel support colum🔒 Adres ve yükleniciler
2026-10-13Manhattan · Upper West Side (Central)Initial Permit · Plumbing1–5 milyon $PLUMBING WORK CONSISTING OF REPLACEMENT OF EXISTING HOT WATER HEATERS, DOMESTIC BOOSTER PUMPS, A SEWAGE EJECTOR PUMP, THE EXISTING NATURAL GAS SYSTEM AND EXISTING PLUMBING FIXTUR🔒 Adres ve yükleniciler
2026-10-13Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandInitial Permit · General Construction1–5 milyon $THIS IS A HUB PROJECT. Remove interior partitions and construct temporary protection on floors basement, and 1 through 5 in the existing commercial building as per plans filed her🔒 Adres ve yükleniciler
2026-10-13Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandInitial Permit · General Construction1–5 milyon $HUB JOB- MPP 678. Construction of new restrooms on floors 7-9 in the existing building including alterations for mechanical equipment in penthouse. Install rated construction at f🔒 Adres ve yükleniciler
2026-10-13Manhattan · Upper West Side (Central)Initial Permit · General Construction1–5 milyon $Application filed to demise existing retail spaces into (3) retail spaces on first floor and work in cellar. No change in use, egress and occupancy🔒 Adres ve yükleniciler
2026-10-13Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Interior renovation work in commercial office space to include construction of new partitions, finishes, new doors, ceilings, new core restrooms, new warming pantry, meeting spaces🔒 Adres ve yükleniciler
2026-10-13Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Sprinklers1–5 milyon $Sprinkler and Standpipe work associated with the conversion.🔒 Adres ve yükleniciler
2026-10-13Queens · Flushing Meadows-Corona ParkRenewal Permit Without Changes · Foundation1–5 milyon $Foundation work related to renovation of existing stadium structure including reinforcement of the existing steel columns for loads imposed by future work (ASHE STADIUM)🔒 Adres ve yükleniciler
2026-10-13Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · General Construction1–5 milyon $Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-10-13Queens · Ozone ParkInitial Permit · General Construction1–5 milyon $HEREWITH FILING A ZERO LOT LINE THREE STORY WITH CELLAR HOUSE OF WORSHIP.🔒 Adres ve yükleniciler
2026-10-13Bronx · Pelham Bay ParkRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of a fuel oil storage tank 8000 gallon.🔒 Adres ve yükleniciler
2026-10-13Bronx · Soundview-Bruckner-Bronx RiverInitial Permit · Plumbing1–5 milyon $X123: Subsequent filing of plumbing work type. Removal and replacement of roof, area drains and associate piping.🔒 Adres ve yükleniciler
2026-10-13Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachRenewal Permit with Changes · General Construction5–10 milyon $Modernization of NYCHA housing building, to be vacated during construction.🔒 Adres ve yükleniciler
2026-10-13Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · Mechanical Systems1–5 milyon $REPLACEMENT OF CHILLER, PROVIDE NEW PAD FOR HEAT EXCHANGER, PROVIDE NEW HEAT EXCHANGER ALONG WITH COOLING TOWER MODIFICATIONS🔒 Adres ve yükleniciler
2026-10-13Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction5–10 milyon $INSTALLATION OF NON-LOAD BEARING WALLS, FLOORS, CEILING AND FINISHES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-13Manhattan · Midtown-Times SquareInitial Permit · Full Demolition1–5 milyon $Full demolition of structure🔒 Adres ve yükleniciler
2026-10-13Queens · RidgewoodInitial Permit · Mechanical Systems1–5 milyon $Install New Mechanical Systems within Structural Steel Framing that was reconstructed under Investigative Environmental Probes Under DOBNOW Permitted Application #Q00934566-I1 and 🔒 Adres ve yükleniciler
2026-10-13Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $Alteration, addition of (4) electric baseboard radiators, (7) supplemental water source heat pumps, associated ducts, and piping. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-13Queens · Kew Gardens HillsInitial Permit · General Construction1–5 milyon $HEREWITH FILING DEMO & CONSTRUCTION TO EXISTINGS WALLS, DOORS, AND PARTITIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.🔒 Adres ve yükleniciler
2026-10-13Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachRenewal Permit with Changes · General Construction5–10 milyon $nycha modernization🔒 Adres ve yükleniciler
2026-10-13Manhattan · Harlem (North)Initial Permit · Structural1–5 milyon $BUILDING #1: INSTALLATION OF TEMPORARY SHORING FOR COLUMN REPAIRS AS PER PLANS.🔒 Adres ve yükleniciler
2026-10-13Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $Alteration, addition of (2) supplemental water source heat pump, (16) supplemental VRF evaporators, (4) water source condensing units, associated ducts, and piping. No change to us🔒 Adres ve yükleniciler
2026-10-13Brooklyn · Mapleton-Midwood (West)Renewal Permit Without Changes · General Construction5–10 milyon $INTERIOR DEMOLITION AND RENOVATION OF SCHOOL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-09Queens · RidgewoodInitial Permit · Plumbing1–5 milyon $Install Sprinkler and Standpipe systems modifications within floors 001, 002, 003 in conjunction with original Environmental Investigative Probe and Foundation Removal Application 🔒 Adres ve yükleniciler
2026-10-09Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.🔒 Adres ve yükleniciler
2026-10-09ManhattanRenewal Permit Without Changes · General Construction1–5 milyon $NEW EQUIPMENT SUPPORT BUILDING (NORTH) FOR DEP AS PART OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT IN EAST RIVER PARK.🔒 Adres ve yükleniciler
2026-10-09Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction10–50 milyon $JOB WAS ACCEPTED TO HUB AT CONSULTATION ON 7/18/23. PROPOSED CHANGE OF USE FROM UG 3 & 4 TO UG V & VIII. HORIZONTAL ENLARGEMENT AT 6TH FLOOR & ROOF. INTERIOR AND EXTERIOR RENOVATIO🔒 Adres ve yükleniciler
2026-10-09Bronx · Pelham Parkway-Van NestInitial Permit · Structural1–5 milyon $See comments.Demo ex. steel dunnage syst@roof level,inst.new one to support rooftop equip. New dunnage t/be anchored to existing roof structural framing to be reinforced. Local.con🔒 Adres ve yükleniciler
2026-10-09Queens · Flushing Meadows-Corona ParkRenewal Permit with Changes · General Construction5–10 milyon $NYC DEV HUB: Selective architectural related demolition in preparation for future renovations at Arthur Ashe Stadium🔒 Adres ve yükleniciler
2026-10-09Manhattan · Harlem (North)Renewal Permit Without Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-09Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $REMOVAL AND CONSTRUCTION OF INTERIOR PARTITIONS, CEILINGS,DOORS, AND FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TOUSE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-09Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $GENERAL CONSTRUCTION TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-09Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL WORK TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · Structural1–5 milyon $DevHUB Consultation 7.18.2025 @2pm. Application filed for structural work associated with horizontal and vertical enlargement.🔒 Adres ve yükleniciler
2026-10-08Bronx · Bedford ParkInitial Permit · Mechanical Systems5–10 milyon $Replacement of air handler units and associated duct work at existing CUNY Library Lehman College Shuster Hall🔒 Adres ve yükleniciler
2026-10-08Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Additions & modifications to existing mechanical system and related piping. Interior partitions work filed under DOBNOW #M00450681. File in conjuction with Alt I # 123907512. No ch🔒 Adres ve yükleniciler
2026-10-08Staten Island · Westerleigh-Castleton CornersRenewal Permit Without Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-08Manhattan · East Harlem (North)Initial Permit · General Construction1–5 milyon $HEREBY FILING GUT RENOVATION WITH VERTICAL AND HORIZONTAL ENLARGEMENT (AT REAR) TO EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED PLUMBING/SPRINKLER WO🔒 Adres ve yükleniciler
2026-10-08Brooklyn · East Flatbush-ErasmusRenewal Permit Without Changes · Structural1–5 milyon $EXTERIOR RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQURED TO BE FILED SEPARATELY.🔒 Adres ve yükleniciler
2026-10-08Brooklyn · FlatbushRenewal Permit Without Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS FILED HEREWITH.. NO CHANGE TO USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-08Manhattan · Upper West Side-Lincoln SquareInitial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site Yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-08Manhattan · The Battery-Governors Island-Ellis Island-Liberty IslandRenewal Permit Without Changes · General Construction1–5 milyon $Governor's Island: Civil work - Installing new curb and sidewalk as per site layout plan. Installing drainage pipe. Removal of landscape feature wall.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Upper East Side-YorkvilleRenewal Permit Without Changes · General Construction1–5 milyon $application filed for facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Midtown-Times SquareInitial Permit · Plumbing1–5 milyon $Modification to plumbing fixtures as per plans filed herewith.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction1–5 milyon $SELECTIVE BRICK MASONRY REPLACEMENT, STONE SILL REPLACEMENT, LINTEL REPLACEMENT, PARAPET RECONSTRUCTION, CHIMNEY RECONSTRUCTION, MARBLE STONE PATCHING/REPLACEMENT, BLUESTONE REP🔒 Adres ve yükleniciler
2026-10-08Brooklyn · Sunset Park (West)Initial Permit · General Construction1–5 milyon $VERTICAL ENLARGEMENT OF EXISTING 1-STORY COMMERCIAL BUILDING TO CREATE A MIXED-USE BUILDING AS PER THE DRAWINGS FILED HEREIN.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Filing herewith application for mechanical systems modifications. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-08Queens · BaysideInitial Permit · General Construction1–5 milyon $Herewith filing interior alterations, change of use at second floor, for proposed restaurant build out.🔒 Adres ve yükleniciler
2026-10-08Brooklyn · Prospect ParkRenewal Permit Without Changes · Mechanical Systems1–5 milyon $APPLICATION IS FILED FOR MECHANICAL/ARCHITECTURAL WORK ASSOCITED WITH THE INSTALLATION OF THE HYDRONIC DISTRIBUTION PIPING FROM CELLAR TO ALL FLOORS AT BROOKLYN MUSEUM, IT WILL BE 🔒 Adres ve yükleniciler
2026-10-08Brooklyn · Sunset Park (West)Initial Permit · Mechanical Systems1–5 milyon $MH: Provide new mechanical systems to serve the building. No change in use, occupancy, or egress.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Financial District-Battery Park CityInitial Permit · General Construction5–10 milyon $General construction as shown on plans filed herewith. No change in use, egress, and occupancy.🔒 Adres ve yükleniciler
2026-10-08Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $amend c of o to reflect proposed build out of eating and drinking establishment with accessory kitchen in cellar and mechanical equipment at mezzanine🔒 Adres ve yükleniciler
2026-10-07Manhattan · Harlem (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $M076-INSTALLATION OF DUCTWORK & PIPING, EXHAUST FANS, VENTILATORS & GRAVITY VENTILATORS & AUTOMATIC TEMP CONTROLS.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $General construction as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-07Staten Island · Port RichmondRenewal Permit Without Changes · General Construction1–5 milyon $ENLARGEMENT OF WAREHOUSE, ONE STORY AND MEZZANINE🔒 Adres ve yükleniciler
2026-10-07Brooklyn · Bedford-Stuyvesant (West)Initial Permit · Foundation1–5 milyon $Foundation and structure for new elevator lobby on cellar through fifth floor. This is a SHPO Building.🔒 Adres ve yükleniciler
2026-10-07Staten Island · Oakwood-RichmondtownRenewal Permit Without Changes · General Construction5–10 milyon $Filing here general construction work related to demolition of equipment, concrete pads, repairs, patch and repaint related to replacement and installation of sludge thickening equ🔒 Adres ve yükleniciler
2026-10-07Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · General Construction1–5 milyon $PROPOSED CONCRETE PADS FOR CON EDISONS ELECTRICAL EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCPANCY.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $REPAIRS TO FACADE PANELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Tribeca-Civic CenterRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Manhattan Family Court - Mechanical work on the sub-cellar, cellar, 1st mezzanine, 1st thru 12th floor as indicated on drawings.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Manhattanville-West HarlemRenewal Permit Without Changes · Mechanical Systems1–5 milyon $REPLACEMENT OF EXISTING DUCTWORK AND ACCESSORIES, FIRE DAMPERS, SUPPLY AND RETURN GRILLES AND BALANCING THE VENTILATION SYSTEM.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction1–5 milyon $HEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Tribeca-Civic CenterRenewal Permit Without Changes · General Construction1–5 milyon $Filing application for interior renovation of restaurant space in cellar and first floor. Work includes installation of interior non-load bearing partitions and finishes. No change🔒 Adres ve yükleniciler
2026-10-07Bronx · Williamsbridge-OlinvilleRenewal Permit with Changes · General Construction1–5 milyon $REPLACEMENT OF MAIN AND BULKHEAD ROOFS, BALCONY REPAIRS, PARAPET REPLACMENT, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER🔒 Adres ve yükleniciler
2026-10-07Queens · Glen Oaks-Floral Park-New Hyde ParkInitial Permit · Sprinklers1–5 milyon $Northwell LIJ Sprinkler Upgrade project - Research Wing: sprinkler upgrades throughout building, as per plans filed herewith.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Tribeca-Civic CenterInitial Permit · Structural1–5 milyon $Modification to structural work as per plans filed herewith showing steel dunnages for MEP units. No change of use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-10-07Brooklyn · Prospect Lefferts Gardens-WingateInitial Permit · General Construction1–5 milyon $3RD Floor CTF Sensory Room Conversion combining two classrooms and accessory office. The 3RD Floor Path of Travel involves the replacement of Drinking Fountain with Water Bottle Re🔒 Adres ve yükleniciler
2026-10-07Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachRenewal Permit Without Changes · General Construction1–5 milyon $REMOVE EXISTING 200KW TURBINE GENERATOR AND EXISTING 350KWDIESEL ENGINE ON FIRST FLOOR. REMOVE EXISTING INTERIOR PARTITIONSIN ORDER TO ENLARGE ROOM FOR NEW ELECTRICAL SWITCH GEAR.P🔒 Adres ve yükleniciler
2026-10-07Queens · Glen Oaks-Floral Park-New Hyde ParkInitial Permit · Sprinklers1–5 milyon $Northwell LIJ Sprinkler Upgrade project - West Wing: sprinkler upgrades throughout building, as per plans filed herewith.🔒 Adres ve yükleniciler
2026-10-07Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction5–10 milyon $General construction as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-07Manhattan · GramercyRenewal Permit with Changes · General Construction5–10 milyon $Conversion of Existing 12 story Office Building to Residential and Commercial Mixed Use🔒 Adres ve yükleniciler
2026-10-06Manhattan · Hell's KitchenInitial Permit · General Construction1–5 milyon $Interior renovation of Life Time Fitness. No change in egress, use or occupancy.🔒 Adres ve yükleniciler
2026-10-06Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $Wash. Houses 07, Ext Facade repairs: Repairs at exposed concrete slab/foundation wall, reconstruction of exterior wythe of cavity wall system, mortar joint repointing, masonry repa🔒 Adres ve yükleniciler
2026-10-06Brooklyn · East New York (North)Initial Permit · Mechanical Systems1–5 milyon $K435- INSTALL NEW SPLIT COOLING SYSTEM /DUCTED SPLIT COOLING SYSTEM. NEW VENTILATORS, EXHAUST FANS, MAKEUP AIR UNIT.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · Mechanical Systems10–50 milyon $DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AIR HANDLING UNITS, FAN COIL UNITS, FANS.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction10–50 milyon $HUNTER COLLEGE NORTH BUILDING. RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-06Brooklyn · Gravesend (East)-HomecrestInitial Permit · General Construction1–5 milyon $alteration application to do enlargement and interior and exterior renovations🔒 Adres ve yükleniciler
2026-10-06Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Replacement of existing water cooled centrifugal chillers on the 2nd floor with new with related piping and ductwork as per plans filed herewith.🔒 Adres ve yükleniciler
2026-10-06Queens · Rego ParkInitial Permit · Plumbing1–5 milyon $Q174- REPLACE ROOF DRAINS,FLOOR DRAINS & STORM PIPING WITH NEW. REPLACING SUMP PUMP WITH NEW. REMOVE EXISTING HW TANK, GAS PIPING, BOOSTER HEATER & ALL ITS APPURTENANCES. RELOCATE 🔒 Adres ve yükleniciler
2026-10-06Queens · Long Island City-Hunters PointInitial Permit · Mechanical Systems10–50 milyon $Provide new AHUs for each floor and associate duct work and VAV boxes. Provide dedicated kitchen exhaust and make-up air for the culinary lab. All plans filed as herewith.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $General construction as shown on plans. Work to include demolition and fit out of existing restaurant space.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit Without Changes · General Construction1–5 milyon $One story vertical extension on top of the existing 5-story mixed-use building, including facade repair, rehabilitation, and partial demolition on all floors, to convert to a resid🔒 Adres ve yükleniciler
2026-10-06Manhattan · Tribeca-Civic CenterRenewal Permit Without Changes · Plumbing1–5 milyon $Modifications of the plumbing fixtures for the Men's and Women's Bathrooms, No change of egress, use or occupancy.🔒 Adres ve yükleniciler
2026-10-06Bronx · AllertonInitial Permit · General Construction1–5 milyon $Roofing replacement and rooftop structure renovation🔒 Adres ve yükleniciler
2026-10-06Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Facade repairs, FISP 9B repairs, as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-06Bronx · Mott Haven-Port MorrisInitial Permit · Support of Excavation1–5 milyon $SUPPORT OF EXCAVATION FOR RENOVATIONS TO THE EXISTING BUILDINGS, INCLUDING NEW FOUNDATIONS, ELECTRICAL UTILITIES, AND STORM WATER MANAGEMENT FACILITIES. EXCAVATION SUPPORT CONSISTS🔒 Adres ve yükleniciler
2026-10-06Bronx · AllertonInitial Permit · General Construction1–5 milyon $Roofing replacement and rooftop structure renovation🔒 Adres ve yükleniciler
2026-10-06Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction5–10 milyon $NYU - Infrastructure Package - INFRASTRUCTURE MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH AND NEW ELEVATOR BULKHEAD. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $GENERAL CONSTRUCTION, COLUMN AND WALKWAY RESTORATION AS PER PLANS HEREWITH FILED.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $Architectural scope associated with the interior renovation of a duplex apt. 24A/25A located on 22-23FL levels. No Change of use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-06Bronx · Throgs Neck-SchuylervilleRenewal Permit Without Changes · General Construction5–10 milyon $X072- Exterior Masonry Repairs, Parapet Repairs, and Window Replacement🔒 Adres ve yükleniciler
2026-10-06Queens · Astoria (Central)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $MECHANICAL UPGRADES AND CHILLER REPLACEMENT ON ROOF AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-06Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $NYCHA EAST RIVER BOILERS CONSISTING OF GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Upper West Side-Lincoln SquareInitial Permit · General Construction1–5 milyon $Facade repairs to include masonry, pointing, lintels, sills, coping stones, caulking, scrape, prime, and paint exposed steel. Vertical and horizontal concrete patching of cracks.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $EXTERIOR GENERAL CONSTRUCTION TAKING PLACE ON THE 20TH CONSTRUCTION FLOOR AND PENTHOUSE (21ST AND 22ND MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC🔒 Adres ve yükleniciler
2026-10-06Bronx · Wakefield-WoodlawnRenewal Permit Without Changes · General Construction1–5 milyon $EXTERIOR RENOVATION INCLUDING ROOF WATERPROOFING SYSTEM AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQUIRED TO BE FILED SEPARATELY.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 7TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-06Manhattan · Harlem (South)Renewal Permit with Changes · General Construction1–5 milyon $FACADE REPAIR AND ROOF REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-06Manhattan · West VillageInitial Permit · Mechanical Systems1–5 milyon $Modification of mechanical on 3rd and 4th floor as per plans. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-06Brooklyn · WilliamsburgInitial Permit · General Construction1–5 milyon $PROPOSED ENLARGEMENT AND CONVERSION TO ONE STORY COMMERCIAL BUILDING TO MULTI FAMILY MIXED-USE.🔒 Adres ve yükleniciler
2026-10-05Brooklyn · Crown Heights (South)Renewal Permit Without Changes · General Construction5–10 milyon $Masonry repairs and brick replacement, Roofing systems replacement , parapets replacement , bulkhead doors replacement .🔒 Adres ve yükleniciler
2026-10-05Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Interior fit up with new sales fixtures/finishes.🔒 Adres ve yükleniciler
2026-10-05Manhattan · East Harlem (South)Renewal Permit Without Changes · Structural1–5 milyon $Herewith filing structural modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-05Manhattan · Harlem (North)Renewal Permit Without Changes · General Construction5–10 milyon $Harlem Hospital, MLK Bldg exterior facade & roof level repairs as per the plans filed including: Removal, repairs/replacement of cracked masonry, stone cladding w/metal panel cladd🔒 Adres ve yükleniciler
2026-10-05Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $Wash. Houses 06, Ext Facade repairs: Repairs at exposed concrete slab/foundation wall, reconstruction of exterior wythe of cavity wall system, mortar joint repointing, masonry repa🔒 Adres ve yükleniciler
2026-10-05Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $Facade repairs on the north and east elevations as shown on the drawings filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-05Manhattan · Murray Hill-Kips BayInitial Permit · Mechanical Systems1–5 milyon $Modifications to the existing HVAC system on the 20th and 21st floors (TD Securities- Marketing Floors 21 + 22) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-05Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Fit out of three floors with new ductwork and air conditioning units. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-05Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Mechanical Systems1–5 milyon $Demolition of existing steam chiller, and associated piping and accessories throughout the level 12 MER. Steam chiller 2 and piping distribution shall be replaced with new water so🔒 Adres ve yükleniciler
2026-10-05Brooklyn · Crown Heights (North)Initial Permit · General Construction1–5 milyon $Proposed horizontal enlargement to an existing four (4) story + cellar community facility building.🔒 Adres ve yükleniciler
2026-10-05Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · Plumbing1–5 milyon $REMOVE AND INSTALL NEW PLUMBING FIXTURES AND PIPING IN CONJUNCTION WITH ALT-CO #M01127304-I1. WORK ON FLOORS UG, SC1, CEL, 01-06, ROF, OSP.🔒 Adres ve yükleniciler
2026-10-05Manhattan · West VillageInitial Permit · Structural1–5 milyon $Installation of concrete columns to support the demolition and reconstruction of new double height floors for a proposed hospitality space.🔒 Adres ve yükleniciler
2026-10-05Queens · JamaicaInitial Permit · General Construction10–50 milyon $PROPOSED ONE (1) NEW THIRTEEN (13) STORY MIX USED BUILDING WITH NINTY-NINE (99) DWELLING UNITS, COMMERCIAL AT THE CELLAR, GROUND, 3RD AND 4TH FLOOR LEVELS, AND PARKING AT THE GROU🔒 Adres ve yükleniciler
2026-10-02Brooklyn · Bedford-Stuyvesant (East)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $OT- REMOVE & INSTALL NEW PARTITIONS, DOORS, CEILING & FINISHES. INSTALL ELEVATOR. REPLACEEXISTING & INSTALL NEW ADA RAMP ON GRADE. ST- REMOVE PORTION OF EXIST. FLOOR SLABS & BEAMS 🔒 Adres ve yükleniciler
2026-10-02Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Removal and construction of interior partition, doors and ceiling as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-02Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Interior fit out of the 13th, 14th, and 16th Floors. No change to use, egress, or occupancy🔒 Adres ve yükleniciler
2026-10-02Queens · AuburndaleInitial Permit · General Construction1–5 milyon $work includes per the filed plans waterproofing in cellar including grout injection of foundation walls, crack and spall repairs, floor painting, limestone crack repair, lintel coa🔒 Adres ve yükleniciler
2026-10-02Queens · JamaicaRenewal Permit Without Changes · Structural1–5 milyon $Exterior masonry cleaning, repair of cast stone, replacement of sealant, brick & stone repointing. Removal of existing and installation of new roof system and associated components🔒 Adres ve yükleniciler
2026-10-02Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · Mechanical Systems1–5 milyon $COMMERCIAL TENANT IMPROVEMENT (PAYPAL) ON SINGLE TENANT CONSTRUCTION FLOORS 6 THRU 8 (MARKETING FLOORS 7 THRU 9) MECHANICAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-02Staten Island · Great Kills-EltingvilleRenewal Permit Without Changes · General Construction5–10 milyon $Structural rehabilitation of the Existing Richmond Ave Pumping Station Pump Building.🔒 Adres ve yükleniciler
2026-10-02Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 23RD & 24TH FLOORS INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AS INDICA🔒 Adres ve yükleniciler
2026-10-02Bronx · Concourse-Concourse VillageInitial Permit · Structural1–5 milyon $Non mechanical removal of existing brick at all facades at 001-014 floors, in conjunction with Alt 1 filing X01097644.No change to use egress of occupancy🔒 Adres ve yükleniciler
2026-10-02Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · General Construction5–10 milyon $COMMERCIAL TENANT IMPROVEMENT (PAYPAL) ON SINGLE TENANT CONSTRUCTION FLOORS 6 THRU 8 (MARKETING FLOORS 7 THRU 9) INCLUDING CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, CEILINGS, FINI🔒 Adres ve yükleniciler
2026-10-02Queens · Oakland Gardens-Hollis HillsRenewal Permit Without Changes · Plumbing1–5 milyon $213Q - FILING HEREWITH FOR THE PLUMBING WORK RELATED TO THE FLOOD ELIMINATION UPGRADE FOR THIS SCHOOL. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. SPRINKLERPIPING TO BE RE🔒 Adres ve yükleniciler
2026-10-02Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $Interior fit out of the 15th Floor. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-01Queens · JamaicaRenewal Permit Without Changes · General Construction1–5 milyon $Interior and exterior renovations🔒 Adres ve yükleniciler
2026-10-01Queens · BaysideRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-01Staten Island · New Springville-Willowbrook-Bulls Head-TravisRenewal Permit Without Changes · Plumbing1–5 milyon $INSTALLATION OF NEW AREA DRAIN AND REPAIR OF BROKEN STORM PIPE🔒 Adres ve yükleniciler
2026-10-01Staten Island · Tompkinsville-Stapleton-Clifton-Fox HillsInitial Permit · General Construction1–5 milyon $FILING HEREWITH INTERIOR AND EXTERIOR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-01Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-01Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $NYU - Infrastructure MER - MER ADDITION ACCORDING TO PLANS FILED HEREWITH. MINOR CHANGE TO CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-10-01Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $OFFICE RENOVATION WORK TO INCLUDE PARTITIONS, DOOR, CEILLING,MILLWORK, FINISHES MODICATIONS TO FLOORS 1, MEZ, 2, 3 & 4 AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-10-01Manhattan · Murray Hill-Kips BayRenewal Permit with Changes · Structural1–5 milyon $TOWER EMERGENCY STRUCTURAL SHORING AND EXTERIOR LOCAL LAW 11 FACADE REPAIRS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-01Queens · BaysideRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-01Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Filing herewith interior renovations of existing 21st floor space. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-10-01Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $SCOPE INCLUDES SELECTIVE DEMOLITION AND INTERIOR ALTERATION OF THE 10THFLOOR AS NOTED ON PLAN.🔒 Adres ve yükleniciler
2026-10-01Manhattan · Upper West Side-Lincoln SquareInitial Permit · Mechanical Systems1–5 milyon $Filing for interior Mechanical modifications in retail space, including relocations of existing ductwork for new elevator shafts, HVAC to new electrical service rooms, install indo🔒 Adres ve yükleniciler
2026-10-01Brooklyn · Bedford-Stuyvesant (East)Renewal Permit with Changes · Standpipe1–5 milyon $IMC ED: PLUMBING, SPRINKLER AND STANDPIPE MODIFICATIONS TO ACCOMMODATE ALTERATIONS TO THE EXISTING EMERGENCY DEPARTMENT WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS🔒 Adres ve yükleniciler
2026-10-01Manhattan · Harlem (North)Renewal Permit Without Changes · General Construction1–5 milyon $WORK ON THE ROOF AND EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-10-01Queens · BaysideRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-01Brooklyn · WilliamsburgRenewal Permit Without Changes · Sprinklers10–50 milyon $SPRINKLER AND STANDPIPE IN CONJUNCTION WITH NB 320917503🔒 Adres ve yükleniciler
2026-10-01Brooklyn · Mapleton-Midwood (West)Renewal Permit Without Changes · General Construction1–5 milyon $APPLICATION FILED TO PROPOSE NEW COMMUNITY FACILITY/HOUSE OF WORSHIP.🔒 Adres ve yükleniciler
2026-10-01Manhattan · West VillageRenewal Permit Without Changes · General Construction1–5 milyon $Interior cellar renovations of lounge, room, showers and toilets and locker rooms, first floor office and single used toilet room🔒 Adres ve yükleniciler
2026-10-01Bronx · Soundview-Clason PointInitial Permit · Structural1–5 milyon $Partial replacement of the second floor structure between grid lines 1 and 6.🔒 Adres ve yükleniciler
2026-10-01Queens · BaysideRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-10-01Brooklyn · Sunset Park (West)Initial Permit · Mechanical Systems1–5 milyon $HEREWITH FILING FOR MECHANICAL MODIFICATION FOR TENANT FITOUT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-30Bronx · MelroseRenewal Permit Without Changes · General Construction1–5 milyon $SELECTIVE DEMOLITION OF EXISTING SITE RETAINING WALL AND CONSTRUCTION OF NEW CONCRETE SITE RETAINING WALL.🔒 Adres ve yükleniciler
2026-09-30Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandInitial Permit · Mechanical Systems1–5 milyon $Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-30Manhattan · East Harlem (North)Initial Permit · General Construction1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-30Manhattan · West VillageRenewal Permit Without Changes · General Construction1–5 milyon $General construction alterations on the 1st thru 5th floors and cellar level for proposed elevator modernization and change of use/occupancy; related work as per plans.🔒 Adres ve yükleniciler
2026-09-30Manhattan · Murray Hill-Kips BayInitial Permit · General Construction5–10 milyon $Installation of new partitions, doors, ceilings and finishes on the 20th and 21st floors (TD Securities- 21st and 22nd Marketing Floors) as per plans. No change to use, egress or o🔒 Adres ve yükleniciler
2026-09-30Manhattan · East Harlem (South)Initial Permit · Structural1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-30Bronx · Claremont Village-Claremont (East)Renewal Permit Without Changes · Structural10–50 milyon $Q148Q: Roof Replacement, Bulkhead Roofs, Parapets, Canopy, Roof Curbs. Remove, repair, replace, point Brick Work including Masonry Repairs. Replace Doors on 2nd flr and Bulkhead ro🔒 Adres ve yükleniciler
2026-09-30Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham 🔒 Adres ve yükleniciler
2026-09-30Manhattan · East VillageInitial Permit · General Construction1–5 milyon $EXTERIOR REPAIR AND RESTORATION. NO CHANGE TO USE EGRESS NOR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-30Staten Island · Arden Heights-RossvilleRenewal Permit Without Changes · Plumbing1–5 milyon $SITE DRAINAGE & PLUMBING: REDIRECT SITE STORMWATER TO PROPOSED NEW DRYWELLS ON SITE; REMOVE AND REPLACE EXISTING STORM STRUCTURES AND PIPING.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Lobby renovation as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Financial District-Battery Park CityInitial Permit · General Construction5–10 milyon $General construction filed for removal and replacement of existing window glazing and sash within existing window openings on floors 44-53, as shown on plans herewith. No change in🔒 Adres ve yükleniciler
2026-09-29Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Filed herewith rear facade replacement. No change of use, occupancy or egress under this application🔒 Adres ve yükleniciler
2026-09-29Queens · Fresh Meadows-UtopiaRenewal Permit Without Changes · Plumbing1–5 milyon $J.S. 216-Q: PROPOSED PLUMBING WORK-NEW 4-STORY SCHOOL BUILDING.🔒 Adres ve yükleniciler
2026-09-29Manhattan · East Harlem (South)Initial Permit · Structural1–5 milyon $SITE YARD WORK WITH 8' HIGH ENCLOSING FENCE AND GATES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Harlem (North)Initial Permit · Structural1–5 milyon $Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Bronx · University Heights (South)-Morris HeightsInitial Permit · General Construction1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-29Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction5–10 milyon $WMC INTERIOR 4th Floor: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCC🔒 Adres ve yükleniciler
2026-09-29Bronx · Castle Hill-UnionportInitial Permit · General Construction1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-29Queens · BaysideInitial Permit · Mechanical Systems1–5 milyon $Proposed installation of a new steam generator, a large heat exchanger supplied by the campus high-temperature hot water system. This unit is not a fuel-fired boiler. All as per pl🔒 Adres ve yükleniciler
2026-09-29Queens · CoronaRenewal Permit Without Changes · Support of Excavation1–5 milyon $Filing for support of excavation in conjunction with Q0067300-I1 and 440554302 as per plans filed herewith🔒 Adres ve yükleniciler
2026-09-29Bronx · Mott Haven-Port MorrisInitial Permit · Structural1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-29Manhattan · InwoodInitial Permit · Structural1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-29Bronx · MelroseInitial Permit · Structural1–5 milyon $Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Manhattan · West VillageRenewal Permit Without Changes · General Construction1–5 milyon $Renovation of commercial building, No change in use egress or occupancy🔒 Adres ve yükleniciler
2026-09-29Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR RENOVATION AT CELLAR, 1ST TO 5TH FLOORS & ROOF. HORIZONTAL ENLARGEMENT OF SECOND FLOOR. INSTALLATION OF NON-LOAD BEARING INTERIOR PARTITIONS & CEILINGS, REPLACEMENT OF STA🔒 Adres ve yükleniciler
2026-09-29Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $WCM INTERIOR 4: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Minor demolition with installation of new partitions, doors, ceilings and finishes on the 6th floor as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of air conditioning system, condensate pump, condenser water pumps, terminal boxes, air outlets and related ductwork/piping as per plans filed herewith. No change in u🔒 Adres ve yükleniciler
2026-09-29Queens · Springfield Gardens (North)-Rochdale VillageRenewal Permit Without Changes · General Construction1–5 milyon $Q400 - Existing School Building - Room #164 Convert Existing Auto Shop to New Aeronautics Lab and Classroom🔒 Adres ve yükleniciler
2026-09-29Brooklyn · Crown Heights (North)Renewal Permit Without Changes · Plumbing1–5 milyon $Application filed for plumbing work in conjuntion with B01021153-I1.🔒 Adres ve yükleniciler
2026-09-29Bronx · Mott Haven-Port MorrisInitial Permit · General Construction1–5 milyon $To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8🔒 Adres ve yükleniciler
2026-09-29Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith. No change to use egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Bronx · MorrisaniaInitial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Bronx · Riverdale-Spuyten DuyvilInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATION OF AN EXISTING ONE- FAMILY RESIDENCE. NEW INTERIOR PARTITIONS AND FINISHES. NEW WINDOWS AND DOORS IN EXISTING OPENINGS. MODIFICATION TO EXISTING CERTIFICATE OF 🔒 Adres ve yükleniciler
2026-09-29Bronx · Castle Hill-UnionportInitial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 36th & 40th floors (Ares- Buildout Phase) as per plans. No change to use, egress🔒 Adres ve yükleniciler
2026-09-29Brooklyn · BrownsvilleInitial Permit · Structural1–5 milyon $Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $APPLICATION FILED FOR LOCAL LAW FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-29Brooklyn · Crown Heights (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $(AHU) AIR HANDLING UNIT REPLACEMENT AND REPLACEMENT OF ROOFTOP EXHAUST FANS. INSTALLATION OF NEW CONDENSING UNIT ON THE ROOF.🔒 Adres ve yükleniciler
2026-09-29Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $HUB ACCEPTED- Exterior Installation of temporary structure for 90 days, Temp Structure to be removed after duration for LOC issuance no change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-29Brooklyn · Sunset Park (West)Initial Permit · General Construction1–5 milyon $Alt. CO filed to Convert Existing Coffee Roasting Facility to Artists Studio; Provide New Roof, New Skylights, and new Interior Partitions.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Tribeca-Civic CenterInitial Permit · Mechanical Systems1–5 milyon $Modifications to HVAC system in BNY Lobby Level (1st Floor Entry) and atrium, including alteration to ducts and piping, and the addition of new units, as per plans. No change to us🔒 Adres ve yükleniciler
2026-09-28Queens · Astoria (North)-Ditmars-SteinwayInitial Permit · General Construction1–5 milyon $INSTALLATION OF NEW CONCRETE FOUNDATIONS FOR ELECTRICAL EQUIPMENT AND PRIVATE ASPHALT DRIVEWAY AT CON EDISON'S ASTORIA WEST SUBSTATION.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Midtown-Times SquareInitial Permit · Structural1–5 milyon $Facade repairs as per plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-28Bronx · Morris ParkRenewal Permit Without Changes · General Construction1–5 milyon $MONTEFIORE - LABOR AND DELIVERY COSMETIC REFRESH - GENERAL CONSTRUCTION INCLUDING DEMO TO EXISTING FLOOR FINISHES, CEILING, DOORS AND PARTITIONS AND NEW DOORS, FLOORS, CEILINGS. AN🔒 Adres ve yükleniciler
2026-09-28Brooklyn · GreenpointRenewal Permit Without Changes · General Construction1–5 milyon $HEREWITH FILING FITOUT TO NB(B00772431-I1) ARCHITECTURAL WORK AS PER PLANS. NO CHANG TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Upper West Side-Lincoln SquareRenewal Permit Without Changes · General Construction1–5 milyon $Interior renovation proposed for an existing penthouse. PAA filed for omission of Fire-Resistant Penetration and Joints as a special inspection No change to use, occupancy or egres🔒 Adres ve yükleniciler
2026-09-28Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $Architectural modifications for plaza renovation as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-28Brooklyn · South WilliamsburgInitial Permit · Structural1–5 milyon $Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-28Queens · East FlushingRenewal Permit Without Changes · General Construction1–5 milyon $Facade repairs as per plans; no change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-28Brooklyn · East New York-New LotsRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work on the facade, 1st, 2nd and roof as indicated on drawings.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Harlem (North)Initial Permit · Mechanical Systems1–5 milyon $Mechanical work filed in conjunction with GC application. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-28Queens · John F. Kennedy International AirportRenewal Permit Without Changes · Mechanical Systems10–50 milyon $FILING HEREWITH CONTRACT JA-179: INSTALLATION OF MECHANICAL AND ELECTRICAL EQUIPMENT, INCLUDING BLACK START GENERATOR (1), STANDBY GENERATORS (2), SYNCHRONIZING SWITCHGEAR, AND STA🔒 Adres ve yükleniciler
2026-09-28Manhattan · West VillageRenewal Permit with Changes · General Construction1–5 milyon $INTERIOR/EXTERIOR WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-28Manhattan · East VillageInitial Permit · General Construction1–5 milyon $Filing for IPNA repairs as per plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction1–5 milyon $Interior build-out of existing apt #PH-36W, as per plans filed herewith. Work to include minor non-structural demolition, general construction and related finishes. No change in us🔒 Adres ve yükleniciler
2026-09-28Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $GENERAL CONSTRUCTION TAKING PLACE ON CEL,1ST & 14TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction1–5 milyon $Interior renovation of an existing duplex. No change to use, occupancy or egress.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Mechanical work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-28Staten Island · Great Kills-EltingvilleRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Provide intermittent ventilation of Pump Building Screen Room, Fan Room, Mechanical Room No.1; Electric heaters for Electrical Room, Generator Room, Future Generator Room, ATS Room🔒 Adres ve yükleniciler
2026-09-28Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems10–50 milyon $Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Modifications to existing HVAC system and piping including installation of new AC units for new office tenant. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $Demolition of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Modification to existing ductwork and installation of AC units as per plans filed herewith. 15,16,17,18 Construction vs 17,18,19 & 20 Marketing🔒 Adres ve yükleniciler
2026-09-28Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit Without Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS BEEN FILLED HEREWITH.🔒 Adres ve yükleniciler
2026-09-28Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction10–50 milyon $Interior office fit out of 15th through 18th floors including open office, private offices, restroomrenovation, new unisex powder rooms, wellness rooms, conference rooms, non cooki🔒 Adres ve yükleniciler
2026-09-28Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $HEREWITH TO PROPOSE INTERIOR RENOVATION OF 3RD. FLOOR OF EXISTING OFFICE BUILDING. NO CHANGES IN OCCUPANCY, USE GROUP OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-09-28Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachInitial Permit · Mechanical Systems1–5 milyon $Install new AHU-1 w/ DC-1 and AHU-2; modify ductwork & hot/chilled-water piping; add exhaust fans, diffusers/grilles, dampers, controls & duct smoke detector; UV disinfection; seal🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL WORK ON THE SUBCELLAR2, SUBCELLAR1, CELLAR AND 1ST FLOOR, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Tribeca-Civic CenterInitial Permit · General Construction1–5 milyon $Minor Interior demolition and white box of existing office space, including removal of ceilings, doors, floors, and partitions on the 3rd & 4th Floors (BNY), as per plans. No chang🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $Respectfully filing herewith for GC work as per plans. No change to use, egress or occupancy on this application.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Construction work on the 10th floor (Dubin & Co.) as indicated on drawings.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction10–50 milyon $GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $MECHANICAL MODIFICATIONS TAKING PLACE ON 25TH FL CONSTRUCTION (26TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Manhattan · GramercyRenewal Permit Without Changes · General Construction1–5 milyon $HEREWITH FILING FOR PARTIAL INTERIOR RENO AT GD FL,REMOVAL/INSTALL OF NON-LOAD BEARING PARTITIONS, FIX+ FINISHES FOR EX BOOKSTORE TB CONVERTED TO WELCOME CENTER/ONE-STOP SHOP FOR S🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $9th Cycle Facade Repair Program. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Installation of new interior finishes, lighting, glass guardrail at perimeter curtain wall.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Harlem (North)Initial Permit · Mechanical Systems1–5 milyon $Mechanical work filed in conjunction with GC application. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Harlem (South)Initial Permit · General Construction1–5 milyon $PARTIAL REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND NEW FINISHES AS PER PLANS ON THE MAIN HOSPITAL FLOOR 6 OF WING 'A'. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS 🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $Removal and installation of non load bearing partitions as per plans filed herewith.🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-25Brooklyn · Prospect Lefferts Gardens-WingateRenewal Permit Without Changes · Mechanical Systems1–5 milyon $KINGS COUNTY HOSPITAL CENTER - ED EXPANSION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-25Bronx · Bedford ParkRenewal Permit Without Changes · General Construction1–5 milyon $Application filed for Interior renovation of public toilets and adjoining spaces, including removal and installation of nonbearing partitions, fixtures and finishes. no change is p🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of a new HVAC system on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · SoHo-Little Italy-Hudson SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical modifications taking place on the 6-7th floors as indicated on the drawings.🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $alterations to existing mechanical systems as per plans filed herewith🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $AT 28TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $Interior renovation of an existing commercial office floor. 30TH CONSTRUCTION FLOOR (32ND MARKETING FLOOR). no change in use, occupancy, egress or occupancy. Proskauer build out p🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Interior renovation of the 12 through 14 floors totaling approx. 27,008 square feet as per plans.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $Architectural modifications taking place on the 1st floor (lobby) as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Modification to existing HVAC systems as per plans filed herewith.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $General construction for Jenner & Block space on 28th marketing floor (27th construction)🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Mechanical, taking place on the Mezz, 2nd, 3rd floor as per plans filed herewith. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-25Manhattan · SoHo-Little Italy-Hudson SquareRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR BUILD OUT OF OFFICE SPACE AS PER PLANS.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Modifications to the existing HVAC system on the 17th Floor (Industrious), as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Interior renovation of existing office space with the installation of ceilings, floors, partitions, and finishes on the 17th Floor (Industrious), as per plans. No change to use, eg🔒 Adres ve yükleniciler
2026-09-25Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $General construction modifications taking place on the 32nd floor as per plans filed herewith. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Brooklyn · Clinton HillRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR AND EXTERIOR CHURCH RENOVATION INCLUDING ROOF, WINDOWS WORK, AND NEW ELEVATOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-25Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction10–50 milyon $Interior renovations as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Harlem (South)Renewal Permit Without Changes · General Construction50 milyon $ üzeriPROPOSED 21-STORY MIXED-USE BUILDING W/ 180 D.U. & COMMERCIAL STORE AT GROUND FLOOR LEVEL🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Modify mechanical ductwork and related piping. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $Installation of new partitions, doors, ceilings and finishes on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Bronx · NorwoodRenewal Permit Without Changes · General Construction1–5 milyon $Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.🔒 Adres ve yükleniciler
2026-09-24Bronx · Mount HopeInitial Permit · General Construction1–5 milyon $Removal of all concrete and/or asphalt paving within the play areas, regrading of play areas, installation of playground equipment, site furnishings, safety mats, enclosed storage 🔒 Adres ve yükleniciler
2026-09-24Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit Without Changes · General Construction1–5 milyon $NYCHA/Gowanus/B1-Interior reno. incl. repl. of kitchen & bath fixtures, finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504 fo🔒 Adres ve yükleniciler
2026-09-24Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachInitial Permit · Mechanical Systems1–5 milyon $Replacement of existing mechanical equipment (boilers, vacuum pumps, exhaust fans, valves) as shown on plans. No change to use and egress.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Upper West Side-Lincoln SquareRenewal Permit Without Changes · General Construction1–5 milyon $Hereby filing related architectural construction on basement, 1st and roof levels in support of replacement of rooftop emergency generator and associated equipment. No change to u🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-24Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit Without Changes · General Construction1–5 milyon $NYCHA/Gowanus/Bldg4W- Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504 for 🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Mechanical work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Hell's KitchenInitial Permit · General Construction1–5 milyon $Interior reno of 42 units consisting of existing 1 bedroom apt units 2 bedroom apt units and studio apt units to meet or exceed UFAS compliance as indicated on drawings. Minor reco🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Structural1–5 milyon $Structural work as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $WCM 2 & 3: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-24Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit Without Changes · General Construction1–5 milyon $NYCHA/Gowanus/Bldg#6- (195 Hoyt Street/413 Baltic Street). Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibilit🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Structural1–5 milyon $STRUCTURAL WORK FROM THE 13TH THRU THE 14TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th f🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 41st & 42nd floors (Ares- Buildout) as per plans. No change to use, egress🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-24Queens · Far Rockaway-BayswaterRenewal Permit Without Changes · Earth Work5–10 milyon $Architectural/ structural park improvements as per plans. Work includes Flagpole, Boardwalk, sloped walkway, boulder wall. Flood lights, play ground, kayak station. Filed in Conjun🔒 Adres ve yükleniciler
2026-09-24Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of a new HVAC system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · Structural1–5 milyon $Structural work as shown on plans🔒 Adres ve yükleniciler
2026-09-24Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · Earth Work1–5 milyon $REMOVE EXISTING ASPHALT PAVEMENT, LANDSCAPING, AND PARTIAL REMOVAL OF SITE WALL. REMOVE AND REPLACE EXISTING STORM INLETS. RESTORE ASPHALT PAVEMENT IN DISTURBED AREAS. Excavate to🔒 Adres ve yükleniciler
2026-09-24Queens · Far Rockaway-BayswaterInitial Permit · General Construction5–10 milyon $Complete Renovation of Natatorium including Pool & Spectator Area. Complete Renovation of Locker Rooms, Shower/Dressing Rooms, and Toilet Areas. Installation of new Pool Filtration🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL MODIFICATIONS TO 13TH THRU 15TH FLOOR AND 18TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-24Bronx · Pelham GardensInitial Permit · General Construction1–5 milyon $Remove and replace existing BUR roof and provide New Cold-Applied SBS- Modified Roofing System and Insulation.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareInitial Permit · Structural1–5 milyon $Structural modifications: install new structural steel framing and removal of slab on the 23 (CO)/ 24 (Mktg) Floor as per plans (Latham & Watkins.) No change to use, egress or occu🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareRenewal Permit with Changes · Mechanical Systems5–10 milyon $MECHANICAL WORK IN CONJUNCTION WITH OFFICE RENOVATION FOR TENANT (BAIN & COMPANY) AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-24Queens · Fresh Meadows-UtopiaRenewal Permit Without Changes · Mechanical Systems1–5 milyon $PROVIDE A/C SPLIT COOLING SYSTEM & MINI CONDENSATE PUMP.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Tribeca-Civic CenterRenewal Permit with Changes · General Construction1–5 milyon $JOB ACCEPTED TO CDU ON 5/7/25. FILING FOR CHANGE OF OCCUPANCY FROM J-3 RECTORY TO J-1 (R-1) ROOMING UNITS AS PERMITTED BY HMC 27-2077. INTERIOR RENOVATIONS ON FLOORS SUB, CEL, MEZ,🔒 Adres ve yükleniciler
2026-09-24Manhattan · Morningside HeightsInitial Permit · Mechanical Systems10–50 milyon $Modifications to mechanical systems as per plans filed herewith. No change to use, occupancy or egress.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Washington Heights (South)Renewal Permit Without Changes · Sprinklers1–5 milyon $VC SP: SPRINKLER MODIFICATIONS WITHIN THE EXISTING VANDERBILT CLINIC AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction10–50 milyon $General construction as shown on plans filed herewith. No change in use, egress, and occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction10–50 milyon $General construction as shown on plans filed herewith. No change in use, egress, and occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · West VillageInitial Permit · Mechanical Systems1–5 milyon $Mechanical modification of floors 3 thru 5 for Guestrooms as per plans No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Remove and replace exterior soffit at drum floors with new metal panel system, also, floors are the mechanical windbreak floors open to outside.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Modifications to the existing HVAC System: Install new ductwork, diffusers, and FCU and associated piping on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham & Watkins.)🔒 Adres ve yükleniciler
2026-09-24Brooklyn · Sunset Park (West)Renewal Permit Without Changes · Sidewalk Shed1–5 milyon $INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $Removal and replacement of pavers at 3rd floor plaza and exterior stairs leading up at 1st-3rd.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction5–10 milyon $Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-24Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Interior renovation as per plans filed herewith.🔒 Adres ve yükleniciler
2026-09-23Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $HVAC modifications for rooftop amenity as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Staten Island · Annadale-Huguenot-Prince's Bay-WoodrowRenewal Permit Without Changes · General Construction1–5 milyon $Filing for roof replacment & concrete patching as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $Interior alterations to the 10th and 11th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.🔒 Adres ve yükleniciler
2026-09-23Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction1–5 milyon $GENERAL CONSTRUCTION WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILINGS FLOORS 1-10 AS SHOWN ON PLANS, EXTERIOR WORK RELATED TO NEW FIRE E🔒 Adres ve yükleniciler
2026-09-23Staten Island · Grasmere-Arrochar-South Beach-Dongan HillsInitial Permit · General Construction5–10 milyon $Filing for interior partitions (non-load bearing) & renovations No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $INTERIOR MECHANICAL WORK TAKING PLACE ON THE 20TH CONSTRUCTION FLOOR AND PENTHOUSE (21ST AND 22ND MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-23Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-09-23Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-23Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction1–5 milyon $General construction on floors MZ2, 5 and 7 as per plans filed herewith. No changes in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Manhattan · East VillageInitial Permit · Plumbing1–5 milyon $Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress.🔒 Adres ve yükleniciler
2026-09-23Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-09-23Manhattan · East Harlem (South)Renewal Permit with Changes · General Construction1–5 milyon $THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-23Queens · MaspethInitial Permit · General Construction1–5 milyon $IT IS PROPOSED TO ENLARGE EXISTING BUILDING (HORIZONTAL) BY 20,600 OF EXISTING STORAGE FACILITY.🔒 Adres ve yükleniciler
2026-09-23Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-09-23Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction5–10 milyon $Facade overclad as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Brooklyn · Coney Island-Sea GateRenewal Permit Without Changes · General Construction1–5 milyon $FILING HEREWITH GENERAL CONSTRUCTION WORK ASSOCIATED WITH INSTALLATION OF BATTING CAGE STRUCTURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-09-23Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $INSTALLATION OF TWO NEW COGEN ENGINES.🔒 Adres ve yükleniciler
2026-09-23Staten Island · Westerleigh-Castleton CornersRenewal Permit Without Changes · General Construction1–5 milyon $HEREWITH FILING FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE TO USE, OCCUPANY, OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-09-23Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-09-23Manhattan · Lower East SideInitial Permit · General Construction1–5 milyon $Filing herewith interior renovation, removal, and installation of non-load-bearing partitions, doors, ceilings, and floors as per plans.🔒 Adres ve yükleniciler
2026-09-23Brooklyn · Fort GreeneRenewal Permit Without Changes · General Construction1–5 milyon $Renovation of the BPL Walt Witman Library, architectural plans filed herewith. removal and relocation of elevator tower and egress stair🔒 Adres ve yükleniciler
2026-09-23Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Structural1–5 milyon $Structural modifications for plaza renovation as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Structural1–5 milyon $Structural modifications (Rooftop Amenity) as per plans. No change to use ,egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Queens · Rego ParkRenewal Permit Without Changes · Mechanical Systems10–50 milyon $Mechanical systems and work related to New Building Application Q00713415-I1🔒 Adres ve yükleniciler
2026-09-23Queens · Murray Hill-Broadway FlushingRenewal Permit Without Changes · General Construction10–50 milyon $Q189_Remove and replace parapets, roofs, and exterior masonry. Provide flood elimination.🔒 Adres ve yükleniciler
2026-09-23Brooklyn · East WilliamsburgInitial Permit · General Construction1–5 milyon $HEREBY FILING TO ENLARGE AN EXISTING 2 STORY COMMERCIAL BUILDING INTO A 6 STORY, MIXED USE BUILDING WITH 8 DWELLING UNITS & 1 COMMERCIAL UNIT🔒 Adres ve yükleniciler
2026-09-23Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical modifications on floors MZ2, 5 and 7 as per plans filed herewith. No changes in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-23Queens · College PointRenewal Permit Without Changes · Plumbing1–5 milyon $Plumbing for interior renovation🔒 Adres ve yükleniciler
2026-09-23Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · Plumbing5–10 milyon $NYU - Infrastructure Package - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-23Bronx · Soundview-Clason PointRenewal Permit Without Changes · Construction Fence10–50 milyon $Installation of a temporarily heavy-duty sidewalk shed and construction fence with netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in u🔒 Adres ve yükleniciler
2026-09-23Queens · Fresh Meadows-UtopiaInitial Permit · Structural1–5 milyon $Related ST/FO work🔒 Adres ve yükleniciler
2026-09-22Queens · John F. Kennedy International AirportRenewal Permit Without Changes · Structural1–5 milyon $FILING HEREWITH CONTRACT JA-179: JAMAICA WRRF STRUCTURAL ACTIVITIES AS PER SUBMITTED PLANS.🔒 Adres ve yükleniciler
2026-09-22Manhattan · East VillageInitial Permit · Mechanical Systems1–5 milyon $REPLACEMENT OF EXISTING STEAM CONTROL VALVES, STEAM RADIATOR SHUT-OFF VALVES, HEATING AND VENTILATION UNIT AND STEAM TRAPS🔒 Adres ve yükleniciler
2026-09-22Staten Island · Grasmere-Arrochar-South Beach-Dongan HillsRenewal Permit Without Changes · General Construction1–5 milyon $HEREWITH FILING FOR 2ND FLR INTERIOR RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-09-22Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · Construction Fence1–5 milyon $CONSTRUCTION FENCE TO SUPPORT INSTALLATION OF COGEN ENGINES.🔒 Adres ve yükleniciler
2026-09-22Manhattan · Washington Heights (South)Initial Permit · General Construction1–5 milyon $HP4: Modifications to interior partitions and finishes to accommodate alterations for the HP Blood Bank within the existing hospital building as per plans.🔒 Adres ve yükleniciler
2026-09-22Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. IN-KIND REPLACEMENT OF TREADS AT EXISTING CONVENIENCE STAIRS. NO CH🔒 Adres ve yükleniciler
2026-09-22Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · Structural1–5 milyon $Constructing CHP platform at Bellevue Hospital.🔒 Adres ve yükleniciler
2026-09-22Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Removal and installation of interior non bearing partitions. Scope of Work includes Partial Demolition, New MEP and Structure. No change in use, egress or occupancy under this appl🔒 Adres ve yükleniciler
2026-09-22Queens · Bay Terrace-ClearviewInitial Permit · Mechanical Systems1–5 milyon $MODIFICATIONS TO EXISTING MECHANICAL SYSTEM RELATED TO PROPOSED WORKOUT FACILITY.🔒 Adres ve yükleniciler
2026-09-22Manhattan · East Harlem (North)Renewal Permit with Changes · General Construction1–5 milyon $Application filed for window replacements at all floors 6-35, as per drawings filed herewith.🔒 Adres ve yükleniciler
2026-09-22Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND FINISHES AS PER PLANS ON THE MAIN HOSPITAL 3RD FLR WING 'A' PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC🔒 Adres ve yükleniciler
2026-09-22Bronx · Morris ParkInitial Permit · Mechanical Systems1–5 milyon $INSTALLATION OF A VENTILATION SYSTEM TO CREATE A CLEANROOM ON THE 12TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-22Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · Structural1–5 milyon $CONCRETE REPAIR OF BALCONY CURBS AND SLABS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-22Manhattan · East VillageInitial Permit · Plumbing1–5 milyon $Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress.🔒 Adres ve yükleniciler
2026-09-22Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-22Bronx · Mount Eden-Claremont (West)Initial Permit · General Construction1–5 milyon $Full program accessibility involves a new passenger elevator addition serving all floors - cellar-4 fl and EMR room. Provide new fire rescue area rooms, accessible toilets, modify 🔒 Adres ve yükleniciler
2026-09-22Manhattan · Upper East Side-Carnegie HillInitial Permit · Full Demolition1–5 milyon $full demolition of two story structure using hand held with mechanical to assist🔒 Adres ve yükleniciler
2026-09-22Manhattan · Upper East Side-Carnegie HillInitial Permit · Full Demolition1–5 milyon $full demolition of four story structure using hand held with mechanical to assist on grade.🔒 Adres ve yükleniciler
2026-09-22Manhattan · East Harlem (North)Initial Permit · Plumbing1–5 milyon $REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-22Brooklyn · Marine Park-Mill Basin-Bergen BeachRenewal Permit Without Changes · General Construction1–5 milyon $Program Accessibility: building alterations related to accessibility upgrades: provide new elevator, ramps, toilets, partitions, finishes and other work as per drawings. No change 🔒 Adres ve yükleniciler
2026-09-22Manhattan · East Midtown-Turtle BayRenewal Permit with Changes · Mechanical Systems1–5 milyon $Filing herewith to replace existing HVAC equipment in the central cooling plant.🔒 Adres ve yükleniciler
2026-09-22Brooklyn · Brighton BeachInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS AT THE ROOF, NORTH, SOUTH, EAST, AND WEST, INCLUDING BALCONY STRUCTURAL REPAIRS AND PARAPET WALL REPLACEMENT AS PER PLANS FILED HE🔒 Adres ve yükleniciler
2026-09-22Bronx · Soundview-Bruckner-Bronx RiverRenewal Permit Without Changes · General Construction1–5 milyon $Architectural filing for swimming pool renovation. Provide a new tile finished concrete ramp to correct the existing non-compliant threshold at Girl's ADA Toilet🔒 Adres ve yükleniciler
2026-09-22Manhattan · Upper West Side-Manhattan ValleyRenewal Permit Without Changes · General Construction1–5 milyon $Facade and cornice repair/reconstruction to include balusters, pointing, limestone, and terracotta patching, caulking🔒 Adres ve yükleniciler
2026-09-22Bronx · NorwoodInitial Permit · General Construction1–5 milyon $Interior removals of partitions, ceilings and finishes🔒 Adres ve yükleniciler
2026-09-22Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $INTERIOR GENERAL CONSTRUCTION TAKING PLACE ON THE 20TH CONSTRUCTION FLOOR AND PENTHOUSE (21ST AND 22ND MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC🔒 Adres ve yükleniciler
2026-09-22Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit with Changes · Support of Excavation5–10 milyon $SOE WORK AS SHOWN ON PLANS.🔒 Adres ve yükleniciler
2026-09-22Brooklyn · WilliamsburgRenewal Permit Without Changes · General Construction1–5 milyon $ALT-CO - NB APPLICATION FILED FOR 4-STORY, THREE DWELLINGS WITH CELLAR.🔒 Adres ve yükleniciler
2026-09-22Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-22Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-22Queens · WoodsideRenewal Permit Without Changes · Plumbing1–5 milyon $Connect to existing building water connection with new dedicated meter for water distribution. Connect new sanitary to existing sanitary lines. Distribute hot water from cellar hot🔒 Adres ve yükleniciler
2026-09-21Manhattan · East Harlem (North)Renewal Permit Without Changes · Structural1–5 milyon $Application filed for GC/ST for emergency generator installation in open space, as per drawings filed herewith.🔒 Adres ve yükleniciler
2026-09-21Queens · JamaicaInitial Permit · General Construction5–10 milyon $The design aims to minimize interventions in the Plazas reconstruction and repair. Key upgrades and repairs include drainage, waterproofing, structural slabs, granite pavers, plant🔒 Adres ve yükleniciler
2026-09-21Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Plumbing5–10 milyon $Plumbing work associated with Alt-CO as shown on plans.🔒 Adres ve yükleniciler
2026-09-21Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Removal and replacement of glycol water supply and return lines for the heat exchange system, including installation of new heat pumps and associated backup pumps and piping NO CHA🔒 Adres ve yükleniciler
2026-09-21Staten Island · West New Brighton-Silver Lake-Grymes HillInitial Permit · General Construction1–5 milyon $SLB Bldg-ARCHITECTURAL WORK FOR PROPOSED ROOF REPLACEMENT FOR SLB BUILDING -- 3RD FLOOR AND 5TH FLOOR ROOF SETBACKS-- LOCATED AT RICHMOND UNIVERSITY MEDICAL CENTER. ALL AS PER PLA🔒 Adres ve yükleniciler
2026-09-21Manhattan · Upper East Side-Carnegie HillInitial Permit · Full Demolition1–5 milyon $full demolition of four story structure using hand held with mechanical to assist.🔒 Adres ve yükleniciler
2026-09-21Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $PROPOSED NEW RESTAURANT WITH PARTITION WORK AT CELLAR, 1ST FLOOR, MEZZANINE. INSTALL NEW HOODS AND EXHAUST SYSTEM IN COMMERCIAL KITCHEN. INSTALL NEW HVAC SYSTEM. NO CHANGE IN USE🔒 Adres ve yükleniciler
2026-09-21Staten Island · Freshkills Park (South)Initial Permit · General Construction1–5 milyon $New foundation and Structural work for service building.🔒 Adres ve yükleniciler
2026-09-21Manhattan · East VillageInitial Permit · Mechanical Systems1–5 milyon $Replacement and installation of new mechaical equipment as shown on plans.🔒 Adres ve yükleniciler
2026-09-21Staten Island · Oakwood-RichmondtownRenewal Permit Without Changes · Plumbing1–5 milyon $RPZ replacements, construction of a new water supply loop to improve water distribution through the facility. Connection of water loop to Dewatering Building.🔒 Adres ve yükleniciler
2026-09-21Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · General Construction10–50 milyon $Proposed 24 story residential and commercial building. Building #362 and #372 (on single zoning lot) filed under separate applications🔒 Adres ve yükleniciler
2026-09-21Bronx · Co-op CityRenewal Permit Without Changes · General Construction50 milyon $ üzeriConstruct new two (2) story community facility building as per plans filed.🔒 Adres ve yükleniciler
2026-09-21Queens · Rego ParkInitial Permit · Support of Excavation1–5 milyon $SOE FILING IN CONJUNCTION WITH NEW BUILDING🔒 Adres ve yükleniciler
2026-09-21Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Mechanical Systems1–5 milyon $Replacement of air handling units on the 15th and 16th floor as indicated on drawings.🔒 Adres ve yükleniciler
2026-09-21Manhattan · Upper West Side-Lincoln SquareInitial Permit · Plumbing1–5 milyon $Filing for exterior Plumbing infrastructure upgrades, including sanitary drainage lines and treated water supply to/from cooling tower. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-21Manhattan · East Harlem (North)Renewal Permit Without Changes · General Construction1–5 milyon $Application filed for window replacements at all floors 6-35, as per drawings filed herewith.🔒 Adres ve yükleniciler
2026-09-21Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $Interior Gut and renovation of the 4th floor. No changes to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-21Manhattan · East Harlem (North)Renewal Permit with Changes · General Construction1–5 milyon $Application filed for window replacements at all floors 6-35, as per drawings filed herewith.🔒 Adres ve yükleniciler
2026-09-21Queens · Long Island City-Hunters PointRenewal Permit Without Changes · Sprinklers5–10 milyon $New water, gas, sanitary, and lab systems with booster, heaters, pH skid; reroute piping. New wet, dry, pre-action sprinklers with alarm valve for basement, rooftop AHUs, generator🔒 Adres ve yükleniciler
2026-09-21Manhattan · Morningside HeightsRenewal Permit Without Changes · Sprinklers1–5 milyon $MSM SP N - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-21Brooklyn · Park SlopeRenewal Permit Without Changes · Sprinklers1–5 milyon $PLUMBING AND SPRINKLER MODIFICATIONS TO THE POST-NATAL UNIT ON THE 5TH FLOOR IN THE EXISTING CARRINGTON PAVILION HOSPITAL BUILDING. NO CHANGE, USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-21Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION TAKING PLACE ON FLOORS 1-4 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-21Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-18Queens · Richmond HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of HVAC including related ductwork on first, second and third floors in Building Segments 3, 6, 7, 10, 11, 12, 13, 16, 17 and 18 and related dunnage and FDNY access ac🔒 Adres ve yükleniciler
2026-09-18Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $Interior renovations has shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-18Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen BeachRenewal Permit with Changes · Mechanical Systems1–5 milyon $P.S. 206-K: MECHANICAL WORK TYPE🔒 Adres ve yükleniciler
2026-09-18Staten Island · West New Brighton-Silver Lake-Grymes HillRenewal Permit Without Changes · General Construction1–5 milyon $ALT-CO (MAJOR ALT) FILED FOR PROPOSED VERTICAL & HORIZONTAL EXTENSION TO EXISTING 3 STORY RESIDENCE. NEW ROO, ROOF TERRACE LEVEL. NO CHANGE IIN USE OR OCCUPANCY. INCREASE IN FLOOR 🔒 Adres ve yükleniciler
2026-09-18Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $Interior renovation as per plans filed herewith.🔒 Adres ve yükleniciler
2026-09-18Bronx · LongwoodInitial Permit · Mechanical Systems1–5 milyon $remove &replace existing exhaust fans on roof and provide new curbs, extensions as shown in the drawings. remove and replace split ac units in kind. No change in use, egress , or o🔒 Adres ve yükleniciler
2026-09-18Manhattan · Financial District-Battery Park CityInitial Permit · Plumbing1–5 milyon $Plumbing work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-18Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · General Construction5–10 milyon $HEREWITH FILING INTERIOR RENOVATIONS WITHIN AN EXISTING SCHOOL AS PER PLANS FILED HEREWITH NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED.🔒 Adres ve yükleniciler
2026-09-18Manhattan · Financial District-Battery Park CityInitial Permit · Plumbing1–5 milyon $Plumbing work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-18Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Modification/additions to existing HVAC system and related ductwork/piping. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-18Manhattan · Upper West Side (Central)Initial Permit · General Construction1–5 milyon $PROPOSED BUILD-OUT FOR NEW EATING AND DRINKINGESTABLISHMENT. NEW PARTITION WALLS, FIRESTOPPING,FLOOR AND CEILING FINISHES, FIRE PROOF DOORS,EMERGENCY AND EXIT LIGHTSNO CHANGE IN U🔒 Adres ve yükleniciler
2026-09-18Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $FACADE RENOVATION IS LIMITED TO FLOORS 1, 2, AND 3 ONLY, REMOVAL OF DIRECT APPLIED EXISTING STONE & CERAMIC TILE & SELECT AREAS OF CURTAIN WALL & A MARQUEE ON THE PARK AVENUE SOUT🔒 Adres ve yükleniciler
2026-09-18Bronx · West FarmsInitial Permit · Full Demolition1–5 milyon $full demolition of 6 story structure, using hand held and mechanical means to assist🔒 Adres ve yükleniciler
2026-09-18Manhattan · Upper East Side-Carnegie HillInitial Permit · Full Demolition1–5 milyon $full demolition of four story structure, using hand held with mechanical assist🔒 Adres ve yükleniciler
2026-09-18Manhattan · GramercyRenewal Permit Without Changes · Plumbing5–10 milyon $Modifications to existing Plumbing System related to Guestrooms renovation.🔒 Adres ve yükleniciler
2026-09-18Queens · MaspethRenewal Permit Without Changes · General Construction1–5 milyon $NEW 3 STORY MIXED USE BUILDING. (5) OPEN CAR PARKING SPACES. (7) ENCLOSED BICYCLE PARKING SPACES.🔒 Adres ve yükleniciler
2026-09-18Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction1–5 milyon $The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and🔒 Adres ve yükleniciler
2026-09-18Brooklyn · Borough ParkRenewal Permit with Changes · General Construction1–5 milyon $VERTICAL & HORIZONTAL ENLARGEMENT TO EXISTING 2 STORY BUILDING🔒 Adres ve yükleniciler
2026-09-18Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-17Manhattan · Upper East Side-YorkvilleInitial Permit · General Construction1–5 milyon $HEREBY FILING FOR DISTRIBUTION SYSTEM UPGRADE. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-17Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS, UNITS AND LETTERED, A, B, C, D, E, F, G, H, J, K, L, M, N, P, & Q = 15 UNITS PER FLOOR THERE IS N🔒 Adres ve yükleniciler
2026-09-17Staten Island · Mariner's Harbor-Arlington-GranitevilleRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Provide intermittent ventilation of Wet Well and Screen Room, Dry Well Pump Room, Valve Room and Access Room; Electric heaters for Dry Well Pump Room, Valve Room and Access Room. P🔒 Adres ve yükleniciler
2026-09-17Queens · WoodhavenInitial Permit · General Construction1–5 milyon $Repair/repoint select areas of damaged exterior brick and stone; Remove existing coatings on brick and replace with new breathable coating; Repair copper bulkhead roofs; Repair/rep🔒 Adres ve yükleniciler
2026-09-17Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $Interior Renovation and new demising wall on part of 1st floor🔒 Adres ve yükleniciler
2026-09-17Manhattan · West VillageRenewal Permit with Changes · General Construction1–5 milyon $Amending occupant loads and layout for the theater and relocating an exit.🔒 Adres ve yükleniciler
2026-09-17Staten Island · Westerleigh-Castleton CornersRenewal Permit with Changes · General Construction1–5 milyon $three story community facility with parking for 16 cars🔒 Adres ve yükleniciler
2026-09-17Brooklyn · Bushwick (East)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $Install new modulating Gas Burners, replace existing hot water pumps with variable speed motors & install 2-way control valves each floor. provide heating controls. Demo existing 🔒 Adres ve yükleniciler
2026-09-17Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Interior renovation of 33rd floor including new fixture, furniture, and finishes. New communication stairs between 33rd and 34th floor. No change in use, egress, or occupancy Ducer🔒 Adres ve yükleniciler
2026-09-17Manhattan · East VillageInitial Permit · Structural1–5 milyon $Repair of existing piers and beams supporting ground floor🔒 Adres ve yükleniciler
2026-09-17Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Structural1–5 milyon $Structural work as shown on plans🔒 Adres ve yükleniciler
2026-09-17Manhattan · East VillageRenewal Permit Without Changes · Structural1–5 milyon $Repair of existing slabs, beams, and piers supporting ground floor🔒 Adres ve yükleniciler
2026-09-17Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Remedial Facade work associated with FISP Cycle 10A as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-17Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · Mechanical Systems5–10 milyon $INSTALLATION OF MECHANICAL EQUIPMENT AND PIPING AS PER PLANS🔒 Adres ve yükleniciler
2026-09-17Brooklyn · Sunset Park (Central)Renewal Permit Without Changes · General Construction1–5 milyon $PROPOSED ENLARGEMENT EXITING 2 STORY RESIDENTIAL USE BUILDING TO 5 STORY COMMUNITY FACILITY AND RESIDENTIAL MIXED USE BUILDING, WORK ON CELLAR, 1ST~5TH FLOOR AND ROOF, OBTAIN NEW 🔒 Adres ve yükleniciler
2026-09-16Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Interior renovation as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-16Brooklyn · Fort GreeneRenewal Permit Without Changes · Plumbing1–5 milyon $ADA upgrade cap/remove various fixtures and install new plumbing fixtures, sump pump and roof drain🔒 Adres ve yükleniciler
2026-09-16Manhattan · East Midtown-Turtle BayInitial Permit · Plumbing10–50 milyon $Installation of a new plumbing system as per plans.🔒 Adres ve yükleniciler
2026-09-16Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction5–10 milyon $Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-16Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Modify mechanical ductwork and related piping. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-16Manhattan · Murray Hill-Kips BayRenewal Permit with Changes · General Construction1–5 milyon $Balcony repairs including new railings and concrete patching with repair mortar and misc. masonry replacement. No change in use occupancy or egress.🔒 Adres ve yükleniciler
2026-09-16Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction1–5 milyon $HEREWITH FILING FOR INTERIOR DEMO & FITOUT AND EXTERIOR WORK AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.🔒 Adres ve yükleniciler
2026-09-16Queens · Queensboro HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $NYPQ - AC 3, 4, 5 REPLACEMENTS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-16Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building.🔒 Adres ve yükleniciler
2026-09-16Brooklyn · Brooklyn HeightsInitial Permit · General Construction1–5 milyon $Interior demolition, construction of interior partitions and installation of doors and frames as shown. No change to use, egress, or occupancy🔒 Adres ve yükleniciler
2026-09-16Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $New VAV boxes, chilled water fan coil units, ductwork, piping, and controls per new architectural programming and ceilings🔒 Adres ve yükleniciler
2026-09-16Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandInitial Permit · Structural1–5 milyon $INSTALLATION OF NEW STAIR ON 3RD FL, REPLACE SKYLIGHT AND ADD BULKHEAD ON THE ROOF, HVAC UNITS INSTALLATION AND ASSOCIATED STRUCTURAL WORK FOR THE BUILDING AS PER PLANS FILED HEREW🔒 Adres ve yükleniciler
2026-09-16Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · General Construction10–50 milyon $INTERIOR BUILDOUT FOR OFFICE SPACE AS PER PLANS.🔒 Adres ve yükleniciler
2026-09-16Brooklyn · MadisonRenewal Permit Without Changes · Mechanical Systems1–5 milyon $PARTIAL INTERIOR AND EXTERIOR DEMOLITION. INTERIOR AND EXTERIOR RENOVATION, GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS. PLUMBING,FOUNDATION, SOE FILED UNDER SEPERATE AP🔒 Adres ve yükleniciler
2026-09-16Brooklyn · Prospect Lefferts Gardens-WingateRenewal Permit Without Changes · Structural10–50 milyon $REPLACEMENT OF PARAPETS & ROOFS.MASONRY WORK FOR FACE BRICK REPLACEMENT INCLUDING LINTELS, REPOINTING, CONCRETE COLUMN LIMESTONE CLADDING REPLACEMENT.🔒 Adres ve yükleniciler
2026-09-16Bronx · Soundview-Clason PointInitial Permit · General Construction1–5 milyon $RENOVATE EXISTING LIBRARY SUITE 209 - REMOVE EXISTING NON-STRUCTURAL PARTITIONS - MODIFY SUSPENDED CEILING- PROVIDE NEW NON-STRUCTURAL PARTITIONS - NO CHANGE IN USE - NO CHANGE IN 🔒 Adres ve yükleniciler
2026-09-16Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Herewith filing Alt-Co to establish new place of assembly, Cafeteria Accessory to existing office at 12th floor as per plans.🔒 Adres ve yükleniciler
2026-09-16Brooklyn · Mapleton-Midwood (West)Renewal Permit Without Changes · General Construction1–5 milyon $FILING FOR HORIZONTAL EXTENSION AT THE REAR OF AN EXISTING STRUCTURE ON ENLARGED LOT🔒 Adres ve yükleniciler
2026-09-16Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Interior fit-out, removal and installation of non load bearing partitions as per plans filed herewith- no change in use egress or occupancy🔒 Adres ve yükleniciler
2026-09-16Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-15Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Minor demolition. Installation of new partitions, floor finishes and suspended ceilings on the 4th Floor as per plans (BNP Asset Mgmt - Annex.) No change to use, egress or occupanc🔒 Adres ve yükleniciler
2026-09-15Queens · Jamaica Estates-HolliswoodRenewal Permit with Changes · General Construction1–5 milyon $Repairs to exterior masonry facade and main roof parapets; spot replacement of damaged brick, precast / stone window sills, window lintels & masonry tuck pointing.🔒 Adres ve yükleniciler
2026-09-15Brooklyn · Bushwick (West)Renewal Permit Without Changes · General Construction1–5 milyon $FILING ELECTRICAL DRAWINGS FOR THE FOLLOWING ITEMS: PROVIDE POWER CONNECTION FOR THE ELEVATOR; PROVIDE NEW POWER CONNECTION FOR MECHANICAL,PROVIDE NEW LIGHTING AND CONTROLS PER LA🔒 Adres ve yükleniciler
2026-09-15Brooklyn · GreenpointRenewal Permit Without Changes · General Construction1–5 milyon $Masonry rebuilding, waterproofing lining of gutters, drain pipe repair related interior repair as per plans filed herewith. no change to use, egress or occupancy to PK110K.🔒 Adres ve yükleniciler
2026-09-15Brooklyn · BrownsvilleRenewal Permit Without Changes · General Construction1–5 milyon $Facade restoration at Howard House #7 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-15Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit Without Changes · Mechanical Systems1–5 milyon $replacement of existing exhaust fans and make-up air units.🔒 Adres ve yükleniciler
2026-09-15Queens · Flushing-Willets PointInitial Permit · Full Demolition1–5 milyon $NYC DDC/DOT project for full demos of 6 existing structures.🔒 Adres ve yükleniciler
2026-09-15Brooklyn · Bedford-Stuyvesant (East)Renewal Permit Without Changes · General Construction10–50 milyon $Interior renovation of 7-story NYCHA multiple dwelling. Renovation, improvements at cellar, lobby, dwelling units, egress stairs, common corridors, laundry facility, community faci🔒 Adres ve yükleniciler
2026-09-15Manhattan · East Midtown-Turtle BayInitial Permit · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith. No change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-09-15Bronx · Rikers IslandRenewal Permit with Changes · General Construction1–5 milyon $General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupanc🔒 Adres ve yükleniciler
2026-09-15Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · Structural1–5 milyon $Facade repairs as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-15Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $BCG FLOORS 43 & 46-- GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR DEMOLITION AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPAN🔒 Adres ve yükleniciler
2026-09-15Manhattan · GramercyRenewal Permit Without Changes · General Construction1–5 milyon $Architectural modifications taking place on the Cellar, 1st and Mezz as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-15Bronx · MorrisaniaInitial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site Yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-15Staten Island · New Springville-Willowbrook-Bulls Head-TravisInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.🔒 Adres ve yükleniciler
2026-09-15Bronx · Hunts PointRenewal Permit Without Changes · Mechanical Systems10–50 milyon $Equipment gallery ventilation and heating. Control Building heating, cooling and ventilation. Gas room heating and ventilation.🔒 Adres ve yükleniciler
2026-09-15Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Interior tenant build-out on 6th floor including installation of non-load bearing partitions, doors/frames, and related finishes. No change in use, egress or occupancy under this a🔒 Adres ve yükleniciler
2026-09-15Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · General Construction10–50 milyon $PROPOSED 24 STORY RESIDENTIAL AND COMMERCIAL BUILDING. BUILDING #370 AND #362 (ON SINGLE ZONING LOT) FILED UNDER SEPARATE APPLICATION🔒 Adres ve yükleniciler
2026-09-15Bronx · NorwoodRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS🔒 Adres ve yükleniciler
2026-09-15Manhattan · East Harlem (South)Initial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-15Brooklyn · MadisonRenewal Permit Without Changes · General Construction1–5 milyon $Replace exterior ramps and reinforce concrete floors, patch and paint as required. PAA description in comments🔒 Adres ve yükleniciler
2026-09-15Manhattan · GramercyInitial Permit · General Construction1–5 milyon $Filing for a change of use at cellar & 1st floor from Office to an Exhibition space. Work includes a new interior non load bearing partition, finish work.🔒 Adres ve yükleniciler
2026-09-15Bronx · Eastchester-Edenwald-BaychesterRenewal Permit Without Changes · Plumbing1–5 milyon $FILED FOR PLUMBING WORK RELATED TO CONSTRUCTION OF GREENINFRASTRUCTURE PRACTICES AND PROPOSED CONNECTIONS TO NYCDEPSEWER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-15Brooklyn · Gravesend (East)-HomecrestRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR RENOVATION WITH VERTICAL & HORIZONTAL ENLARGEMENTS CHANGING THE METES AND BOUND TO THE LOT AS PER PLAN🔒 Adres ve yükleniciler
2026-09-15Manhattan · The Battery-Governors Island-Ellis Island-Liberty IslandInitial Permit · Mechanical Systems1–5 milyon $Mechanical work in conjunction with Alt-Co🔒 Adres ve yükleniciler
2026-09-15Manhattan · Greenwich VillageInitial Permit · Mechanical Systems1–5 milyon $Mechanical modifications taking place on the 1, 3-5, 9-12, 13- 16 construction/14-17 marketing floors as per plans filed herewith. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-15Manhattan · Hamilton Heights-Sugar HillRenewal Permit Without Changes · Plumbing5–10 milyon $FILING FOR PLUMBIING WORK IN CONJUNCTION WITH APPL # M00677430. NOCHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-15Manhattan · Washington Heights (South)Renewal Permit Without Changes · Plumbing1–5 milyon $Modification of plumbing system as shown on plans🔒 Adres ve yükleniciler
2026-09-14Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATION OF 1ST FLOOR COMMERICAL SPACE AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-14Bronx · Morris ParkRenewal Permit Without Changes · Plumbing1–5 milyon $1400 PELHAM PARKWAY SOUTH - PLUMBING MODIFICATIONS TO PROVIDE NEW SANITARY VENT DOMESTIC CLD WATER & DOMESTIC HOT WATER IN WEST AND SOUTH WING. PROVIDE NEW OXYGEN MEDICAL AIR AND V🔒 Adres ve yükleniciler
2026-09-14Brooklyn · Sunset Park (West)Renewal Permit Without Changes · Structural5–10 milyon $Structural modifications as indicated on the plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-14Brooklyn · Borough ParkInitial Permit · Structural10–50 milyon $REMOVAL AND REPLACEMENT OF FACE BRICK MASONRY, AS INDICATED ON DRAWINGS.2. REMOVAL AND REPLACEMENT OF SELECTIVE DECORATIVE TERRA COTTA AND LIMESTONEMASONRY, AS INDICATED ON DRAWING🔒 Adres ve yükleniciler
2026-09-14Manhattan · Upper East Side-Carnegie HillInitial Permit · Full Demolition1–5 milyon $full demolition of four story structure, by hand held equipment only.🔒 Adres ve yükleniciler
2026-09-14Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $Interior build-out related to LA Fitness. No change in Use, Egress or Occupancy.🔒 Adres ve yükleniciler
2026-09-14Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $PAA submitted to replace 100% the TC cornice with new FRP cornice, as shown in filed drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-14Brooklyn · WilliamsburgInitial Permit · General Construction1–5 milyon $REMOVAL AND REPLACEMENT OF INTERIOR NON LOAD BEARING PARTITIONS AT EXISTING LOCATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-14Brooklyn · East Flatbush-ErasmusRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Demolish and remove (4) existing AHU. Provide (4) new roof top units.🔒 Adres ve yükleniciler
2026-09-14Brooklyn · BrownsvilleRenewal Permit Without Changes · General Construction1–5 milyon $Facade restoration at Howard House Building #5 to comply with LL 11/98, cycle 9 report. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-14Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $Installation of overlay panels over existing spandrel panels, fire-rated opening infill and miscellaneous facade maintenance. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-14Bronx · Mott Haven-Port MorrisInitial Permit · Plumbing5–10 milyon $BACK OF HOUSE WORK INCLUDES ALL DOMESTIC WATER PIPING WITHIN FIRST FLOOR AND CELLAR INCLUDING ALL RISERS UPSTREAM OF LEAK DETECTION METERS AND ALL LEAK DETECTION METERS, AS DEPICTE🔒 Adres ve yükleniciler
2026-09-14Brooklyn · BrownsvilleRenewal Permit Without Changes · General Construction1–5 milyon $Facade restoration at Howard House #2 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-14Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $AT 35TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.🔒 Adres ve yükleniciler
2026-09-14Manhattan · East VillageInitial Permit · Mechanical Systems1–5 milyon $Mechanical work for Intuit space on 7th floor🔒 Adres ve yükleniciler
2026-09-14Manhattan · East VillageInitial Permit · General Construction1–5 milyon $General construction for Intuit space on 7th floor🔒 Adres ve yükleniciler
2026-09-14Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION FROM THE 33RD TO THE 35TH FLOORS AS PLANS FILED FOR HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-14Queens · AuburndaleInitial Permit · Earth Work1–5 milyon $Playground redevelopment, Including removal & installation of asphalt pavement, playground equipment, and landscaping.🔒 Adres ve yükleniciler
2026-09-14Queens · Forest HillsRenewal Permit with Changes · General Construction10–50 milyon $(HUB job) Convert existing 6 story hospital building to an 8 story residential AIRS and Community Facility building under ZR Article 1 Chapter 5, Vertical and Horizontal enlargemen🔒 Adres ve yükleniciler
2026-09-14Manhattan · Midtown-Times SquareInitial Permit · Structural5–10 milyon $Exterior alterations to add new occupiable roof level; reinforcing existing roof slab, install new rooftop canopy structure, new slab opening for HVAC, slab infill on the 43rd Floo🔒 Adres ve yükleniciler
2026-09-14Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and installation of non-load bearing partitions, doors/frames, ceiling/lighting and related finishes as per plans filed herewith. No change in use, egress or occupancy unde🔒 Adres ve yükleniciler
2026-09-14Staten Island · Todt Hill-Emerson Hill-Lighthouse Hill-Manor HeightsInitial Permit · Plumbing1–5 milyon $FILING HEREWITH SITE PLUMBING INCLUDING STORMWATER DRAINAGE, RETENTION AND INFILTRATION SYSTEMS AND NEW WATER SERVICE AS INDICATED ON PLANS.🔒 Adres ve yükleniciler
2026-09-14Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Interior demo and general construction for part of the 7th floor.🔒 Adres ve yükleniciler
2026-09-11Manhattan · GramercyRenewal Permit with Changes · General Construction1–5 milyon $PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL LOBBY. NEW FINISHES AND LIGHTING WITH PARTITION MODIFICATIONS. UPDATES TO EXISTING MAR🔒 Adres ve yükleniciler
2026-09-11Manhattan · Washington Heights (South)Initial Permit · General Construction1–5 milyon $EXTERIOR RESTORATION INCLUDING BRICK MASONRY, TERRACOTTA, LIMESTONE, PARAPET AND LINTEL REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-11Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical modifications to take place on the cellar as per drawings filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-11Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $General construction modifications taking place on the 23-24 Construction/ 24-25 Marketing floors as per plans filed herewith. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-11Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Architectural work on the 7th and 12th as indicated on drawings.🔒 Adres ve yükleniciler
2026-09-11Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Filing herewith Mechanical modifications as per plans.🔒 Adres ve yükleniciler
2026-09-11Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION ON THE 13TH THRU 15TH AND 18TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-11Manhattan · Greenwich VillageInitial Permit · General Construction10–50 milyon $General construction modifications taking place on the cellar, 1, 3-5, 9-12, 13- 16 construction/14-17 marketing floors as per plans filed herewith. No change in use, egress or occ🔒 Adres ve yükleniciler
2026-09-11Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Central ParkInitial Permit · Mechanical Systems10–50 milyon $SSCP. South Side Chiller Plant. DEMO AND REPLACE EXIST. COOLING TOWER ON P-WING ROOF. DECOMISSIONING OF EXIST. SATELITE CHILLER PLANTS IN K-WING AND U-WING. ADDITION OF 2 NEW CHIL🔒 Adres ve yükleniciler
2026-09-10Bronx · West FarmsInitial Permit · Full Demolition1–5 milyon $full demolition of 5 story structure using hand held and mechanical means.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $INTERIOR ARCHITECTURAL OFFICE RENOVATION ON 4TH AND 5TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Modification to existing HVAC systems. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-10Staten Island · Grasmere-Arrochar-South Beach-Dongan HillsRenewal Permit Without Changes · Standpipe1–5 milyon $Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drai🔒 Adres ve yükleniciler
2026-09-10Manhattan · Hell's KitchenInitial Permit · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES ON FLOOR 3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS CAPACITY, OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-10Manhattan · Upper West Side-Lincoln SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Herewith filing for mechanical modifications as per plans including new units on the roof. no change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction5–10 milyon $VERTICAL ENLARGEMENT AND CONVERSION OF AN EXISTING 6-STORY COMMERCIAL BUILDING INTO A RESIDENTIAL 11-STORY BUILDING🔒 Adres ve yükleniciler
2026-09-10Brooklyn · Prospect Lefferts Gardens-WingateRenewal Permit with Changes · General Construction10–50 milyon $NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL1) - FILING FOR A NEW BUILDING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW BUILDING🔒 Adres ve yükleniciler
2026-09-10Bronx · TremontRenewal Permit Without Changes · Earth Work1–5 milyon $removal of asphalt pavement and benches. Installation of new asphalt pavement, play unit, safety surface, picnic tables, planters and benches.🔒 Adres ve yükleniciler
2026-09-10Bronx · TremontRenewal Permit Without Changes · General Construction1–5 milyon $X234-REMOVAL OF TCU. RESURFACE EXISTING ASPHALT. REPLACE EQUIPMENT WITH NEW. NEW BENCHES, GAME LINES, BASKETBALL COURT.🔒 Adres ve yükleniciler
2026-09-10Queens · North CoronaRenewal Permit with Changes · Foundation1–5 milyon $VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING MIXED USE BUILDING.🔒 Adres ve yükleniciler
2026-09-10Brooklyn · Borough ParkRenewal Permit Without Changes · Structural1–5 milyon $Structural framing and work as per plans filed🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or 🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $Removal and installation of interior non-load bearing partition and related finishes as per drawings.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Morningside HeightsRenewal Permit Without Changes · General Construction1–5 milyon $APPLICATION FILED HEREWITH FOR FACADE RESTORATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Harlem (South)Initial Permit · Sprinklers1–5 milyon $INSTALLATION OF A NEW SPRINKLER SYSTEM THROUGHOUT THE BUILDING AND PROVISION OF THE SPRINKLER COVERAGE TO THE EXISTING LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal of non-structural elements on all floor in a commercial building. No change in use, egress or occupancy .🔒 Adres ve yükleniciler
2026-09-10Staten Island · Westerleigh-Castleton CornersInitial Permit · General Construction1–5 milyon $NYU PHYSICIAN PRACTICE - 1534 VICTORY BLVD - INTERIOR RENOVATIONS TO EXISTING FIRST FLOOR AMBULATORY CARE FACILITY AND FINISHES AT LOBBY ENTRANCE. NO CHANGE IN USE, EGRESS, OR OCCU🔒 Adres ve yükleniciler
2026-09-10Bronx · MorrisaniaRenewal Permit Without Changes · General Construction1–5 milyon $Remove (8) TCUs including all related utilities & fire alarm, asphalt & concrete pavements, concrete curbs, chain link fencing gates, guardrail. Installation of new pavements, synt🔒 Adres ve yükleniciler
2026-09-10Queens · Forest HillsRenewal Permit Without Changes · General Construction1–5 milyon $Filing for exterior repair work at the roof and all facades. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or 🔒 Adres ve yükleniciler
2026-09-10Manhattan · Upper East Side-Carnegie HillInitial Permit · Full Demolition1–5 milyon $full demolition of two story structure using hand held and mechanical means to assist with first floor removal.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Murray Hill-Kips BayInitial Permit · General Construction1–5 milyon $Facade Repair Project as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Tribeca-Civic CenterInitial Permit · Sprinklers1–5 milyon $Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Mechanical modifications on Floors 03 through 06. No change in use, egress, or occupancy in this application.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Filing herewith for the installation of mechanical/hvac for amenities floors.🔒 Adres ve yükleniciler
2026-09-10Manhattan · Washington Heights (South)Renewal Permit with Changes · General Construction50 milyon $ üzeriAs per HUB consultation. The expansion project will be designed & classified as an addition to the existing RBSP & will be 9 storiesin height w/ approximately 75,000 sf of NB area🔒 Adres ve yükleniciler
2026-09-09Staten Island · Grasmere-Arrochar-South Beach-Dongan HillsRenewal Permit Without Changes · General Construction5–10 milyon $Removal and renovation of interior non-load bearing paritions. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-09Brooklyn · Brooklyn HeightsInitial Permit · General Construction1–5 milyon $FACADE REPAIRS (FISP CYCLE 9)🔒 Adres ve yükleniciler
2026-09-09Brooklyn · Bay RidgeRenewal Permit Without Changes · General Construction1–5 milyon $Repairs to the exterior masonry. Interior renovations at Boy's and Girls Cellar Toilet rooms, Kindergarten Toilet room, Cellar, first floor main entrance, and Auditorium. There wil🔒 Adres ve yükleniciler
2026-09-09Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $OFFICE INTERIOR FIT-OUT FOR BOTH THE 25TH AND 26TH FLOORS (29TH & 30TH FLOOR MARKETING)🔒 Adres ve yükleniciler
2026-09-09Manhattan · Hell's KitchenInitial Permit · General Construction1–5 milyon $Interior reno of 42 units consisting of existing 1 bedroom apt units 2 bedroom apt units and studio apt units to meet or exceed UFAS compliance as indicated on drawings. Minor reco🔒 Adres ve yükleniciler
2026-09-09Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction10–50 milyon $REMOVAL OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-09Staten Island · Port RichmondRenewal Permit Without Changes · General Construction1–5 milyon $Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements.🔒 Adres ve yükleniciler
2026-09-09Manhattan · GramercyInitial Permit · General Construction1–5 milyon $HEREWITH FILING GENERAL CONSTRUCTION WORK FOR INTERIOR RENOVATION, NON BEARING PARTITION, FLOORING, CEILING, & MILLWORK. NO CHANGE TO USE OCCUPANCY OR EGRESS🔒 Adres ve yükleniciler
2026-09-09Brooklyn · South WilliamsburgRenewal Permit Without Changes · General Construction1–5 milyon $APPLICATOIN FILED HERWITH FOR INTERIOR RENOVATION TO CELLAR, FIRST, SECOND AND PART OF THIRD AND FOURTH FLOOR OF AN EXISTING FOUR STORY MIXED USED BUILDING. NO EGRESS OF BULK CHANG🔒 Adres ve yükleniciler
2026-09-09Manhattan · Upper West Side-Lincoln SquareInitial Permit · Mechanical Systems1–5 milyon $HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-09Manhattan · GramercyInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATION OF EXISTING 17TH FLOOR PENTHOUSE, INCLUDING RECEPTION, LOUNGES, TOILET ROOMS, BARS, FINISHES, AND LIGHTING THROUGHOUT, PARTITION MODIFICATIONS,NEW WINDOWS AND D🔒 Adres ve yükleniciler
2026-09-09Manhattan · Washington Heights (South)Initial Permit · General Construction1–5 milyon $Interior alterations, including modification of interior non-loadbearing partitions, bathrooms, and kitchens. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-09Bronx · Mott Haven-Port MorrisRenewal Permit Without Changes · General Construction1–5 milyon $Proposed vertical enlargement to an existing 1-story + cellar community facility building, converting to a 2-story + cellar community facility building.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Filing herewith mechanical/hvac installations/modifications on floors 24 through 26 as per plans. No change in use, egress, or occupancy in this application.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Filing herewith mechanical/hvac ductwork and piping for floors 27 through 29. Early scope filed in Mechanical job # M01344776-I1 with construction costs included in this filing. No🔒 Adres ve yükleniciler
2026-09-08Manhattan · Greenwich VillageRenewal Permit Without Changes · Plumbing1–5 milyon $Filing herewith sprinkler and plumbing modifications as per plans🔒 Adres ve yükleniciler
2026-09-08Bronx · TremontRenewal Permit Without Changes · General Construction10–50 milyon $APPLICATION FILED FOR NEW 8-STORY BUILDING AS PER FILED HEREWITH.🔒 Adres ve yükleniciler
2026-09-08Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION TAKING PLACE ON 7TH FLOOR AS SHOWN ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Upper West Side-Lincoln SquareInitial Permit · General Construction1–5 milyon $Work includes per the filed plans remove/replace roof membrane, flashing, replace roof drains, repair/replace selected guard rails, remove/replace cracked masonry units, masonry re🔒 Adres ve yükleniciler
2026-09-08Queens · Pomonok-Electchester-HillcrestInitial Permit · General Construction1–5 milyon $SELECTIVE INTERIOR DEMOLITION OF NON-STRUCTURAL ELEMENTS. NEW INTERIOR PARTITIONS,DOORS, CEILINGS, FINISHES, ELECTRICAL, HVAC, PLUMBING, FIRE ALARM, AND FIRE PROTECTION.NO CHANGE O🔒 Adres ve yükleniciler
2026-09-08Manhattan · GramercyInitial Permit · General Construction1–5 milyon $Architectural modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-08Queens · Far Rockaway-BayswaterRenewal Permit Without Changes · General Construction5–10 milyon $MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $MJFF -- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH OFFICE BUILDOUT.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $Filing herewith removal and installation of interior non load bearing partitions and related finishes as per plans. No change in use, occupancy, or egress under this application.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · Plumbing5–10 milyon $NYU - Multi-Floor Reno - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-08Brooklyn · Sunset Park (West)Initial Permit · General Construction1–5 milyon $HEREWITH FILING FOR OPEN PARKING LOT FOR NYU LANGONE HEALTH WITH PARKING LIFTS FOR 327 SPACES AND ATTENDANT BOOTH ACCESSORY FO UG 4A NB B08050677.🔒 Adres ve yükleniciler
2026-09-08Staten Island · Port RichmondInitial Permit · General Construction1–5 milyon $REMOVAL AND REPLACEMENT OF FURRED GYPSUM BOARD WALLS AT RETAINING WALLS, FLOORING, DOORS, FRAMES, CASEWORK, RESILIENT BASE, FIN TUBE RADIATORS, CONCRETE FLOOR SLAB. INSTALLATION OF🔒 Adres ve yükleniciler
2026-09-08Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATION OF TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-08Manhattan · Upper West Side (Central)Renewal Permit Without Changes · Structural1–5 milyon $Exterior Facade & Roof per the plans: Removal and replacement of the existing roof membrane & flashing, cracked masonry units, parapet and roof drains. Installation of guard rails.🔒 Adres ve yükleniciler
2026-09-08Brooklyn · Bushwick (West)Renewal Permit with Changes · General Construction1–5 milyon $Proposed horizontal and vertical enlargement to create an 4-story and penthouse, 8-family mixed use building🔒 Adres ve yükleniciler
2026-09-08Brooklyn · East New York-New LotsRenewal Permit Without Changes · Plumbing1–5 milyon $Application filed herewith for the installation of new underground sanitary and storm piping for new building. Filed in conjunction with NB applic. # 321590774. Associated DOBNOW🔒 Adres ve yükleniciler
2026-09-08Queens · ElmhurstInitial Permit · General Construction1–5 milyon $Elmhurst Hospital Center Roof repairs as per the plans filed including: Removal/ replacement / repairs of existing roof membrane & flashings, existing roof drains and metal coating🔒 Adres ve yükleniciler
2026-09-08Queens · Astoria (East)-Woodside (North)Initial Permit · Structural1–5 milyon $(PHASE 2) - RESTORATION OF INTERIOR MASONARY WALLS. SUPPORT OF NEW ROOFTOP UNITS. RAISE FIRST FLOOR CEILING. ADDITION OF STAIR CASE FROM THE CELLAR TO FIRST FLOOR. FIRST FLOOR SLAB🔒 Adres ve yükleniciler
2026-09-08Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction1–5 milyon $MINOR ALTERATIONS WITH NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-04Bronx · Bedford ParkRenewal Permit Without Changes · General Construction1–5 milyon $Lehman College, Shuster Hall Exterior Faade, Stair and Loading Dock renovation and repairs as per the plans filed including removal & replacement of facade conditions, stairs, rail🔒 Adres ve yükleniciler
2026-09-04Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · Structural1–5 milyon $Facade modifications as per drawings filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-04Bronx · Bedford ParkRenewal Permit Without Changes · Structural1–5 milyon $Lehman College, Fine Arts Building Exterior Faade, Stair and Loading Dock renovation and repairs as per the plans filed including removal & replacement of facade conditions, stairs🔒 Adres ve yükleniciler
2026-09-04Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $Scope to include new storefront and marquee at Broadway main lobby entrance, new storefront at 50th Street secondary lobby entrance, associated structural modification, new mechani🔒 Adres ve yükleniciler
2026-09-04Brooklyn · CanarsieInitial Permit · General Construction1–5 milyon $Breukelen Bldg 28, Facade repairs: Removal/replacement/repairs of cracked masonry units, steel lintels and brick masonry. Provide slate sill and new backer rod & sealant. Masonry r🔒 Adres ve yükleniciler
2026-09-04Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Removal of existing windows, facade stone and waterproofing and installation of new on the 1st, 2nd, 3rd and 4th floors(Harry Winston - Exterior) as per plans. No change to use, e🔒 Adres ve yükleniciler
2026-09-04Bronx · ParkchesterInitial Permit · General Construction1–5 milyon $BUILD OUT OF THE INTERIOR OFFICE SPACE ON THE CELLAR, 1ST & 2ND FLOOR. INCLUDES DEMOLITION OF EXISTING PARTITIONS & INSTALLATION OF NEW PARTITIONS (FIRE-RATED WHERE REQUIRED) & IN🔒 Adres ve yükleniciler
2026-09-04Brooklyn · Sunset Park (West)Renewal Permit Without Changes · General Construction50 milyon $ üzeriHerewith filing for 6 story Ambulatory Health Care New building as per plans. Early foundation pursuant to admin code 28-104.2.5.🔒 Adres ve yükleniciler
2026-09-04Brooklyn · BrownsvilleRenewal Permit with Changes · General Construction10–50 milyon $Filing New Building herewith. Consultation meeting took place 12/8/21.🔒 Adres ve yükleniciler
2026-09-04Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work for Dental Center & Member's Lobby as per plans filed herewith. no change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-04Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit with Changes · General Construction10–50 milyon $HEREBY FILING INTERIOR DEMO TO REMOVE PORTIONS OF EXISTING CEILINGS, NONBEARING PARTITIONS, REMOVAL OF EXISTING STAIRS, ELEVATORS & EXISTING PLUMBING FIXTURES. GENERAL CONSTRUCTION🔒 Adres ve yükleniciler
2026-09-04Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $PHASE 3.3: Partial int. fitout including dismantling/installation of non-load bearing walls, doors, ceiling, floors, finishes, exterior repairs and glazing. Replace existing window🔒 Adres ve yükleniciler
2026-09-04Brooklyn · FlatbushRenewal Permit Without Changes · General Construction1–5 milyon $REMOVAL & REPLACE OF WINDOWS, REPOINTING AND LOCAL REMOVAL & REPLACEMENT OF DAMAGED STONE. REMOVAL & REPLACE OF PARAPETS WALLS AND ROOFS. COURTYARD SLAB REMOVAL & RECONSTRUCTION 🔒 Adres ve yükleniciler
2026-09-04Brooklyn · Borough ParkRenewal Permit with Changes · General Construction1–5 milyon $HEREWITH FILING FOR VERTICAL AND HORIZONTAL ENLARGEMENT, AND INTERIOR RENOVATION🔒 Adres ve yükleniciler
2026-09-03Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems5–10 milyon $Filing herewith for the installation of mechanical/hvac scope as per plans.🔒 Adres ve yükleniciler
2026-09-03Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $LEVEL 23 GENERAL CONSTRUCTION FOR OFFICE FITOUTINCLUDING NEW PARTITIONS, INTERIOR GLAZING, FLOORING,CEILING, LIGHTING, AND LIGHTING CONTROLS.NO IMPACT ON PRESENT ZONING OF BUILDING🔒 Adres ve yükleniciler
2026-09-03Manhattan · East Harlem (North)Renewal Permit with Changes · General Construction1–5 milyon $ENLARGEMENT OF EXISTING 1 STORY COMMERCIAL BUILDING WITH 4 STORIES OF RESIDENTIAL (1 DU EACH ON FLOORS 2 AND 3. 2 UNITS EACH ON FLOORS 4 AND 5).🔒 Adres ve yükleniciler
2026-09-03Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Filing herewith general construction scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this applicat🔒 Adres ve yükleniciler
2026-09-03Manhattan · Midtown-Times SquareInitial Permit · Sprinklers1–5 milyon $Filing herewith sprinkler and standpipe installations/modifications on floors 34-38 as per plans. No change in use, occupancy, or egress proposed under this application.🔒 Adres ve yükleniciler
2026-09-03Bronx · NorwoodInitial Permit · General Construction1–5 milyon $MONTEFIORE - LAB 9 - MODIFICATIONS OF PARTITIONS, CEILING, DOORS PLUS CONNECTING BRIDGE ADDITION ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-03Staten Island · West New Brighton-Silver Lake-Grymes HillRenewal Permit Without Changes · General Construction1–5 milyon $Seton bldg-ARCHITECTURAL WORK FOR PROPOSED ROOF REPLACEMENT FOR SETON BUILDING LOCATED AT RICHMOND UNIVERSITY MEDICAL CENTER. ALL AS PER PLANS FILED HEREWITH.🔒 Adres ve yükleniciler
2026-09-03Brooklyn · Bedford-Stuyvesant (West)Initial Permit · General Construction1–5 milyon $ALTERATION APPLICATION FOR THE CURRENTLY APPROVED SUPERMARKET UNDER THE FRESH PROGRAM AT THE FIRST AND CELLAR FLOOR. INTERIOR PARTITIONS, PLUMBING THROUGHOUT.🔒 Adres ve yükleniciler
2026-09-03Bronx · Concourse-Concourse VillageInitial Permit · Sprinklers1–5 milyon $Install sprinkler heads to existing sprinkler and standpipe system as per plan filed in conjunction with GC # X01373793-I1.🔒 Adres ve yükleniciler
2026-09-03Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · General Construction1–5 milyon $Interior fit out🔒 Adres ve yükleniciler
2026-09-03Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems10–50 milyon $Modifications to the existing HVAC System: Removal and replacement of HVAC equipment and system, including (11) Air Handling Units being replaced on the 16th Floor as per plans (AH🔒 Adres ve yükleniciler
2026-09-03Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $Removal and construction of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-03Manhattan · Upper East Side-YorkvilleRenewal Permit Without Changes · Mechanical Systems5–10 milyon $REMOVAL AND REPLACEMENT OF HEATING AND VENTILATION UNITS, MODIFICATION OF EXISTING DUCTWORK, AND INSTALLATION OF NEW EXHAUST FANS.🔒 Adres ve yükleniciler
2026-09-03Brooklyn · Gravesend (South)Renewal Permit with Changes · General Construction1–5 milyon $Vertical and horizontal enlargement of the existing building🔒 Adres ve yükleniciler
2026-09-03Brooklyn · Clinton HillInitial Permit · General Construction1–5 milyon $THIS APPLICATION IS FILED FOR MINOR INTERIOR ALTERATION WORK ON GROUND, 2ND, PARTIAL 3RD & 4TH FLOOR ONLY & REPAIR EXIST STAIRS TO ADDRESS VIO#39147401K & #34687097K. NO CHANGE IN 🔒 Adres ve yükleniciler
2026-09-03Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-03Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Filed herewith front facade replacement. No change of use, occupancy or egress under this application🔒 Adres ve yükleniciler
2026-09-03Manhattan · Washington Heights (South)Renewal Permit Without Changes · General Construction1–5 milyon $Application filed for Facade repair at Bard Hall building as per plans. No changes to egress or occupancy.🔒 Adres ve yükleniciler
2026-09-03Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Interior renovation / modifications as per plans filed herewith. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-03Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $#8998 - STOREFRONT AND NON-BEARING PARTITION INSTALLATIONS IN EXISTING RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or 🔒 Adres ve yükleniciler
2026-09-02Queens · Kew Gardens HillsInitial Permit · General Construction1–5 milyon $HEREWITH FILE ALT CO FOR TO ADD A SECOND STORY TO AN EXISTING 1 STORY COMMERICAL BUILDING, IN ORDER TO DO VERTICAL ENLARGEMENT, AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-02Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $APPLICATION FILED TO RENOVATE OFFICES SPACES AT FLOORS 8 & 23. WOIRK INCLUDES DEMOLITION OF EXISTING PARTITIONS AND CONSTRUCTION OF NEW INTERIOR PARTITIONS, DOORS, AND FINISHES. NO🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith🔒 Adres ve yükleniciler
2026-09-02Manhattan · Chinatown-Two BridgesRenewal Permit Without Changes · General Construction1–5 milyon $NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boil🔒 Adres ve yükleniciler
2026-09-02Queens · Forest HillsRenewal Permit Without Changes · General Construction1–5 milyon $Filing for masonry and related exterior repairwork. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-02Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $Filing for the renovation of duplex apt 1/2B at the 1st and 2nd floor. Work includes removal and installation of interior non load bearing partitions, doors, finish work. No change🔒 Adres ve yükleniciler
2026-09-02Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Hereby filing to construct new interior partitions, ceilings and doors for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Filing herewith partial (exterior) demolition of existing facade, including but not limited to windows removals and terraces elements as per plans. No change in use, occupancy, or 🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION WORK AS SHOWN ON PLANS FILED HEREWITH🔒 Adres ve yükleniciler
2026-09-02Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $Herewith filing for facade repair as per the drawings. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-02Brooklyn · Crown Heights (North)Initial Permit · Mechanical Systems1–5 milyon $Mechanical work as shown on plans🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $FILED HEREWITH FOR INTERIOR FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-09-02Brooklyn · Cypress HillsInitial Permit · General Construction1–5 milyon $PROPOSED NEW FIVE (5) STORY WITH CELLAR. MIXED-USE BUILDING. MECHANICAL (MH), STRUCTURAL (ST), PLUMBING/SPRINKLER/STANDPIPE (PL/SP/SD), FIRE ALARM(FA) & BPP FILED SEPERATELY. 8 CL🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Mechanical work Floors 42-43.🔒 Adres ve yükleniciler
2026-09-02Manhattan · East Harlem (North)Initial Permit · General Construction5–10 milyon $INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF CELLAR, INTERIOR UNITS AND CORRIDORS. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESSIS PROPOSED UND🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Filing herewith mechanical/hvac installations/modifications on floors 30 through 33. Filing in conjunction with early-phase mechanical #M01344778-I1 approved and permitted. No chan🔒 Adres ve yükleniciler
2026-09-02Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Removal and installation of non-load bearing partitions, doors, frames, flooring, ceiling and related finishes as per plans filed herewith. No change in use, egress or occupancy un🔒 Adres ve yükleniciler
2026-09-02Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Filing herewith removal and installation of interior non load bearing partitions and related finishes as per plans. No change in use, occupancy, or egress under this application.🔒 Adres ve yükleniciler
2026-09-02Queens · Forest HillsRenewal Permit Without Changes · General Construction1–5 milyon $Filing for masonry and related exterior repairwork. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-09-02Bronx · Eastchester-Edenwald-BaychesterInitial Permit · General Construction1–5 milyon $INTERIOR AND EXTERIOR RENOVATIONS OF EXISTING TRUCK TERMINAL AND ADJACENT PARKING INSIDE PROPERTY LINE INCLUDING STRUCTURAL FRAMING AND CONCRETE RAMP REPLACEMENT AS PER PLANS FILED🔒 Adres ve yükleniciler
2026-09-02Manhattan · Washington Heights (North)Renewal Permit with Changes · General Construction1–5 milyon $Reroofing as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-09-02Bronx · MorrisaniaRenewal Permit with Changes · General Construction1–5 milyon $APPLICATION FILED HEREWITH TO CONVERT AN EXISTING TWO STORY + CELLAR AND BASEMENT MIXED USE BUILDING INTO A TEN FAMILY RESIDENTIAL BUILDING🔒 Adres ve yükleniciler
2026-09-02Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems5–10 milyon $WCM INTERIOR 2 & 3: DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-02Manhattan · Murray Hill-Kips BayInitial Permit · General Construction1–5 milyon $Architectural/Structural modifications taking place on the 1st floor (lobby exterior) as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-01Queens · Queensbridge-Ravenswood-Dutch KillsRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work related to Covid Ventialtion upgrades.🔒 Adres ve yükleniciler
2026-09-01Manhattan · Tribeca-Civic CenterRenewal Permit with Changes · Support of Excavation1–5 milyon $Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site.🔒 Adres ve yükleniciler
2026-09-01Brooklyn · Sunset Park (West)Initial Permit · General Construction1–5 milyon $Renovation of existing business occupancy into medical office space, including 15 exam rooms, waiting area associated support spaces. No change to use, egress or occupancy🔒 Adres ve yükleniciler
2026-09-01Bronx · Mott Haven-Port MorrisRenewal Permit Without Changes · General Construction1–5 milyon $X027_Remove existing blowers. Provide H&V units in cellar and roof, new AC units in cellar and on roof, and new roof fans. Provide new ductwork and shaft vents.🔒 Adres ve yükleniciler
2026-09-01Manhattan · Midtown-Times SquareInitial Permit · General Construction10–50 milyon $Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or 🔒 Adres ve yükleniciler
2026-09-01Brooklyn · Bushwick (East)Initial Permit · General Construction1–5 milyon $Four Story and Penthouse, mixed use building consisting of 8 residential dwelling units, commercial space and a community facility🔒 Adres ve yükleniciler
2026-09-01Brooklyn · South WilliamsburgInitial Permit · Sprinklers1–5 milyon $Sprinkler/Standpipe work in conjunction with Alt-CO.🔒 Adres ve yükleniciler
2026-09-01Manhattan · Chinatown-Two BridgesRenewal Permit Without Changes · General Construction1–5 milyon $Change the use in Cellar from Eating & Drinking Establishment to Retail; 18,498 S.F. interior renovation with new partitions, demolition of non-structural partitions, relocation of🔒 Adres ve yükleniciler
2026-09-01Manhattan · Financial District-Battery Park CityInitial Permit · Plumbing1–5 milyon $Plumbing work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-09-01Queens · JamaicaRenewal Permit Without Changes · General Construction1–5 milyon $MEDISYS HEALTH NETWORK, CENTER FOR WELLNESS AND HEALTH AMBULATORY CARE CENTER. WORK INCLUDES INTERIOR PARTITIONS, SUSPENDED CEILINGS, FINISHES; CHANGE OF USE TO COMMUNITY FACILITY 🔒 Adres ve yükleniciler
2026-09-01Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit with Changes · General Construction5–10 milyon $Herewith filed 5 story mixed use New Building.🔒 Adres ve yükleniciler
2026-09-01Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $MECHANICAL MODIFICATIONS AND INSTALLATION OF SYSTEMS ASSOCIATED DUCTS AND PIPING🔒 Adres ve yükleniciler
2026-09-01Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, DOORS AND FINSHES AS SHOWN ON DRAWINGS. NO CHANG TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-09-01Queens · Queensbridge-Ravenswood-Dutch KillsRenewal Permit Without Changes · General Construction1–5 milyon $Auditorium seating replacement, replace existing fixed seating with new fixed seating with no impact to occupancy. Install new bi-level ADA compliance drinking fountains with bottl🔒 Adres ve yükleniciler
2026-09-01Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $Interior renovation of 4th floor office space as per plans filed. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-09-01Queens · Astoria (East)-Woodside (North)Renewal Permit Without Changes · Plumbing1–5 milyon $INSTALLATION OF A PACKAGE DOMESTIC HOT WATER PODS, INCLUDING DIRECT-BURIED DOMESTIC HOT WATER PIPING, AND PUMPS. CONNECT THE NEW TO EXISTING DOMESTIC HOT WATER PIPING PER PLANS. NO🔒 Adres ve yükleniciler
2026-09-01Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction1–5 milyon $General Construction for installation of interior partitions, floors, ceilings and related finishes as per plans for tenant fitout🔒 Adres ve yükleniciler
2026-09-01Queens · Flushing-Willets PointInitial Permit · Mechanical Systems1–5 milyon $INSTALL NEW HVAC SYSTEM FOR NEW COMMERCIAL HOTEL BUILDING IN CONJUNCTION WITH NB #421405642.NO CHANGE IN USE,EGRESS AND OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-31Brooklyn · KensingtonRenewal Permit Without Changes · General Construction1–5 milyon $Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Repl🔒 Adres ve yükleniciler
2026-08-31Queens · College PointRenewal Permit Without Changes · General Construction1–5 milyon $WATER INFILTRATION REPAIR / MITIGATIONAT EXISTING SCHOOL P.S. 029 - QUEENS, INCLUDING STRUCTURAL REPAIR, WATERPROOFING OF BELOW-GRADE FOUNDATION WALLS, AND ASSOCIATED SITE IMPROVEM🔒 Adres ve yükleniciler
2026-08-31Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $WCM Lobby, Cellar; Interior partitions and finishes to accommodate the Primary Care Renovation in the existing building.🔒 Adres ve yükleniciler
2026-08-31Brooklyn · Fort GreeneRenewal Permit Without Changes · General Construction1–5 milyon $Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-31Bronx · Kingsbridge-Marble HillRenewal Permit with Changes · General Construction1–5 milyon $Filing for facade and balcony repairs as per plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-31Queens · Astoria (North)-Ditmars-SteinwayInitial Permit · Structural5–10 milyon $INSTALLATION OF ONE-STORY MOTOR CONTROL CENTER (MCC) ENCLOSURE ON FOUNDATION APPROVED UNDER APPLICATION # Q01238068-I1.🔒 Adres ve yükleniciler
2026-08-31Queens · Astoria (North)-Ditmars-SteinwayInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL INSTALLATION TO INCLUDE NITROGEN STORAGE, VAPORIZERS, PIPING, CONTROLS AND OTHER ASSOCIATED SYSTEMS.🔒 Adres ve yükleniciler
2026-08-31Brooklyn · Coney Island-Sea GateInitial Permit · Foundation1–5 milyon $Propose to install new canopy and new pre-engineered kiosk. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-31Brooklyn · Bedford-Stuyvesant (West)Initial Permit · Structural1–5 milyon $STRUCTURAL APPLICATION FILED IN CONJUNCTION TO APPLICATION #B01286361-I1🔒 Adres ve yükleniciler
2026-08-31Bronx · University Heights (North)-FordhamRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work for comprehensive energy upgrades as per plans filed herewith. No change to use, egress or occupancy🔒 Adres ve yükleniciler
2026-08-31Brooklyn · Bedford-Stuyvesant (East)Renewal Permit Without Changes · Structural1–5 milyon $IT IS PROPOSED TO REPAIR FACADE - BRICK REPLACEMENT; POINTING, REMOVE AND REPLACE STEEL WINDOW LINDEL, WATERPROOF STEEL SHELF ANGLE AS SHOWN ON PLANS.🔒 Adres ve yükleniciler
2026-08-31Manhattan · Murray Hill-Kips BayRenewal Permit with Changes · Mechanical Systems5–10 milyon $NYU - MSB Restack Build Out - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-31Queens · Forest HillsRenewal Permit Without Changes · General Construction5–10 milyon $9th Cycle FISP Repair. No Change to Use, Egress or Occupancy.🔒 Adres ve yükleniciler
2026-08-31Brooklyn · Bedford-Stuyvesant (West)Renewal Permit Without Changes · General Construction1–5 milyon $New elevator and elevator shaft addition with access to floors basement through 4th floor and providing compliant accessible ramp at the basement elevator lobby. Interior alteratio🔒 Adres ve yükleniciler
2026-08-31Brooklyn · Crown Heights (North)Initial Permit · General Construction10–50 milyon $PROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING TWO-STORY BUILDING, PROPOSING 9 STORY, CELLAR, AND BASEMENT MIXED USE BUILDING🔒 Adres ve yükleniciler
2026-08-31Queens · Ozone Park (North)Initial Permit · General Construction5–10 milyon $Repair of existing roofing and parapets. Masonry repairs and window replacement in the third floor courtyard.🔒 Adres ve yükleniciler
2026-08-31Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Installation of new partitions, doors, ceilings and finishes on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-31Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $Modifications to the existing HVAC system on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-31Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Filing herewith interior renovation on the 4th FL. as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-31Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Interior office renovation on 2nd floor as indicated on plans filed herewith. No change of use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-31Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $Filing for facade repairs as per plans filed herewith. No change in use occupancy or egress.🔒 Adres ve yükleniciler
2026-08-28Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction5–10 milyon $INTERIOR PARTITIONS AND CEILING MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-28Manhattan · GramercyInitial Permit · General Construction1–5 milyon $Facade repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-28Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · Structural1–5 milyon $Facade and Chimney Repair, Bulkhead reconstruction and roof replacement as per plans filed herewith. No change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-08-28Manhattan · Morningside HeightsRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Herewith filing mechanical modifications for MSM S&R AHU Replacement Project. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-28Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit with Changes · General Construction1–5 milyon $Alteration CO application as-of-right conversion of existing 2 story commercial building into a residential R-2 building with horizontal & vertical enlargement for 8 D.U.'s, 5 stor🔒 Adres ve yükleniciler
2026-08-28Queens · Middle VillageInitial Permit · Mechanical Systems1–5 milyon $HEREBY FILING RENOVATION OF EXISTING COMMERCIAL SPACES AT CELLAR, STOREFRONT, 1ST FLOOR, AND ROOF DUE TO FIRE DAMAGE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED APPLICATIONS -🔒 Adres ve yükleniciler
2026-08-28Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookRenewal Permit with Changes · General Construction1–5 milyon $Alteration CO application as-of-right conversion of existing 3 story mixed use building into a residential R-2 building with horizontal & vertical enlargement for 8 D.U.'s, 5 stori🔒 Adres ve yükleniciler
2026-08-28Staten Island · Port RichmondRenewal Permit with Changes · General Construction1–5 milyon $P.S. 019-R: Construct a connection bridge structure over the existing 1-story building to extend the corridor on the second and third floors to a new building addition. Cellar work🔒 Adres ve yükleniciler
2026-08-28Brooklyn · Brooklyn HeightsRenewal Permit with Changes · Plumbing5–10 milyon $Installation of new plumbing fixtures and systems as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-28Queens · BaysideRenewal Permit Without Changes · Plumbing1–5 milyon $PROVIDENEW GAS SERVICE AND METER WITH PRESSURE REGULATOR AT METER ROOM. RUN NEW GAS DISTRIBUTION PIPING TO THE NEW KITCHEN AND ROOF MECHANICAL EQUIPMENT. INSTALLATION OF NEW SPRINK🔒 Adres ve yükleniciler
2026-08-28Manhattan · Morningside HeightsRenewal Permit Without Changes · Structural1–5 milyon $MS - S & R MORNINGSIDE FACADE REPAIRS - GENERAL CONSTRUCTION INCLUDING FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-27Brooklyn · East Flatbush-Remsen VillageInitial Permit · General Construction10–50 milyon $Snapper 5:: Modifications of interior partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only.🔒 Adres ve yükleniciler
2026-08-27Bronx · University Heights (North)-FordhamRenewal Permit with Changes · General Construction10–50 milyon $Interior renovation and conversion of existing class I-B office building into 1968 BC class I-B community facility building located in 10 story building.🔒 Adres ve yükleniciler
2026-08-27Bronx · Throgs Neck-SchuylervilleRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Implement ventilation system improvements to ensure all spaces are ventilated. Replace outdated mechanical equipment including air handling units, return fans, exhaust fans, and ch🔒 Adres ve yükleniciler
2026-08-27Staten Island · St. George-New BrightonInitial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-27Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-08-27Manhattan · Morningside HeightsInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION/RENOVATION FOR FOR LEVEL 300 LIBRARY AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.🔒 Adres ve yükleniciler
2026-08-27Brooklyn · Sunset Park (West)Initial Permit · Mechanical Systems1–5 milyon $NYULHB - Install new 48 diameter, 316 stainless steel chimney liner within existing boiler stack to height 175'-0, including new breeching connections serving existing low pressure🔒 Adres ve yükleniciler
2026-08-27Manhattan · Financial District-Battery Park CityRenewal Permit with Changes · General Construction1–5 milyon $LMH OB 6fl: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-27Bronx · Co-op CityInitial Permit · General Construction1–5 milyon $Replace windows with new windows at existing masonry openings and associated finish work at interior. Replacement window guards.🔒 Adres ve yükleniciler
2026-08-27Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATIONS OF EXISTING CLASSROOMS AND COMPUTER LABS AS PER PLANS. MINOR PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-08-27Brooklyn · Borough ParkInitial Permit · General Construction1–5 milyon $PROPOSED HORIZONTAL EXTENSION TO AN EXISTING FOUR (4) STORY WITH MEZZANINE & CELLAR SCHOOL BUILDING.🔒 Adres ve yükleniciler
2026-08-27Manhattan · Upper West Side-Manhattan ValleyRenewal Permit Without Changes · General Construction1–5 milyon $ARCHITECTURAL SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-27Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · Standpipe1–5 milyon $Modification to existing plumbing systems and fixtures and sprinkler systems and installation of new sprinkler heads as per plans filed herewith. Installation of new standpipe. No 🔒 Adres ve yükleniciler
2026-08-26Bronx · Crotona ParkInitial Permit · Foundation1–5 milyon $THIS PROJECT WILL RECONSTRUCT A RETAINING WALL AT SOUTHERN BOULEVARD BETWEEN E 175TH STREET AND CROTONA PARK EAST IN CROTONA PARK ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,🔒 Adres ve yükleniciler
2026-08-26Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · General Construction1–5 milyon $INTERIOR ALTERATIONS TO SECOND FLOOR OFFICE SPACE FOR TENANT FIT OUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-26Brooklyn · Brooklyn HeightsRenewal Permit with Changes · Mechanical Systems1–5 milyon $Mechanical piping and ductwork installation on cellar and 1st floor to accommdote medical office fit out. Refer to plans filed herewith.🔒 Adres ve yükleniciler
2026-08-26Brooklyn · Brooklyn HeightsRenewal Permit with Changes · General Construction1–5 milyon $Interior demolition on cellar - 1st fls; new 1st floor slab; facade repair to for duct support connections; roof replacement and replacement of exterior metal stair and catwalk for🔒 Adres ve yükleniciler
2026-08-26Bronx · Hunts PointRenewal Permit Without Changes · General Construction10–50 milyon $EXCAVATION, SITE GRADING, CONSTRUCTION OF ACCESS ROADS, SIDEWALKS, CURBS. INSTALLATION OF UTILITIES, STORM, SANITARY,WATER, GAS, ELECTRICAL AND PIPE YARD.🔒 Adres ve yükleniciler
2026-08-26Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Filing herewith for Mechanical modifications as per plans. Removal and installation of HVAC unit and associated duct piping work. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-26Manhattan · East Harlem (South)Initial Permit · General Construction1–5 milyon $MOUNT SINAI HEALTH SYSTEMS - ANNENBERG 2 CARDIOLOGY OFFICES - GENERAL CONSTRUCTION MODIFICATIONS INCLUDING CHANGES TO PARTITIONS, DOORS, CEILINGS AND FLOORS AS PER PLANS FILED HERE🔒 Adres ve yükleniciler
2026-08-26Bronx · Hunts PointRenewal Permit Without Changes · General Construction10–50 milyon $The Hunts Point Wastewater Treatment Plant New Anaerobic Digester Facilities project includes excavation, site grading, construction of access roads, sidewalks, curbs, installation🔒 Adres ve yükleniciler
2026-08-26Manhattan · Lower East SideRenewal Permit Without Changes · Structural1–5 milyon $STRUCTURAL REINFORCEMENT INCONJUNCTION WITH PROPOSED 7 STORY ENLARGEMENT TO EXISTING 8 STORY BUILDING FILED UNDER ALT I APPLICATION 121205114.🔒 Adres ve yükleniciler
2026-08-26Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON FLOORS 4 AND 6 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-26Queens · East FlushingInitial Permit · Support of Excavation10–50 milyon $SOE for New school Q512🔒 Adres ve yükleniciler
2026-08-26Queens · Middle VillageInitial Permit · Plumbing1–5 milyon $Remove and replace 18 roof drains in kind. provide flashing for vent stacks. . extend 1 vents 2ft Above parapet. Pressure wash and clean all 18 roof drain leaders.🔒 Adres ve yükleniciler
2026-08-26Brooklyn · GreenpointInitial Permit · General Construction1–5 milyon $CONVERSATION OF EXISTING MANUFACTURING BUILDING TO A COMMERCIAL BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN.🔒 Adres ve yükleniciler
2026-08-26Brooklyn · Brooklyn HeightsRenewal Permit with Changes · General Construction5–10 milyon $FIT OUT: Construct new partitions and finishes to existing commercial spaces on cellar and 1st floor as per plans filed herewith. No change to zoning, use, egress, occupancy🔒 Adres ve yükleniciler
2026-08-26Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $INT RENO OF EXIST BUSINESS CLASS OCC OF 25,331 SF FT OF THE 4TH FLOOR OF THE BLDG, INSTALL OF NEW NON-LOAD BEARING PRT, CEILINGS, LIGHT FIX, AV, IT AND MECH, ELECT, PL AND FP SYSTE🔒 Adres ve yükleniciler
2026-08-26Brooklyn · Brooklyn HeightsRenewal Permit with Changes · Mechanical Systems1–5 milyon $Mechanical infrastructure to accommodate medical office space on cellar and 1st floor including new rooftop mechanical equipment, new vent piping and ductwork on the exterior facad🔒 Adres ve yükleniciler
2026-08-26Manhattan · The Battery-Governors Island-Ellis Island-Liberty IslandInitial Permit · General Construction1–5 milyon $Application filed for exterior facade repairs as shown on plans🔒 Adres ve yükleniciler
2026-08-26Brooklyn · MadisonInitial Permit · Structural1–5 milyon $K234-EXTERIOR MASONRY REPAIRS, WINDOW REPLACEMENT INCLUDING GUARDS & SHADES. INTERIOR FINISH REPAIRS.🔒 Adres ve yükleniciler
2026-08-25Manhattan · Murray Hill-Kips BayRenewal Permit with Changes · Mechanical Systems5–10 milyon $HEREWITH FILING FOR MECHANICAL MODIFICATION AS PER PLANS FOR ED EXPANSION. NO CHANGE IN USE, EGRESS OROCCUPANCY.🔒 Adres ve yükleniciler
2026-08-25Staten Island · West New Brighton-Silver Lake-Grymes HillRenewal Permit Without Changes · General Construction1–5 milyon $RUMC-BI-PLANE EP LAB-SETON & SPELLMAN WINGS - Medical Use Bldg- Proposing Interior Reno on Floor #1 for new Cardiac Cath Labs, Impatient/Outpatient Support Area,as well as Expansio🔒 Adres ve yükleniciler
2026-08-25Manhattan · Midtown-Times SquareRenewal Permit with Changes · Full Demolition10–50 milyon $Full Demolition of 23 Story Commercial Building🔒 Adres ve yükleniciler
2026-08-25Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit with Changes · Mechanical Systems1–5 milyon $ANNEX ESR: MODIFICATION TO HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATION WITHIN THE EXISTING HOSPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO UES, EGRESS OR OCCUPANCY🔒 Adres ve yükleniciler
2026-08-25Queens · Glen Oaks-Floral Park-New Hyde ParkInitial Permit · Sprinklers1–5 milyon $Northwell LIJ Sprinkler Upgrade project - Main Building: sprinkler upgrades throughout building, as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-25Manhattan · Morningside HeightsInitial Permit · General Construction1–5 milyon $Application to be reviewed with the Development HUB. Site Yard Work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-25Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $Construction work on the 6th floor (VHB office relocation) as indicated on drawings.🔒 Adres ve yükleniciler
2026-08-25Manhattan · Midtown-Times SquareInitial Permit · Plumbing1–5 milyon $Plumbing work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-08-25Manhattan · Upper East Side-Carnegie HillInitial Permit · Foundation1–5 milyon $Sidewalk Vault Repair🔒 Adres ve yükleniciler
2026-08-25Bronx · Westchester SquareRenewal Permit Without Changes · General Construction5–10 milyon $PS12X - FILING HEREWITH FOR THE LIBRARY UPGRADE OF THE SCHOOL. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE.🔒 Adres ve yükleniciler
2026-08-25Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems1–5 milyon $MODIFICATION OF HVAC SYTSEM AND INSTALLATION AC UNITS.🔒 Adres ve yükleniciler
2026-08-25Queens · Jackson HeightsInitial Permit · Earth Work50 milyon $ üzeriFOUNDATION DESIGN TO FACILITATE CONSTRUCTON OF FITNESS CENTER AS EXTENSION IN EXISTING BUILDING🔒 Adres ve yükleniciler
2026-08-24Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction1–5 milyon $REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS SHOWN ON DRAWINGS. SEE RELATED JOB NUMBERS LISTED ON PLANS :M01033942,M01033956,M01033949,M01059741🔒 Adres ve yükleniciler
2026-08-24Bronx · Hunts PointRenewal Permit with Changes · General Construction10–50 milyon $REMOVAL AND REPLACE THE EXTERIOR MASONRY FACADE AT 1ST AND 2ND FLOOR WITH INSULATED METAL PANELS. EXISTING EAST AND WEST MASONRY FACADE TO BE PAINTED WITH MINERAL BASE PAINT. NO CH🔒 Adres ve yükleniciler
2026-08-24Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Architectural changes on the 40th floor as indicated on drawings.🔒 Adres ve yükleniciler
2026-08-24Bronx · Hutchinson Metro CenterRenewal Permit with Changes · General Construction10–50 milyon $This General Construction application is filed for Phase II work amended under NB # 220243074 Doc 12 for the vertical & horizontal enlargement for addition of hotel on Tax Lot 1102🔒 Adres ve yükleniciler
2026-08-24Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-24Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work as shown on plans filed herewith.🔒 Adres ve yükleniciler
2026-08-24Staten Island · Port RichmondRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of Mechanical system for a new 4 story building🔒 Adres ve yükleniciler
2026-08-24Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction1–5 milyon $Curtain wall snap cover and masonry facade repairs as per plans. No change to use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-24Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction5–10 milyon $Interior renovation of partitions, ceilings and doors for office tenant on 10C/11M floor. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-24Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-24Bronx · Hutchinson Metro CenterRenewal Permit Without Changes · Structural1–5 milyon $Structural application filed for Phase II work amended under NB # 220243074 Doc 12 for the vertical & horizontal enlargement for addition of hotel on Tax Lot 1102. Note that Zoning🔒 Adres ve yükleniciler
2026-08-24Manhattan · Financial District-Battery Park CityRenewal Permit with Changes · General Construction50 milyon $ üzeriCONVERSION FROM OFFICE (B) OCCUPANCY TO RESIDENTIAL (R-2) OCCUPANCY PURSUANT TO ARTICLE I, CHAPTER V OF THE NYC ZONING RESOLUTION AND ARTICLE 7B OF THE NYS MULTIPLE DWELLING LAW FO🔒 Adres ve yükleniciler
2026-08-24Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit with Changes · Full Demolition1–5 milyon $full demolition of five story structure using hand held and mechanical assist from within.🔒 Adres ve yükleniciler
2026-08-24Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-24Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · Structural1–5 milyon $Structural demolition including slab openings, mechanical bulkhead, and cooling tower enclosure🔒 Adres ve yükleniciler
2026-08-24Manhattan · Tribeca-Civic CenterInitial Permit · Structural1–5 milyon $Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-24Manhattan · Manhattanville-West HarlemInitial Permit · Mechanical Systems1–5 milyon $Mechanical work for Marshak Science Tower Post-Kathabar HVAC Upgrade, work include Heating and Cooling Coil Upgrades as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-24Staten Island · New Springville-Willowbrook-Bulls Head-TravisRenewal Permit Without Changes · Mechanical Systems1–5 milyon $REPLACE NON WORKING CHILLERS AT ROOF TOP MECHANICAL PENTHOUSE, PROVIDE EMERGENCY LIGHTING THROUGHOUT AND CORRIDOR LIGHTING AT BASEMENT LEVEL🔒 Adres ve yükleniciler
2026-08-24Manhattan · Financial District-Battery Park CityRenewal Permit Without Changes · General Construction1–5 milyon $Interior build out for school as per plans filed. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-21Queens · Kew Gardens HillsInitial Permit · Structural1–5 milyon $Vertical and horiontal enlargement of existing building. Enlagement of cellar, first and second floor. Addition of attic.🔒 Adres ve yükleniciler
2026-08-21Bronx · West FarmsRenewal Permit Without Changes · General Construction1–5 milyon $INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. ROOF/BULKHEAD/PARAPET WORK. REPLACEMENT OF KITCHEN/BATHR FIXTURES. NEW LED INT/ EXT LIGHTING. MINOR M🔒 Adres ve yükleniciler
2026-08-21Staten Island · New Springville-Willowbrook-Bulls Head-TravisRenewal Permit Without Changes · Plumbing1–5 milyon $PROPOSED CIVIL PLUMBING WORK FOR ONE STORY PUMP STATION TO BE LOCATED WITHIN THE VICTORY BLVD RIGHT OF WAY NORTHWEST OF WILD AVENUE, ALL AS PER PLANS FILED HEREWITH.🔒 Adres ve yükleniciler
2026-08-21Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Repair of roof as shown on plans. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-21Queens · MaspethInitial Permit · General Construction1–5 milyon $PROPOSED 4 STORY MIXED USE BUILDING WITH EXISTING ELEMENTS TO REMAIN.🔒 Adres ve yükleniciler
2026-08-21Brooklyn · GreenpointRenewal Permit with Changes · General Construction1–5 milyon $REMOVAL OF MASONRY AND TOILET PARTITIONS; DOORS AND HARDWARE; TOILET FINISHES AND ACCESSORIES. INSTALLATION OF ELEVATOR, MASONRY, GYPSUM BOARD AND TOILET PARTITIONS; DOORS AND HARD🔒 Adres ve yükleniciler
2026-08-21Staten Island · New Springville-Willowbrook-Bulls Head-TravisInitial Permit · General Construction1–5 milyon $VERTICAL AND HORIZONTAL ENLARGEMENT OF EXISTING 1 STORY SCHOOL🔒 Adres ve yükleniciler
2026-08-21Manhattan · Financial District-Battery Park CityRenewal Permit with Changes · General Construction50 milyon $ üzeriConversion and Enlargement of Existing Commercial Building to Residential.🔒 Adres ve yükleniciler
2026-08-21Manhattan · Harlem (North)Initial Permit · General Construction5–10 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-21Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-21Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-21Manhattan · Harlem (North)Initial Permit · General Construction1–5 milyon $REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO🔒 Adres ve yükleniciler
2026-08-21Manhattan · Upper East Side-Carnegie HillInitial Permit · Mechanical Systems1–5 milyon $Mechanical work associated with the proposed renovation, as shown on plans filed herewith. No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-20Manhattan · Greenwich VillageInitial Permit · General Construction1–5 milyon $Interior renovation of the 5th floor as shown on plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-20Manhattan · GramercyRenewal Permit with Changes · General Construction1–5 milyon $Facade repair and miscellaneous exterior work related to the facade as per plans filed🔒 Adres ve yükleniciler
2026-08-20Manhattan · East Harlem (South)Renewal Permit with Changes · Plumbing1–5 milyon $Replace existing sanitary and domestic water risers to new fixtures; replace existing gas risers in kind, provide new gas connections to new kitchen stove as per plan, filed in con🔒 Adres ve yükleniciler
2026-08-20Queens · Queens VillageRenewal Permit Without Changes · General Construction1–5 milyon $Selective repairs and replacement of exterior masonry and parapets; select window replacement; select roof replacement; sheet waterproofing of foundation🔒 Adres ve yükleniciler
2026-08-20Brooklyn · Sunset Park (West)Renewal Permit Without Changes · Plumbing1–5 milyon $Provide new ejector pump and associated piping. Provide new storm water piping and connect to new site storm piping.🔒 Adres ve yükleniciler
2026-08-20Manhattan · East VillageInitial Permit · Mechanical Systems1–5 milyon $REPLACE (2) COOLING TOWERS WITH VRF HVAC SYSTEM AND ASSOCIATED DUCTWORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.🔒 Adres ve yükleniciler
2026-08-20Bronx · Castle Hill-UnionportInitial Permit · Plumbing1–5 milyon $NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES.🔒 Adres ve yükleniciler
2026-08-20Brooklyn · Gravesend (South)Renewal Permit Without Changes · General Construction1–5 milyon $NEW FOUR (4) STORY COMMUNITY FACILITY BUILDING🔒 Adres ve yükleniciler
2026-08-20Brooklyn · East WilliamsburgRenewal Permit Without Changes · General Construction5–10 milyon $CONSTRUCTION OF 8 STORY MIXED USE NEW BUILDING.🔒 Adres ve yükleniciler
2026-08-20Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · General Construction1–5 milyon $(GENERAL CATALYST 9TH FL BUILD OUT) Filing herewith architectural plans to include interior renovation and general construction work on the 9th floor. There will be no change of us🔒 Adres ve yükleniciler
2026-08-20Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work filed in conjunction with ALT1#: 123923068 (No Work) and General Construction application (GC)#: M00461800🔒 Adres ve yükleniciler
2026-08-20Brooklyn · Clinton HillRenewal Permit Without Changes · General Construction10–50 milyon $Architectural scope associated with the interior and exterior alteration of the Pratt ISC Building, change of the occupant load on the floors. No change to egress or use.🔒 Adres ve yükleniciler
2026-08-20Manhattan · Tribeca-Civic CenterInitial Permit · Structural10–50 milyon $Structural work related to facade replacement as per plans. No change to use, egress, or occupancy. Related Job numbers: M01277287, M01283766🔒 Adres ve yükleniciler
2026-08-20Manhattan · Midtown-Times SquareRenewal Permit with Changes · General Construction10–50 milyon $Remedial Facade work associated with FISP cycle 9A as per plans filed herewith. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-08-20Queens · Astoria (East)-Woodside (North)Renewal Permit with Changes · Earth Work1–5 milyon $FOUNDATION AND EARTHWORK. FILED IN CONJUNCTION WITH NB Q00696011🔒 Adres ve yükleniciler
2026-08-20Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction10–50 milyon $INTERIOR TENANT IMPROVEMENTS, WORK TO INCLUDE NEW INTERCONNECTING STAIR AND FINISHES, NON-LOADBEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCU🔒 Adres ve yükleniciler
2026-08-20Brooklyn · Sunset Park (Central)Renewal Permit with Changes · General Construction50 milyon $ üzeriPROPOSED TWNENTY NINE (29) STORY MIXED-USED DEVELOPMENT🔒 Adres ve yükleniciler
2026-08-19Brooklyn · Park SlopeRenewal Permit with Changes · General Construction1–5 milyon $EXTERIOR MASONRY REPAIRS. NO CHANGE IN USE. OCCUPANCY OR EGRESS UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-08-19Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $alterations to existing HVAC Systems as per plans filed herewith🔒 Adres ve yükleniciler
2026-08-19Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Architectural modifications taking place on 38th and 39th floors as per plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-19Queens · Astoria (Central)Renewal Permit with Changes · General Construction1–5 milyon $Alt-CO for a mixed-use building consisting of 10-unit residential Dwelling units on upper floors, along with a community facility space on 1st floor/cellar.🔒 Adres ve yükleniciler
2026-08-19Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $General construction as per plans filed herewith. No change to use, bulk, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-19Queens · Richmond HillRenewal Permit Without Changes · General Construction10–50 milyon $Renovation and enlargement of Emergency Department🔒 Adres ve yükleniciler
2026-08-19Queens · Long Island City-Hunters PointRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Herewith filing Mechanical removals for early work🔒 Adres ve yükleniciler
2026-08-19Brooklyn · Bedford-Stuyvesant (West)Initial Permit · General Construction1–5 milyon $PROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING THREE STORY BUILDING.🔒 Adres ve yükleniciler
2026-08-19Queens · JamaicaRenewal Permit Without Changes · General Construction10–50 milyon $Interior renovation of public toilets and adjoining spaces, including removal and installation of non bearing partitions, fixtures and finishes. No change is proposed to use, occup🔒 Adres ve yükleniciler
2026-08-19Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $MISCELLANEOUS FACADE AND ROOF RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-18Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Mechanical Systems5–10 milyon $Modification to mechanical systems as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-18Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Interior non-structural demolition as shown on the plans.🔒 Adres ve yükleniciler
2026-08-18Queens · Far Rockaway-BayswaterRenewal Permit with Changes · General Construction1–5 milyon $REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR🔒 Adres ve yükleniciler
2026-08-18Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $General construction work for occupied passive recreation space on roof per BB 2018-002, Part E. Passive recreation fitout includes finishes and furnishing. No change in use, egres🔒 Adres ve yükleniciler
2026-08-18Manhattan · Murray Hill-Kips BayRenewal Permit with Changes · General Construction5–10 milyon $NYU - MSB Restack Build Out - MODIFICATIONS OF PARTITIONS, CEILING, DOORS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-18Manhattan · Midtown-Times SquareInitial Permit · General Construction5–10 milyon $Hereby filing Removal and installation of non-load bearing partitions and related finishes as shown on plans filed herewith. No change to use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-18Staten Island · Todt Hill-Emerson Hill-Lighthouse Hill-Manor HeightsInitial Permit · General Construction1–5 milyon $Filing herewith renovation to existing lifeguard house, pump buildings, and changing areas as indicated on plans. No change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-08-18Bronx · Pelham Parkway-Van NestInitial Permit · General Construction1–5 milyon $MASONRY RESTORATION, PARAPET REBUILDING AT THE MAIN ROOF, ATTIC VENT INSTALLATION, AND INSTALLATION OFCOPING MOUNTED RAILINGS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS 🔒 Adres ve yükleniciler
2026-08-17Queens · Forest HillsRenewal Permit Without Changes · General Construction1–5 milyon $facade repairwork as per plans filed herewith. no change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-17Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $Propose to change use on 1st, 2nd & 2nd Mezz Levels. Increase # of persons to 306 Persons per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-17Manhattan · Washington Heights (South)Renewal Permit Without Changes · General Construction1–5 milyon $Interior alteration of existing student toilet rooms into ADA accessible toilet rooms. Scope of work include installing new ADA compliant plumbing fixtures and accessories, new doo🔒 Adres ve yükleniciler
2026-08-17Manhattan · Midtown-Times SquareInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-17Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction10–50 milyon $Interior renovation as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-17Manhattan · InwoodInitial Permit · General Construction1–5 milyon $INTERIOR AND SELECT WINDOW REPLACEMENT IN-KIND OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR SPACES AND CORRIDORS ON CELLAR & FIRST FLOOR. NO CHANGE TO EXISTING USE, OCC🔒 Adres ve yükleniciler
2026-08-17Manhattan · East VillageInitial Permit · General Construction1–5 milyon $Filing for Plaza repairs as per plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-17Brooklyn · Coney Island-Sea GateRenewal Permit with Changes · Structural1–5 milyon $Modular construction for temporary use of holding facility for NY Aquarium.🔒 Adres ve yükleniciler
2026-08-17Manhattan · Upper East Side-Carnegie HillRenewal Permit with Changes · General Construction1–5 milyon $REPAIRS TO FACADE INCLUDING REPLACEMENT OF DECORATIVE STONE ELEMENTS, PARAPETS, LINTELS AND DECORATIVE FEATURES. SEE DRAWINGS AND DETAILS HEREWITH FOR EXPLANATION OF WORK.🔒 Adres ve yükleniciler
2026-08-17Queens · Kew Gardens HillsInitial Permit · Plumbing1–5 milyon $Existing area drains on 1st floor and 2nd floor to be replaced. Underground storm piping to be replaced.🔒 Adres ve yükleniciler
2026-08-17Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $Interior demo (non-structural) & renovation of partitions, ceilings and doors for unit 7B. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-17Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillInitial Permit · General Construction1–5 milyon $FILING HEREWITH INTERIOR REMOVALS TO EXISTING SPACES ON FLOORS SUBCELLAR, CELLAR, 1, MEZZANINE, 2, 3, 4, 5, 6, 7, AND 8 AS PER PLANS IN PREPARATION FOR THE FUTURE TENANT FIT OUT. 🔒 Adres ve yükleniciler
2026-08-17Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $General construction work on entire 6th floor as per plans. No change to use. egress or occupancy.🔒 Adres ve yükleniciler
2026-08-17Queens · Far Rockaway-BayswaterRenewal Permit with Changes · General Construction1–5 milyon $REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR🔒 Adres ve yükleniciler
2026-08-17Brooklyn · Gravesend (West)Renewal Permit Without Changes · Mechanical Systems5–10 milyon $K228-REPLACE AIR INTAKE LOUVERS,ROOFTOP GRAVITY VENTILATORS & SPLIT UNIT A/C WITH NEW. INSTALL AUTOMATIC CONTROLS INCLUDING SENSORS & MOTORIZED DAMPERS.🔒 Adres ve yükleniciler
2026-08-17Manhattan · Greenwich VillageInitial Permit · General Construction1–5 milyon $Demolition work completed under application # M01385345-I1 . Work under this application consist of construction building of interior partitions as shown on plans no change to use🔒 Adres ve yükleniciler
2026-08-14Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · Mechanical Systems1–5 milyon $STORE RENOVATION (ZARA) WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-14Manhattan · Financial District-Battery Park CityInitial Permit · Plumbing1–5 milyon $MPP PROJECT-000000526. PLEASE ASSIGN TO MPP EXAMINER. Plumbing work associated with the conversion of the building.🔒 Adres ve yükleniciler
2026-08-14Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Exterior wall repairs, including: Sealant replacement; EIFS repairs and coating; balcony waterproofing; painting of steel framing.🔒 Adres ve yükleniciler
2026-08-14Brooklyn · Mapleton-Midwood (West)Initial Permit · General Construction1–5 milyon $APPLICATION FILED HEREWITH TO PARTIALY DEMOLISH EXISTING TWO (2) STORY BUILDING, MAINTAINING EXISTING FOUNDATION WALLS TO REMAIN, PROPOSE HORIZONTAL AND VERTICAL ENLARGEMENT AND OB🔒 Adres ve yükleniciler
2026-08-14Queens · Far Rockaway-BayswaterRenewal Permit with Changes · General Construction1–5 milyon $REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR🔒 Adres ve yükleniciler
2026-08-14Manhattan · SoHo-Little Italy-Hudson SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-14Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $General Construction to take place on the 46th, 47th, and 48th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as 48th, 49🔒 Adres ve yükleniciler
2026-08-13Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $REPLACE EXISTING WINDOWS WITH NEW,THERMALLY BROKEN ALUMINUM WINDOWS ON THE 3RD THRU 12TH FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-13Manhattan · East Midtown-Turtle BayInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-13Queens · ElmhurstRenewal Permit Without Changes · Sprinklers1–5 milyon $Renovation of an existing labor and delivery suite - plumbing and sprinkler filing.🔒 Adres ve yükleniciler
2026-08-13Brooklyn · Borough ParkInitial Permit · General Construction1–5 milyon $HEREWITH FILING FOR VERTICAL AND HORIZONTAL ENLARGEMENT, AND INTERIOR RENOVATION🔒 Adres ve yükleniciler
2026-08-13Manhattan · Hell's KitchenInitial Permit · Structural1–5 milyon $Structural drawings filed herewith for alteration of existing church.🔒 Adres ve yükleniciler
2026-08-13Staten Island · Tompkinsville-Stapleton-Clifton-Fox HillsRenewal Permit Without Changes · Earth Work1–5 milyon $New electrical components will be provided and new electrical equipment will be housed in a new designated electrical building. An emergency generator will also be provided.🔒 Adres ve yükleniciler
2026-08-13Queens · Richmond HillInitial Permit · General Construction1–5 milyon $Herewith filing alteration for early removals of existing scope with related separate removal applications as follows: Elevator, Fuel Tank, and Sprinkler🔒 Adres ve yükleniciler
2026-08-13Manhattan · Harlem (North)Renewal Permit Without Changes · Sprinklers5–10 milyon $THIS APPLICATION IS FILED FOR THE INSTALLATION OF NEW SPRINKLERS.🔒 Adres ve yükleniciler
2026-08-13Brooklyn · Crown Heights (South)Initial Permit · General Construction1–5 milyon $K528: Third Floor Gymnasium Upgrade including room Conversions/Partitioning.🔒 Adres ve yükleniciler
2026-08-13Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction5–10 milyon $General construction for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)🔒 Adres ve yükleniciler
2026-08-13Manhattan · Washington Heights (South)Renewal Permit Without Changes · General Construction1–5 milyon $CHNY Bed Tower floors 4, 5, and 6. Modifications to partitions and finishes to accommodate a horizontal exit for the adjacent building which is located on the same tax lot and und🔒 Adres ve yükleniciler
2026-08-13Bronx · University Heights (North)-FordhamRenewal Permit with Changes · General Construction1–5 milyon $PROPOSED THREE STORIES SCHOOL UG.3 ON TOP OF EXISTING THREE STORIES COMMERCIAL WITH A TOTAL OF SIX STORIES BUILDING🔒 Adres ve yükleniciler
2026-08-13Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Interior renovation of existing office space including partitions, doors, walls, floors, ceilings on the 25th Floor (Geico), as per plans. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-13Brooklyn · WilliamsburgRenewal Permit Without Changes · General Construction1–5 milyon $(Please assign to Central Hub.) PROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING THREE STORY BUILDING.🔒 Adres ve yükleniciler
2026-08-13Queens · Far Rockaway-BayswaterInitial Permit · General Construction1–5 milyon $Filing herewith to erect a one-story comfort station as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-13Manhattan · Tribeca-Civic CenterInitial Permit · Mechanical Systems1–5 milyon $Modification to existing Mechanical systems as per plans filed herewith; Replacement of five (5) fluid coolers on the 15th floor & Provisions for portable A/C units on the 10th Flo🔒 Adres ve yükleniciler
2026-08-13Queens · Far Rockaway-BayswaterRenewal Permit with Changes · General Construction1–5 milyon $REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR🔒 Adres ve yükleniciler
2026-08-13Queens · Far Rockaway-BayswaterRenewal Permit with Changes · General Construction1–5 milyon $REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR🔒 Adres ve yükleniciler
2026-08-13Queens · Douglaston-Little NeckRenewal Permit with Changes · General Construction1–5 milyon $FILING HEREWITH RENOVATION OF EXISTING 1ST FLOOR SPACE INTO NEW AMENITY CENTER. INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, LIGHTING WITH NEW FINISHES AND WALL PROTECTION.🔒 Adres ve yükleniciler
2026-08-13Manhattan · Hamilton Heights-Sugar HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $PROPOSED RECONSTRUCTION OF THE EXISTING HVAC SYSTEM LOCATED AT JACKIE ROBINSON RECREATION CENTER. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-12Staten Island · Todt Hill-Emerson Hill-Lighthouse Hill-Manor HeightsInitial Permit · General Construction1–5 milyon $Interior alteration of approx. 15332 sq.ft. of the existing Seaview Administration building to construct a new non-profit institution with sleeping accommodations occupancy class I🔒 Adres ve yükleniciler
2026-08-12Queens · BaysideInitial Permit · General Construction1–5 milyon $ALTCO FILED FOR AN ENLARGEMENT OF THE 4TH FLOOR WEST WING PORTION OF THIS HOSPITAL AS PER PLANS FILED HEREWITH.🔒 Adres ve yükleniciler
2026-08-12Brooklyn · Prospect ParkInitial Permit · General Construction5–10 milyon $Interior Renovation of 3rd floor and mez.3 associated with the GC scope. No change in use, egress, or occupancy under this application.🔒 Adres ve yükleniciler
2026-08-12Manhattan · Upper East Side-YorkvilleInitial Permit · Mechanical Systems1–5 milyon $INSTALL NEW HVAC UNITS, DUCTWOR, EXHAUST FANS, AND RELATED DUCTWORK.🔒 Adres ve yükleniciler
2026-08-12Manhattan · Washington Heights (North)Initial Permit · General Construction1–5 milyon $Room 318: Remove existing since lab and associated equipment / finishes; Replace finishes and move college office furniture to this room.🔒 Adres ve yükleniciler
2026-08-12Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction1–5 milyon $General construction alterations on the 1st thru 4th floors and roof level for proposed full building renovation and tenant fit-tout; related work as per plans. No proposed change 🔒 Adres ve yükleniciler
2026-08-12Manhattan · East Harlem (South)Initial Permit · General Construction1–5 milyon $HEREWITH FILING FOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILINGS INCLUDING THE REMOVAL EXISTING EXTERIOR CLADDING ONLY AS PER PLANS.🔒 Adres ve yükleniciler
2026-08-12Manhattan · Chelsea-Hudson YardsRenewal Permit Without Changes · General Construction1–5 milyon $General construction alterations on the 1st thru 4th floors for proposed change of use/occupancy; related work as per plans.🔒 Adres ve yükleniciler
2026-08-12Manhattan · GramercyRenewal Permit Without Changes · General Construction1–5 milyon $NYU Medical Center -HJD Loading Dock - MODIFICATIONS OF PARTITIONS, DOORS, CEILING AND FLOOR ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-12Brooklyn · Sunset Park (West)Initial Permit · General Construction1–5 milyon $Interior removals of partitions, ceilings, light fixtures, interior mechanical equipment and ductwork, plumbing fixtures (LAA).🔒 Adres ve yükleniciler
2026-08-12Bronx · Riverdale-Spuyten DuyvilInitial Permit · General Construction1–5 milyon $DEMOLITION OF EXISTING STAIRCASE, CONSTRUCTION OF NEWSTAIRCASE TO INCLUDE STONE VENEER CONCRETE RETAINING WALLS, GRANITECAPSTONES, GRANITE STAIR TREADS ON CONCRETE FOUNDATIONS.PLAN🔒 Adres ve yükleniciler
2026-08-12Manhattan · Washington Heights (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $HVAC modifications to accommodate interior alterations on partial floors 4, 5 and 6 in the existing CHNY hospital building as per plans filed herewith only. Connect to the existin🔒 Adres ve yükleniciler
2026-08-12Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $GENERAL CONSTRUCTION TAKING PLACE ON CELLAR & 1ST FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-12Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · General Construction1–5 milyon $NONSTRUCTURAL INTERIOR DEMOLITION ON FLOORS CELLAR TO 05. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-12Bronx · Pelham Bay-Country Club-City IslandInitial Permit · Support of Excavation1–5 milyon $SOE work in conjunction with NB application🔒 Adres ve yükleniciler
2026-08-12Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-08-12Queens · Long Island City-Hunters PointInitial Permit · Structural1–5 milyon $FILING HEREWITH STRUCTURAL WORK ON THE BASEMENT, 1ST THROUGH 9TH FLOOR AND ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-11Manhattan · Upper East Side-Carnegie HillInitial Permit · General Construction1–5 milyon $STRUCTURAL WORK INCLUDING PARTIAL STRUCTURAL DEMOLITION OF 5 STORY BUILDING. FOUNDATION AND STRUCTURAL WORK INCLUDING STEEL AND CONCRETE WORK FOR PROPOSED 4 STORY BUILDING IN CONJU🔒 Adres ve yükleniciler
2026-08-11Bronx · Kingsbridge-Marble HillInitial Permit · Structural1–5 milyon $Retaining wall repairs as per plans filed herewith. No change in use, occupancy or egress.🔒 Adres ve yükleniciler
2026-08-11Brooklyn · Brooklyn HeightsRenewal Permit with Changes · Structural5–10 milyon $General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanic🔒 Adres ve yükleniciler
2026-08-11Bronx · Pelham Bay ParkRenewal Permit with Changes · General Construction5–10 milyon $Job to be assigned to development hub as per our HUB consultation. Filing herewith for 1 story Ammunition building as per plans filed herewith.🔒 Adres ve yükleniciler
2026-08-11Brooklyn · Prospect HeightsInitial Permit · Mechanical Systems1–5 milyon $RENOVATION OF AN EXISTING THREE-STORY WITH BASEMENT AND CELLAR MASONRY ROW-HOUSE, INCLUDING ARCHITECTURAL, MECHANICAL, PLUMBING, SPRINKLER AND STRUCTURAL🔒 Adres ve yükleniciler
2026-08-11Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Filing herewith facade work, cladding replacement at existing Citi Bank. No building structure work. No change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-08-11Manhattan · Murray Hill-Kips BayRenewal Permit Without Changes · General Construction1–5 milyon $RENOVATION OF EXISTING PLAZA TO INCLUDE REPLACEMENT OF PAVING, THE REPLACEMENT AND ADDITION OF LIGHTING, PLANTERS, AND STAIRS, AS WELL AS THE ADDITION OF RAMPS TO COMPLY WITH ADA R🔒 Adres ve yükleniciler
2026-08-11Manhattan · Upper East Side-Carnegie HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Install HVAC units and components for Chase Bank. No changes to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-11Manhattan · East VillageInitial Permit · General Construction1–5 milyon $General construction for Xantium Investments on 12th floor🔒 Adres ve yükleniciler
2026-08-11Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-11Manhattan · East Harlem (North)Initial Permit · General Construction1–5 milyon $Modification of existing storefront facade to include new glazing, construction of new tenant layout, new doors and partitions to accommodate layout for Planet Fitness fitout. No 🔒 Adres ve yükleniciler
2026-08-11Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction10–50 milyon $Removal/installation of interior non-bearing partitions & related finishes. No change in use, egress or occupancy🔒 Adres ve yükleniciler
2026-08-11Manhattan · Midtown South-Flatiron-Union SquareRenewal Permit Without Changes · General Construction1–5 milyon $Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-11Queens · Astoria (Central)Initial Permit · Mechanical Systems1–5 milyon $Mount Sinai - Mechanical modifications related to the new Intensive care unit as per plans filed herewith. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-10Queens · Fresh Meadows-UtopiaRenewal Permit with Changes · Mechanical Systems1–5 milyon $PROPOSED TWO STORY + CELLAR (1) FAMILY HOUSE AS PER DRAWING HEREWITH FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-10Manhattan · East Harlem (South)Initial Permit · General Construction1–5 milyon $GC: Exterior Renovation and Interior Repair Work. ST: Construction of Masonry Infill Wall. No change in Use, Occupancy, or Egress.🔒 Adres ve yükleniciler
2026-08-10Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · General Construction1–5 milyon $REPLACEMENT OF WINDOWS INCLUDING BLOCKING, SHADES & GUARDS. PLASTER & PAINTING REPAIRS. REMOVAL AND REBUILDING OF WINDOW SILL AT AREAWAY. MASONRY REPAIRS. NO CHANGE TO EGRESS, OCCU🔒 Adres ve yükleniciler
2026-08-10Queens · JamaicaRenewal Permit Without Changes · Plumbing1–5 milyon $P.S. 95-Q: UNDERGROUND PLUMBING WORK TYPE FOR A NEW SCHOOL BUILDING.🔒 Adres ve yükleniciler
2026-08-10Brooklyn · WilliamsburgInitial Permit · Construction Fence1–5 milyon $Installation of 8' temporary construction fence🔒 Adres ve yükleniciler
2026-08-10Brooklyn · BrownsvilleInitial Permit · General Construction1–5 milyon $K833 Temporary Classroom Units installation.🔒 Adres ve yükleniciler
2026-08-10Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $Select facade repairs on all elevations and roof as indicated on drawings.🔒 Adres ve yükleniciler
2026-08-10Staten Island · New Springville-Willowbrook-Bulls Head-TravisInitial Permit · General Construction1–5 milyon $Tenant build out partial 8th floor to accommodate NORTHWELL HEALTH OUTPATIENT FACILITY.🔒 Adres ve yükleniciler
2026-08-10Manhattan · Midtown-Times SquareRenewal Permit Without Changes · General Construction1–5 milyon $General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-10Queens · Far Rockaway-BayswaterInitial Permit · General Construction10–50 milyon $New Building for Brunswick Shelter for Adult Families (UG# 5 Transient Hotel, 3-story with cellar). Development HUB Consultation Accepted on April 8, 2022.🔒 Adres ve yükleniciler
2026-08-10Brooklyn · Fort GreeneInitial Permit · Mechanical Systems1–5 milyon $REPLACEMENT OF EXHAUST FANS, H&V UNITS, RADIATORS VALVES, AND LOBBY HEATING SYSTEM AS SHOWN ON PLANS🔒 Adres ve yükleniciler
2026-08-10Brooklyn · Bushwick (West)Initial Permit · General Construction1–5 milyon $Interior renovation of retail space in the cellar, 1st fl, & Roof, including tenant improvement, interior metal stud framing, interior finishes, and interior partitions. Related St🔒 Adres ve yükleniciler
2026-08-10Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit with Changes · Structural10–50 milyon $SWARMP REPAIR AT GREENBERG PAVILION FACADE, CEILING ABOVE FDR DRIVE, 1ST FL AND PARKING LEVEL INCLUDING REPAIR STEEL DECKING AND CONCRETE, AND PRECAST STONE FACADE AS INDICATED ON 🔒 Adres ve yükleniciler
2026-08-10Bronx · Pelham Parkway-Van NestInitial Permit · Mechanical Systems1–5 milyon $MECHANICAL WORRK AS PER PLANS FILED HEREWITH. WORK INCLUDES MECHANICAL DUCT MODIFICATIONS, DAMPERS, AND OTHER WORK IN CONJUNCTIONWITH RENOVATIONS. NO CHANGE TO USE, EGRESS, OR OCCU🔒 Adres ve yükleniciler
2026-08-10Queens · CoronaInitial Permit · General Construction1–5 milyon $Q061_ Conversion of existing rooms on the second floor into additional classrooms as part of the Class Reduction Program. No change in use, egress, or occupancy is proposed under t🔒 Adres ve yükleniciler
2026-08-10Manhattan · Midtown-Times SquareRenewal Permit with Changes · General Construction1–5 milyon $RENOVATION AND VERTICAL ENLARGEMENT OF EXISTING OFFICE BUILDING TO SELF SERVICE STORAGE FACILITY. APP FILED IN CONJ W/M01004304-I1 (FO), M01003551-S1 (ST), M01003551-S2 (MS), M0100🔒 Adres ve yükleniciler
2026-08-10Brooklyn · Borough ParkInitial Permit · Structural1–5 milyon $INSTALLATION OF INFILL SLABS AT THE 2ND FL & ROOF LEVEL, INSTALLATION OF NEW DUNNAGE & BULKHEAD SUPPORT AT ROOF LEVEL, INSTALLATION OF NEW STEEL BEAMS TO SUPPORT A REVISED SLAB PER🔒 Adres ve yükleniciler
2026-08-07Manhattan · Midtown-Times SquareRenewal Permit Without Changes · Sprinklers1–5 milyon $Modification to existing Plumbing fixtures, Sprinkler System, and Standpipe system as per plans filed herewith; No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-07Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $INTERIOR RENOVATION OF 2ND-7TH FLOOR AT EXISTING HOTEL:REPLACE CARPETS IN HALLWAY, REPLACE TILE FRONT OF ELEVATOR AREA, REPLACE CARPETS IN ROOMS TO VINYL FLOOR. AND WALL PANEL, REP🔒 Adres ve yükleniciler
2026-08-07Manhattan · Financial District-Battery Park CityInitial Permit · General Construction1–5 milyon $Interior renovation of existing office space at floors 17, 18, and 19 as per plans filed. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-07Brooklyn · Gravesend (West)Initial Permit · General Construction5–10 milyon $Vertical extension to existing educational building.🔒 Adres ve yükleniciler
2026-08-07Brooklyn · WilliamsburgRenewal Permit Without Changes · General Construction1–5 milyon $FILING HEREWITH FOR RENOVATIONS CHANGE OF USE AND OCCUPANCY FROM OFFICE AND VETERINARIAN CLINIC UG6 TO ART STUDIOS UG9A, AND PENTHOUSE ADDITION TO COMMERCIAL BUILDING INCLUDING NEW🔒 Adres ve yükleniciler
2026-08-07Queens · Queensbridge-Ravenswood-Dutch KillsRenewal Permit Without Changes · General Construction1–5 milyon $STRUCTURAL WORK WILL BE PERFORMED ON THE EXISTING FIREHOUSE. A NEW FLOOR SLAB WILL BE REMOVED AND INSTALLED ON A PORTION OF THE FIRST FLOOR AND CELLAR AS PLANS. NO CHANGE OF USE OR🔒 Adres ve yükleniciler
2026-08-07Staten Island · Great Kills-EltingvilleRenewal Permit Without Changes · General Construction1–5 milyon $This application is for the Rehabilitation of the Existing Richmond Ave Pumping Station Pump Building which consists of site civil, system hydraulics, structural/architectural, mec🔒 Adres ve yükleniciler
2026-08-07Queens · Long Island City-Hunters PointInitial Permit · General Construction1–5 milyon $FILING HEREWITH RENOVATION ON THE BSMT, 1 THRU 9TH FLOOR , ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-07Queens · ElmhurstRenewal Permit Without Changes · General Construction5–10 milyon $NEW 5-STORY FIRE STATION BUILDING WITH CELLAR AS PER PLANS FILED HEREWITH. HUB CONSULTATION ACCEPTED ON 8/31.🔒 Adres ve yükleniciler
2026-08-07Manhattan · Murray Hill-Kips BayInitial Permit · Structural1–5 milyon $Structural modifications taking place on the 1-2nd floors, 2nd floor Mezzanine and roof as indicated on the drawings.🔒 Adres ve yükleniciler
2026-08-07Queens · HollisRenewal Permit Without Changes · General Construction1–5 milyon $HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING BUILDING FOR PROPOSED DAY CARE CENTER.🔒 Adres ve yükleniciler
2026-08-07Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction5–10 milyon $Interior tenant fit-out and related finishes as per plans.🔒 Adres ve yükleniciler
2026-08-07Manhattan · East Harlem (South)Initial Permit · Mechanical Systems1–5 milyon $MS - GP6 - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-07Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · Mechanical Systems1–5 milyon $HVAC modifications and associated ductwork for tenant fit-out as per plans.🔒 Adres ve yükleniciler
2026-08-06Brooklyn · Downtown Brooklyn-DUMBO-Boerum HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $REMOVE/INSTALL MS EQUIPMENT, DUCTWORK, PIPING + CTRLS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-06Brooklyn · GreenpointInitial Permit · General Construction1–5 milyon $APPLICATION FILED HEREWITH FOR VERTICAL & HORIZONTAL ADDITION AND INTERIOR RENOVATIONS TO EXISTING ONE STORY AND CELLAR BRICK BUILDING.🔒 Adres ve yükleniciler
2026-08-06Queens · Long Island City-Hunters PointRenewal Permit Without Changes · General Construction5–10 milyon $6-STORY NEW BUILDING.🔒 Adres ve yükleniciler
2026-08-06Queens · Kew Gardens HillsInitial Permit · Earth Work1–5 milyon $civil work at Razran hall, earth and excavation work as per plans🔒 Adres ve yükleniciler
2026-08-06Brooklyn · Gravesend (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $K358 : Installation of the Mechanical System with Heating System, Ventilation System, Air Conditioning System. No Change in Use, Egress or Occupancy.🔒 Adres ve yükleniciler
2026-08-06Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Facade repairs and maintenance as per plans filed herewith. No change to use, bulk, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-06Manhattan · Chelsea-Hudson YardsInitial Permit · Structural1–5 milyon $STRUCTURAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-06Manhattan · Harlem (North)Renewal Permit Without Changes · General Construction1–5 milyon $REHABILITATION OF EXISTING SCHOOL TO PROVIDE ACCESS TO THE HANDICAPPED. PROVISION OF NEW ELEVATOR, RAMPS, WHEELCHAIR LIFT AND ACCESSIBLE TOILETS. PROVISION OF HOLDING ROOMS.🔒 Adres ve yükleniciler
2026-08-06Queens · Kew Gardens HillsRenewal Permit Without Changes · General Construction1–5 milyon $Queens College, Rufus King Hall Removal & replacement of existing windows with new windows (221) & AC brackets (46). Repairs of masonry at window sill. Repairs of cracked/spalled 🔒 Adres ve yükleniciler
2026-08-06Manhattan · Manhattanville-West HarlemRenewal Permit Without Changes · Mechanical Systems1–5 milyon $The Mechanical work shall comply with MC 107, MC 1202 materials, MC 1203 Joints, MC 1204 insulation, MC 1205 valves, MC 1206 installation, and MC 1208 testing.🔒 Adres ve yükleniciler
2026-08-06Manhattan · Chinatown-Two BridgesRenewal Permit Without Changes · General Construction1–5 milyon $Main roof & 12th floor Terraces roof restorations work including remove existing and install new roof system & railings. All work as per plans submitted. No change in use, occupa🔒 Adres ve yükleniciler
2026-08-05Queens · Kew Gardens HillsRenewal Permit Without Changes · General Construction1–5 milyon $Queens College, Delany Hall, Replacement/Recoating/Repairs of existing damaged wood framing, stucco & membrane roofing system, exterior windows, entrance concrete stair, brick maso🔒 Adres ve yükleniciler
2026-08-05Manhattan · Manhattanville-West HarlemRenewal Permit Without Changes · General Construction1–5 milyon $Full removal of the detached temporary classroom building including all electrical, mechanical, fire alarm and restoration of the play yard. Limited building alteration scope of w🔒 Adres ve yükleniciler
2026-08-05Queens · Richmond HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Mechanical work associated with the replacement of 3 Existing boilers , new Breeching, Dampers, chemical feeds , Steam valves and traps, new exhaust fans,1 new Split A/C unit. new 🔒 Adres ve yükleniciler
2026-08-05Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems1–5 milyon $Modification to HVAC systems on 44th FL (64M). No change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-08-05Brooklyn · East WilliamsburgRenewal Permit Without Changes · General Construction1–5 milyon $FILED HEREIN VERITICAL AND HORIZONTAL EXTENSION ON EXISTING 3 STORY + CELLAR BUILDING (MIXED USE, STORE + 2 DWELLINGS); PROPOSED CONVERSION TO 4 STORY + CELLAR BUILDING, RESIDENTIA🔒 Adres ve yükleniciler
2026-08-05Manhattan · SoHo-Little Italy-Hudson SquareInitial Permit · General Construction1–5 milyon $general construction on 7th floor as per plans filed herewith. no changes in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-05Brooklyn · Bushwick (West)Initial Permit · General Construction1–5 milyon $Exterior facade and roof restoration as indicated on drawings.🔒 Adres ve yükleniciler
2026-08-05Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red HookInitial Permit · Earth Work1–5 milyon $Reso A playground upgrade. New work will include new playground, basketball court, storm drainage system, turf field, landscape areas, track, and kickball field.🔒 Adres ve yükleniciler
2026-08-05Brooklyn · East WilliamsburgInitial Permit · General Construction1–5 milyon $ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORYPROPOSED 4 STORY + CELLAR +PH MIXED USE BUILDING. PROPOSED 8 DWELLING UNITS🔒 Adres ve yükleniciler
2026-08-05Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION MODIFICATIONS ON THE 6th FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-05Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $Convert existing office building into art gallery. Work includes general construction and installation of new egress stairs. Building will be occupied by a single tenant. GC demo🔒 Adres ve yükleniciler
2026-08-05Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. FILED IN CONJUCTION WITH NEW BUILDING APPLICATION 121209192. MPP 47.🔒 Adres ve yükleniciler
2026-08-05Manhattan · Harlem (North)Initial Permit · Structural1–5 milyon $EMERGENCY CONCRETE REPAIRS TO THE INTERIOR OF AN EXISTING BUILDING IN THE CELLAR, PIPE ACCESS SPACE, COAL BUNKER, PUMP ROOM AND BOILER ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-05Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $UBIQUANT-- General construction for office remodel as per plans filed. No change to use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-05Manhattan · Washington Heights (South)Renewal Permit Without Changes · General Construction1–5 milyon $HH 02 CATH LABS & HYBRID OR: MODIFICATION OF INTERIOR PARTITIONS AND FINSIHES TO ACCOMMODATE THE CATH LAB AND HYBRID ORS RENOVATION WITHIN THE EXISITNG HOSPITAL BUILDING AS PER PL🔒 Adres ve yükleniciler
2026-08-04Brooklyn · Sunset Park (West)Initial Permit · Mechanical Systems1–5 milyon $NYULH BROOKLYN - 3500 ONCOLOGY BEDS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Chelsea-Hudson YardsInitial Permit · Standpipe1–5 milyon $Modification to existing plumbing,sprinkler and standpipe systems on 44th (64th M) floor. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Chelsea-Hudson YardsInitial Permit · Standpipe1–5 milyon $Modification to existing plumbing,sprinkler and standpipe systems.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Manhattanville-West HarlemRenewal Permit Without Changes · General Construction1–5 milyon $Proposed interior renovation of North Academic Center on the first floor. Work includes but not limited to ..... No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-04Brooklyn · Sunset Park (West)Initial Permit · Mechanical Systems1–5 milyon $PROVIDE NEW EXHAUST FANS TO ACCOMMODATE NEW & UPGRADED TOILETS, INSTALL NEW OR MODIFY EXISTING DUCTWORK, MODIFY & REPLACE SUPPLY DUCTWORK DISTRUBUTION & FIN TUBE CONVECTORS, PROVID🔒 Adres ve yükleniciler
2026-08-04Manhattan · Midtown-Times SquareInitial Permit · General Construction1–5 milyon $proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy🔒 Adres ve yükleniciler
2026-08-04Manhattan · Tribeca-Civic CenterInitial Permit · General Construction50 milyon $ üzeriRemoval of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily a🔒 Adres ve yükleniciler
2026-08-04Manhattan · Upper West Side-Lincoln SquareInitial Permit · General Construction1–5 milyon $Installation of new finish flooring at first floor and mezzanine as shown on drawings. No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-04Brooklyn · Crown Heights (North)Renewal Permit with Changes · General Construction1–5 milyon $PROPOSED CHANGE OF USE OF EXISTING U.G. III SCHOOL TO U.G. II RESIDENCES BY UTILIZING ART. I CHAPTER 5 OF NYC ZONING RESOLUTION AND A VERTICALLY ENLARGEMENT. PROPOSED 27 CONVERTED 🔒 Adres ve yükleniciler
2026-08-04Staten Island · New Springville-Willowbrook-Bulls Head-TravisRenewal Permit Without Changes · Structural1–5 milyon $Structural work proposed for one story Pump Station to be located within the Victory Blvd. right of way Northwest of Wild Avenue, at new address 4465 Victory Blvd.All as per plans 🔒 Adres ve yükleniciler
2026-08-04Manhattan · Hell's KitchenRenewal Permit Without Changes · General Construction1–5 milyon $FILING TO REPLACE EXG FILL PORT SPILL CTNR OF (2) 3,000-GAL GAS, (1) 3,000-GAL RENEW DL, (1) 2,000-GAL MOT OIL, (1) 2,000-GAL HYD OIL USTS, EXG TANK TOP SUMPS OF (2) 3,000-GAL GAS,🔒 Adres ve yükleniciler
2026-08-04Manhattan · Stuyvesant Town-Peter Cooper VillageInitial Permit · Mechanical Systems1–5 milyon $Removal + installation existing HVAC rooftop units, ductwork + assoc diffusers, exhaust fans + existing louvers. new ERV unit w/assoc supply + exhaust ductwork, power + control w🔒 Adres ve yükleniciler
2026-08-04Queens · Bay Terrace-ClearviewInitial Permit · Mechanical Systems10–50 milyon $Q169-NEW HEAT PUMP, OUTDOOR AIR SYSTEM, SPLIT UNIT, FANS & ASSOCIATED DUCTS & PIPING.🔒 Adres ve yükleniciler
2026-08-04Brooklyn · Prospect HeightsInitial Permit · Structural1–5 milyon $Facade repairs as per plans. No change in use, egress or occupancy under this application.🔒 Adres ve yükleniciler
2026-08-04Queens · Long Island City-Hunters PointInitial Permit · Plumbing1–5 milyon $NEW DOMESTIC WATER BOOSTER PUMP IN BSMT, 1 RPZ ON 9TH FLR, 3 WASH STATIONS IN BSMT, 16 FLR DRAINS IN BSMT, 2 SEWER EJECTORS IN SUB BSMT, 3 FLR DRAINS ON 9TH FLR, 1 FLOOR DRAIN ON 7🔒 Adres ve yükleniciler
2026-08-04Staten Island · Tottenville-CharlestonRenewal Permit Without Changes · General Construction1–5 milyon $PROPOSED TWO STORY ADDITION TO EXISTING 1 STORY BUILDING.🔒 Adres ve yükleniciler
2026-08-04Manhattan · GramercyInitial Permit · General Construction1–5 milyon $Interior renovation to include demolition of existing and construction of new partitions. no change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Financial District-Battery Park CityInitial Permit · Mechanical Systems1–5 milyon $Mechanical work associated with the conversion of the building.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems1–5 milyon $Modification to HVAC systems on 41st Fl (61 M). No change to use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-04Queens · Richmond HillRenewal Permit Without Changes · Mechanical Systems1–5 milyon $Installation of new 2.5MW emergency diesel generator.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction5–10 milyon $REMOVAL & RENOVATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 43RD FL (63M). NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Greenwich VillageRenewal Permit Without Changes · General Construction1–5 milyon $South and east facades, and southwest corner return restoration, including repairs and replacement of terra cotta and brick masonry units, and repairs of wood windows, as per drawi🔒 Adres ve yükleniciler
2026-08-04Staten Island · Oakwood-RichmondtownRenewal Permit Without Changes · General Construction1–5 milyon $REPLACEMENT OF HVAC AND ELECTRICAL EQUIPMENT AND ARCHITECTURAL UPGRADES TO EXISTING MAINTENANCE BUILDING ALONG WITH STRUCTURAL CONCRETE EQUIPMENT PADS IN EXISTING MAINTENANCE BUILD🔒 Adres ve yükleniciler
2026-08-04Staten Island · Oakwood-RichmondtownRenewal Permit Without Changes · General Construction50 milyon $ üzeriREPURPOSE EXISTING AIR PLENUMN INTO NEW ELEC ROOM; INSTALL NEW DIRECT-BURIED ELECTRICAL CABLES & CMU VESTIBULES; REPLACE HVAC & ELECTRICAL EQUIP & ROOFING MEMBRANE, ARCH UPGRADES, 🔒 Adres ve yükleniciler
2026-08-04Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction5–10 milyon $REMOVAL & RENOVATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS ON 41ST FLOOR (61ST M). NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-04Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems1–5 milyon $Removal of existing gas-fired rooftop units, split systems, exhaust fans, indoor gas fired unit heaters, and gas fired boiler and domestic water heater and associated gas piping. I🔒 Adres ve yükleniciler
2026-08-04Manhattan · Midtown South-Flatiron-Union SquareInitial Permit · General Construction1–5 milyon $GENERAL CONSTRUCTION MODIFICATIONS ON THE 6th th FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-03Queens · Long Island City-Hunters PointInitial Permit · General Construction1–5 milyon $Project scope is abatement and removal of existing windows and masonry infill at 5th floor and 6th floor.🔒 Adres ve yükleniciler
2026-08-03Manhattan · Hamilton Heights-Sugar HillInitial Permit · General Construction1–5 milyon $FILING HEREWITH MODERATE REHABILITATION OF AN EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS, OROCCUPANCY IS PROPOSED UNDER THIS APPLICATION.🔒 Adres ve yükleniciler
2026-08-03Brooklyn · BrownsvilleRenewal Permit Without Changes · General Construction1–5 milyon $Facade restoration at Howard House #4 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy.🔒 Adres ve yükleniciler
2026-08-03Manhattan · East Midtown-Turtle BayRenewal Permit Without Changes · General Construction1–5 milyon $PAA filed to correct floor from SC to SC1. No change to plans.🔒 Adres ve yükleniciler
2026-08-03Staten Island · Port RichmondRenewal Permit Without Changes · General Construction10–50 milyon $PR-138 PORT RICHMOND WRRF HEADWORKS IMPROVEMENTS PROJECT INCLUDES REPLACEMENT OF MECHANICAL EQUIPMENT, CONSTRUCTION OF NEW INTERIOR ELECTRICAL ROOM, INSTALLATION OF PRESSURIZED VES🔒 Adres ve yükleniciler
2026-08-03Brooklyn · BrownsvilleInitial Permit · General Construction1–5 milyon $The scope of work includes but is not limited to replacing existing metal stairs outside the mechanical room, and concrete and brick repair.🔒 Adres ve yükleniciler
2026-08-03Manhattan · Tribeca-Civic CenterInitial Permit · General Construction1–5 milyon $Interior tenant fit out for Chase Bank.🔒 Adres ve yükleniciler
2026-08-03Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems5–10 milyon $Modification to HVAC systems on 40th & 42nd Floors (60 & 62 M). No change in use egress or occupancy.🔒 Adres ve yükleniciler
2026-08-03Manhattan · Chelsea-Hudson YardsRenewal Permit with Changes · General Construction10–50 milyon $EXISTING 13 STORY BRICK FACADE BUILDING, CHANGE OF USE FROM OFFICE TO RESIDENTIAL FOR FLOORS 4-13 AND SOUTH ENVELOPE MODIFICATION. ALL LIFE SAFETY SYSTEMS TO BE MAINTAINED PER COD🔒 Adres ve yükleniciler
2026-08-03Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction5–10 milyon $REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 44TH FL (64 M). NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-03Brooklyn · Prospect Lefferts Gardens-WingateInitial Permit · General Construction10–50 milyon $NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL2) - FILING FOR A NEW BUILDING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW BUILDINGS🔒 Adres ve yükleniciler
2026-08-03Brooklyn · Sunset Park (East)-Borough Park (West)Initial Permit · General Construction1–5 milyon $PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT ON A 2 STORY BUILDING. OBTAIN NEW C OF O.🔒 Adres ve yükleniciler
2026-08-03Manhattan · East Harlem (South)Renewal Permit Without Changes · General Construction1–5 milyon $Application filed for interior partitions in Penthouse A as per drawings filed herewith. No change to use, egress or occupancy as a part of this application.🔒 Adres ve yükleniciler
2026-08-03Bronx · Concourse-Concourse VillageRenewal Permit Without Changes · Structural1–5 milyon $Structural framing and foundation work for museum tenant fit out filed in conjunction with HUB NB #210179929. (Hub consultation 9/5/24. S Pavan Ok to assign to S Linehan examiner)🔒 Adres ve yükleniciler
2026-08-03Brooklyn · BrownsvilleRenewal Permit Without Changes · General Construction1–5 milyon $Roofing Replacement and Roof Structure Renovation🔒 Adres ve yükleniciler
2026-08-03Bronx · Concourse-Concourse VillageRenewal Permit Without Changes · General Construction10–50 milyon $Replacement of Elevators & Assoc. Equip. in EMR.(16) General Passenger Elevators Cars, (2) Judges Elevators w/ card access, (1) Person in custody elevator w/ security camera, (1) F🔒 Adres ve yükleniciler
2026-08-03Manhattan · Chelsea-Hudson YardsInitial Permit · General Construction10–50 milyon $REMOVAL & RENOVATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 40TH AND 42ND FLOORS (60TH & 62ND M). NO CHANGE IN USE, EGRESS OR OCCUPANCY.🔒 Adres ve yükleniciler
2026-08-03Queens · Richmond HillInitial Permit · Mechanical Systems1–5 milyon $Removal & installation of mechanical unit and associated duct, & piping related to Electrification/Heat pump systems and Electrical service upgrade at Q273🔒 Adres ve yükleniciler
2026-08-03Bronx · Kingsbridge-Marble HillInitial Permit · General Construction1–5 milyon $Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing . No change in use, egres🔒 Adres ve yükleniciler
2026-08-03Manhattan · Washington Heights (South)Renewal Permit Without Changes · Mechanical Systems1–5 milyon $HH 02 CATH LABS & HYBRID OR: MODIFICATION OF HVAC DUCTWORK, PIPING AND EQUIPMENT TO ACCOMMODATE THE CATH LAB AND HYBRID ORS RENOVATION WITHIN THE EXISITNG HOSPITAL BUILDING AS PER🔒 Adres ve yükleniciler
2026-08-03Manhattan · Chelsea-Hudson YardsInitial Permit · Mechanical Systems1–5 milyon $Modification to HVAC systems on 43rd Fl (63 M). No change in use, egress or occupancy.🔒 Adres ve yükleniciler
2026-08-03Manhattan · Upper East Side-Lenox Hill-Roosevelt IslandRenewal Permit with Changes · General Construction1–5 milyon $Facade repairs. No change in egress, use or occupancy.🔒 Adres ve yükleniciler

Kaynak: NYC Department of Buildings, NYC Open Data (NYC Open Data Law kapsamında yayımlanır). New York Belediyesi tarafından onaylanmamıştır. Terms of use