Large non-residential building permits: New York City
1180 permits issued in the last 90 days with a reported cost of $1M or more (new construction, major alteration, demolition). Updated: 2026-10-30.
Dataset: https://data.cityofnewyork.us/Housing-Development/DOB-NOW-Build-Approved-Permits/rbx6-tga4
🔒 Street address, exact cost, contractor and owner names are shown to members only.
| Issued | Area | Work type | Reported cost | Description (official) | Members |
|---|---|---|---|---|---|
| 2026-10-28 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $50M+ | Interior work includes the installation of acoustical window inserts at courtyard-facing rooms. No change to occupancy or use. Structural application number M01369356-I1. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Hereby filing demolition of the space including all furnishings, finishes, interior framing and abandoned fit-out services. as shown on plans filed herewith. No change to use, occu | 🔒 Address & contractors |
| 2026-10-28 | Brooklyn · Greenpoint | Initial Permit · General Construction | $1M–5M | LOADING RACK AND TANK PIPING MODIFICATIONS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-28 | Brooklyn · Sunset Park (East)-Borough Park (West) | Renewal Permit Without Changes · General Construction | $50M+ | P.S. 004K: PROPOSED A NEW 4-STORY SCHOOL BUILDING. | 🔒 Address & contractors |
| 2026-10-28 | Bronx · Throgs Neck-Schuylerville | Initial Permit · General Construction | $1M–5M | HEREWITH TO FILE ALTERATION TYPE ONE IN ORDER TO DO ERECT INTERIOR PARTITIONS & STAIRS. TO DO PLUMBING WORK UNDER SUBSEQUENT DOB NOW BUILD APPLICATION, AND TO OBTAIN NEW CERTIFICAT | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Standpipe | $1M–5M | Hereby filing to install sprinkler heads and fire hose cabinets with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupa | 🔒 Address & contractors |
| 2026-10-28 | Queens · Kew Gardens | Initial Permit · General Construction | $1M–5M | Proposed interior renovations to East Wing on ground and first floor per plans. Exterior work to include renovations to roof. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-28 | Staten Island · Grasmere-Arrochar-South Beach-Dongan Hills | Initial Permit · Support of Excavation | $1M–5M | SOE FOR PHASE 2 SITE PREPARATION (EARTHWORK) AND FUTURE NEW BUILDINGS IN PHASE 3. | 🔒 Address & contractors |
| 2026-10-28 | Brooklyn · Bensonhurst | Renewal Permit with Changes · General Construction | $10M–50M | Construct New 2 Stories Self Storage Facility all as per plan submitted | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Sprinklers | $1M–5M | Hereby filing to install sprinkler heads and fire hose cabinets with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupa | 🔒 Address & contractors |
| 2026-10-28 | Queens · Bay Terrace-Clearview | Renewal Permit Without Changes · General Construction | $1M–5M | P.S. 184-Q: Replacement of select roofing systems, roofing repairs, repairs to existing masonry, extension of roof guardrails, scuppers at roof, stair railing and areaway grating r | 🔒 Address & contractors |
| 2026-10-28 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Renewal Permit with Changes · Structural | $1M–5M | Structural and foundation work for new 3 story elevator and stair addition , new ADA ramp, 1st floor elevator vestibule, relocation of stair egress. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Mechanical Systems | $1M–5M | Mechanical modifications on floors 2-5 and Roof as per plans filed herewith. No changes in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Harlem (South) | Renewal Permit with Changes · General Construction | $10M–50M | PROPOSED TWELVE (12) STORY MIXED-USE DEVELOPMENT. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $10M–50M | General construction associated with tenant interior alterations on floors 2-5, including critical infrastructure work in sub-cellar, basement, 1st and roof as per plans filed here | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · West Village | Initial Permit · General Construction | $5M–10M | Interior renovations as per plans filed herewith. No change to use , egress or occupancy. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · General Construction | $1M–5M | Interior renovation of existing office area, includes new non load bearing partitions, finishes, lighting, electrical, etc. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | INSTALLATION OF NEW NON-LOAD-BEARING WALLS, DOORS, WALL AND FLOOR FINISHES, CEILINGS, AND MILLWORK ON 25TH FLOOR OFFICE SPACE AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Lower East Side | Initial Permit · General Construction | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit Without Changes · General Construction | $10M–50M | Filing herewith Alteration-CO (Alt-CO) for new outdoor theater building erected on Damrosch Park at 61 Amsterdam Avenue (Block 1134, Tax Lot 10) as an enlargement of 140-146 West 6 | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Gramercy | Initial Permit · Sprinklers | $1M–5M | Modifications to existing Sprinkler System related to Guestrooms renovation. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION TAKING PLACE ON 2ND & 8TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | Architectural work to new roof amenity building envelope, interior finish. Mechanical, Electrical and Plumbing Systems filed under separate application. Interior: Multifunction roo | 🔒 Address & contractors |
| 2026-10-28 | Brooklyn · Prospect Lefferts Gardens-Wingate | Initial Permit · Mechanical Systems | $50M+ | Herewith filing to INSTALL STEA &CONDE. PIPING FROM MER ECW39 TO PUMP AND TANK ROOM ECW39.2.INST. HIGH TO MED.PRESSURE STEAM REDUC STATION AND HIGHTO LOW PRESS. STEAM REDUCISTATION | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | MODIFICATION TO EXISTING NON-BEARING PARTITION LAYOUT THROUGHOUT APT 8-N INCLUDING NEW FINISHED CEILINGS, REPLACEMENT OF FINISH FLOORING, CABINETWORK AND COUNTERTOPS. NO CHANGE IN | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Upper East Side-Yorkville | Initial Permit · Plumbing | $1M–5M | REPLACE EXISTING SITE STORMWATER DRAINAGE SYSTEM & INSTALL NEW DRAINAGE SYSTEM FOR PLAYGROUND & INSTALL NEW SITE SANITARY CONNECTION FOR SPRAY SHOWER INCLUDING, NEW CATCH BASINS, M | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · East Harlem (North) | Renewal Permit Without Changes · General Construction | $1M–5M | Work includes per the filed plans replacement of existing roof system, associated flashing and masonry parapets interior and exterior waterproofing at cellar level, repair of mason | 🔒 Address & contractors |
| 2026-10-28 | Manhattan · Morningside Heights | Renewal Permit with Changes · General Construction | $1M–5M | interior alteration to existing Barnard offices, addition of classroom use and occupancy. This is accessory to the college. No change in egress | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Canarsie | Renewal Permit Without Changes · General Construction | $1M–5M | OT: Interior - Remove Flooring, Doors, Signage and provide new. Exterior - Remove/ Repair Existing Masonry. Provide Concrete Pad on Grade. No change in Occupancy, Use, or Egress. | 🔒 Address & contractors |
| 2026-10-27 | Bronx · Wakefield-Woodlawn | Renewal Permit Without Changes · Structural | $1M–5M | X019- Exterior Masonry Structural Work | 🔒 Address & contractors |
| 2026-10-27 | Staten Island · Grasmere-Arrochar-South Beach-Dongan Hills | Renewal Permit with Changes · Foundation | $1M–5M | PROPOSED ALTCO OF EXISTING 2-STORY COMM BLDG - PROPOSED EXPANSION WITHIN EXISTING BLDG. CHANGE IN OCCUPANCY FROM RETAIL STORE & COMM VEHICLE STORAGE TO AUTO SALES & AUTO SERVICE DE | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL MODIFICATIONS TAKING PLACE ON 14TH & 15TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Sunset Park (Central) | Initial Permit · General Construction | $1M–5M | File to propose vertical and Horizontal Enlargement for an existing 2 Story Building. Obtain 4 Family CofO. | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Plumbing | $1M–5M | Modifications to plumbing, sprinkler and standpipe systems as per plans filed herewith. No change of use, occupancy or egress. | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · East Harlem (South) | Initial Permit · General Construction | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · East Harlem (South) | Initial Permit · Plumbing | $1M–5M | PROPOSE PLUMBING SCOPE FOR MINOR RENOVATION FROM 2ND THROUGH 20TH FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · West Village | Initial Permit · Mechanical Systems | $1M–5M | Mechanical modifications as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Brownsville | Renewal Permit Without Changes · Plumbing | $5M–10M | Installing 6 domestic hot water heat pumps, 11 hot water storage tanks, new dom water serv,., replacement of wc, repl of W/S piping in basement, installing two electric swing tanks | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | Filing herewith interior renovation at existing Cellar and 1st floor, Citi Bank. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Filing for interior renovation of restaurant space at cellar and first floor. Structural and plumbing work filed subsequently in DOB NOW. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Cypress Hills | Initial Permit · General Construction | $1M–5M | Providing full accessibility to the school. Work includes Auditorium ramp renovation, front entrance concrete renovation, bathroom renovations, and the addition of an area of rescu | 🔒 Address & contractors |
| 2026-10-27 | Queens · Kew Gardens Hills | Initial Permit · Mechanical Systems | $10M–50M | HVAC scope includes replacement of ACUs 110, D/X units 11, 13, 15, 16, HV 14, EF 147, and ~200 VAV/CV boxes. New chilled water and steam-to-hot water systems to improve efficiency | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Bedford-Stuyvesant (West) | Renewal Permit with Changes · General Construction | $1M–5M | PROPOSING VERTICAL ENLARGEMENT TO AN EXISTING TWO STORY BUILDING. | 🔒 Address & contractors |
| 2026-10-27 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Interior renovations of non-load bearing partitions, replacements of interior finishes at ceiling, wall and floor surfaces, and installation of new LED lighting. No change in use, | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Borough Park | Renewal Permit Without Changes · General Construction | $1M–5M | Existing 3-Story mixed use building, to be enlarged horizontally and combined to a mixed use building | 🔒 Address & contractors |
| 2026-10-27 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit Without Changes · General Construction | $1M–5M | PROPOSED VERTICAL ENLARGEMENT OF AN EXISTING 1-STORY WAREHOUSE BUILDING TO A 4-STORY 8-FAMILY BUILDING AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-26 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Initial Permit · General Construction | $1M–5M | Replace main and bulkhead roofs and facade repairs as plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | Filing general construction work as per plan filed herewith. Related applications are filed under separate application in DOBnow. No change use, egress, and occupancy under this ap | 🔒 Address & contractors |
| 2026-10-26 | Brooklyn · East New York (North) | Initial Permit · Structural | $1M–5M | HEREWITH FILING STRUCTURAL MODIFICATIONS FOR INTERIOR FIT-OUT PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-10-26 | Queens · Springfield Gardens (North)-Rochdale Village | Initial Permit · General Construction | $1M–5M | RENOVATE EXISTING LIBRARY SUITE 2368 - REMOVE EXISTING NON-STRUCTURAL PARTITIONS - MODIFY SUSPENDED CEILING- PROVIDE NEW NON-STRUCTURAL PARTITIONS - NO CHANGE IN USE - NO CHANGE IN | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | INSTALL NEW DUCTWORK AND UNITS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · Tribeca-Civic Center | Renewal Permit with Changes · General Construction | $1M–5M | Proposed horizontal/vertical enlargement and change of use as per plans filed. | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-26 | Queens · Woodside | Renewal Permit Without Changes · General Construction | $1M–5M | New 6 story mix-use building with commercial, community facility and residential. Obtain new C of O. | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · East Midtown-Turtle Bay | Renewal Permit with Changes · General Construction | $5M–10M | GENERAL CONSTRUCTION AND FACADE MODIFICATIONS TAKING PLACE ON FLOORS 2-21 AND ROOF AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · Murray Hill-Kips Bay | Initial Permit · General Construction | $1M–5M | Installation of new partitions, doors, ceilings and finishes on the 16th floor (TD Bank- Marketing Floor 17) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-26 | Queens · Sunnyside | Initial Permit · Sprinklers | $1M–5M | Removal of existing plumbing fixtures and connected piping and extend piping to new plumbing fixtures as shown on plans. Removal and relocation of existing sprinklers heads, fire | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $1M–5M | Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-26 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Structural | $1M–5M | Structural Modifications: Structural Steel Reinforcing and Reinforcing Existing Roof Slab on the 40-42 and Roof Levels as per plans (ATRU Abatement Filing.) No change to use, egres | 🔒 Address & contractors |
| 2026-10-26 | Bronx · Crotona Park East | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING | 🔒 Address & contractors |
| 2026-10-26 | Brooklyn · Clinton Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and installation of interior non load bearing partitions for the installation of an elevator Schaft as per plans filed. | 🔒 Address & contractors |
| 2026-10-26 | Bronx · Crotona Park East | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING | 🔒 Address & contractors |
| 2026-10-26 | Bronx · Crotona Park East | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR RENOVATION OF EXISTING BUILDING, NEW FINISHES, NEW INTERIOR & EXTERIOR LIGHTING, REPLACEMENT OF WINDOWS & DOORS AND REPLACEMENT OF KITCHEN & BATHROOM FIXTURES IN EXISTING | 🔒 Address & contractors |
| 2026-10-26 | Brooklyn · Gravesend (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | THE REMOVAL OF EXISTING AIR TERMINALS AND DUCTWORK. THE REPLACEMENT OF EXISTING ROOFTOP AIR HANDLERS, EXHAUST AIR UNIT, AND ASSOCIATED DUCTWORK, PIPING, CONTROLS AND ACCESSORIES.3. | 🔒 Address & contractors |
| 2026-10-26 | Brooklyn · Gravesend (East)-Homecrest | Renewal Permit with Changes · General Construction | $1M–5M | Application filed to combine #251 and #255 Avenue W, Block 7150, Lots 36 & 37. Also, a building renovation including a horizontal enlargement with a change in use, egress and occup | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Murray Hill-Kips Bay | Initial Permit · General Construction | $1M–5M | Remaining Steam Tunnel Enclosure System (Delegated Design) | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | TTD- CONST. FL 41 / MARKETING FL 43 - FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | TTD - CONST. FL 41 / MARKETING FL 43 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION AND NON-STRUCTURAL DEMO AS SHOWN ON PLANS. THERE WILL BE NO CH | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Plumbing | $1M–5M | PL/SP work as per plans. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Plumbing | $1M–5M | Alterations to plumbing and sprinkler systems as per plans filed herewith | 🔒 Address & contractors |
| 2026-10-23 | Queens · Glen Oaks-Floral Park-New Hyde Park | Renewal Permit with Changes · General Construction | $1M–5M | PROPOSE A NEW 2ND STORY VERTICAL ENLARGEMENT TO EXISTING 1-STORY WITH CELLAR; AND CONVERSION FOR A NEW COMMERCIAL OFFICE BUILDING. OBTAIN NEW C OF O. | 🔒 Address & contractors |
| 2026-10-23 | Queens · Auburndale | Initial Permit · General Construction | $1M–5M | Install ventilation system for Boiler and Oil Tank Rooms, replace piping and miscellaneous equipment. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | TTD- CONST. FLS 42 THRU 44 / MARKETING FLS 44 THRU 46 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE NEW STAIRS AS SHOWNON PLANS.. THERE WILL BE NO CHANGE OF USE, OCCUP | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | TTD -CONSTRUCTION FLS: 24 & 39 / MARKETING FlS 26 & 41 - FILING HEREWITH MECHANICAL PLANS TO INDICATE DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRE | 🔒 Address & contractors |
| 2026-10-23 | Staten Island · Mariner's Harbor-Arlington-Graniteville | Initial Permit · Foundation | $1M–5M | PROPOSED 1 STORY ADDITION WITH MEZZANINE TO ENLARGE EXISTING LOBBY. GENERAL CONSTRUCTION, STRUCTURAL REINFORCEMENTS AND FOUNDATION FOOTINGS PER PLANS FILED. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | TTD - CONST. FL 42 / MARKETING FL 44 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION WORK AND NON-STRUCTURAL DEMO AS SHOWN ON PLANS. THERE WILL BE N | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $5M–10M | Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | TTD -CONST. FLS: 43RD & 44TH / MARKETING FLS 45 & 46 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION AND NON-TRUCTURAL SEMO AS SHOWN ON PLANS. THERE | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | OFFICE RENOVATION ON 12TH FLR - VESTAL POINT, WORK TO INCLUDE PARTITION, CEILING, AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-23 | Bronx · Fordham Heights | Renewal Permit with Changes · Structural | $1M–5M | Propose to gut rehab an existing masonry structure with floor system, including replacement of the exist. structural & nonstructural bldg. elements such as rotted floor joists, rus | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | TTD - CONST. FL 40 / MARKETING FL 42 - FILING HEREWITH FOR MECHANICAL DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Lower East Side | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL WORK FILED IN CONJUNCTION WITH THE GC APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | TTD - CONST. FL 40 / MARKETING FL 42 - FILING HEREWITH FOR INTERIOR RENOVATION. WORK TO INCLUDE GENERAL CONSTRUCTION AND NON-STRUCTURAL DEO AS SHOWN ON PLANS. THERE WILL BE NO CHAN | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | TTD- CONST. FLS: 24 & 39 / MARKETING FlLS 26 & 41. FILING HEREWITH FOR GENERAL CONSTRUCTION WORK TO INCLUDE INTERIOR RENOVATION AND NON-STRUCTURAL DEMO AS SHOWN ON PLANS. THERE W | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Upper East Side-Yorkville | Initial Permit · General Construction | $1M–5M | FACADE RESTORATION AS INDICATED ON DRAWINGS. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | TTD -CONST. FLS: 43RD & 44TH / MARKETING FLS 45 & 46 - FILING HEREWITH FOR MECHANICAL DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS AP | 🔒 Address & contractors |
| 2026-10-23 | Bronx · Mott Haven-Port Morris | Renewal Permit Without Changes · General Construction | $5M–10M | CMU BLOCK PINNING. MASONRY MORTAR REPAIR. CONCRETE CRACK REPAIR.REPLACEMENT OF WINDOWS AND DOORS. NEW LED EXTERIOR LIGHTING. ROOF AND FASCIA REPAIR ATAREAS OF CRACKING. | 🔒 Address & contractors |
| 2026-10-23 | Brooklyn · Clinton Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for facade repairs and roof replacement as per plans filed herewith no change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Structural | $1M–5M | REMOVAL OF TRAVERTINE VENEER. REMOVAL AND REPLACEMENT OF MASONRY BACKUP WALL AT 2ND THROUGH 5TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-23 | Manhattan · Murray Hill-Kips Bay | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work in conjunction with Alt-CO, as shown on plans. | 🔒 Address & contractors |
| 2026-10-23 | Brooklyn · Sunset Park (West) | Initial Permit · General Construction | $1M–5M | PROPOSED NEW 6-FAMILY FOUR STORY BUILDING. OBTAIN NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $10M–50M | Reach 4 - FBS includes elevated platform with precast decks, cast-in-place slabs/beams, floodwall to EL 16.5' on drilled shafts, roller gates, pipe-pile barrier, micropile T-wall, | 🔒 Address & contractors |
| 2026-10-22 | Queens · Woodside | Renewal Permit with Changes · General Construction | $1M–5M | CONVERSION AND VERTICAL EXTENSION OF EXISTING 1 STORY FACTORY BUILDING TO 2 STORY OFFICE/STORAGE BUILDING WITH FIRST FLOOR AS INDOOR PARKING AREA. NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-22 | Brooklyn · Bushwick (West) | Renewal Permit Without Changes · General Construction | $1M–5M | Face brick replacement. Remove and restore existing stone masonry and repoint. Gutter lining in existing gutter. Saw cut pavement and excavation provide concrete or smooth surface, | 🔒 Address & contractors |
| 2026-10-22 | Queens · Astoria (North)-Ditmars-Steinway | Renewal Permit Without Changes · General Construction | $1M–5M | Window replacement and exterior stairway replacement in kind. No change to use, occupancy, or egress | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST & 14TH FL ROOF BULKHEAD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit with Changes · Full Demolition | $10M–50M | full demolition of 22 story structure using hand held and mechanical equipment to assist. | 🔒 Address & contractors |
| 2026-10-22 | Brooklyn · East Williamsburg | Initial Permit · General Construction | $5M–10M | Filing for building Enclosure rehabilitation to the facade and roof. | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Installation of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | General contraction of interior partitions, doors, suspended ceilings, flooring and finishes on the 15th Floor (Dentons) as per plans No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | INSTALL ALL NEW MECHANICAL SYSTEMS IN BUILDING CONSISTING OF AIR COOLED HEAT RECOVERY COOLING/HEATING SYSTEM AND DEDICATED OUTDOOR AIR SYSTEM. | 🔒 Address & contractors |
| 2026-10-22 | Queens · Jamaica | Initial Permit · General Construction | $1M–5M | HEREWITH FILING FOR A HORIZONTAL ENLARGEMENT TO ENCLOSE PARTIAL FIRST FLOOR OF A TWO STORY BUIDING. OBTAIN A NEW CO | 🔒 Address & contractors |
| 2026-10-22 | Brooklyn · Flatbush | Initial Permit · Mechanical Systems | $1M–5M | Direct replacement in kind of (4) existing Air handling units serving IT Server space. | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | CHAPEL & SACRISTY- FACADE RESTORATION INCLUDING LOCALIZED BRICK AND BROWNSTONE MASONRY REPAIRS, SELECT ROOF REPLACEMENT, RECONSTRUCTION OF MASONRY TURRETS, STAINED AND LEADED-GLASS | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Plumbing | $1M–5M | Modifications to sprinkler and plumbing systems as per plans filed herewith. No change of use, occupancy or egress. | 🔒 Address & contractors |
| 2026-10-22 | Queens · Bay Terrace-Clearview | Initial Permit · General Construction | $1M–5M | THIS PROJECT IS A CONNECTION OF TWO EXISTING ONE STORY SPACES INTO ABREEZEWAY THAT CONNECTS THE TWO STORIES. THIS SCOPE INCLUDES NEWCONSTRUCTION OF A STAIR AND ELEVATOR, NEW FACADE | 🔒 Address & contractors |
| 2026-10-22 | Queens · Murray Hill-Broadway Flushing | Initial Permit · General Construction | $1M–5M | Renovation of existing supermarket due to fire, address vacate order complaint #4A11591, no change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-10-22 | Brooklyn · East Williamsburg | Initial Permit · General Construction | $1M–5M | Renovation of existing office space, consisting of partial ceiling replacement, minor partition modifications, new roof membranes at bulkheads, & installation of a mechanical scree | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · Tribeca-Civic Center | Initial Permit · Structural | $1M–5M | MODIFICATION OF TEMPORARY RAKER SHORING SYSTEM PREVIOUSLY FILED UNDER 123558159 TO ALLOW FOR NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 121190497. | 🔒 Address & contractors |
| 2026-10-22 | Brooklyn · Windsor Terrace-South Slope | Renewal Permit Without Changes · General Construction | $1M–5M | PS 154 - K REPLACEMENT OF ALL OF ROOF NO.2 AND PARTIAL OF ROOF NO.1 INCLUDING FLASHINGAROUND PERIMETER OF ROOF NO.1 AND GUARDRAIL AT ROOF NO.2. INTERIOR FLOOR REPAIRS. AS PER PLANS | 🔒 Address & contractors |
| 2026-10-22 | Manhattan · East Harlem (South) | Initial Permit · Structural | $5M–10M | HEREWITH FILING FOR STRUCTURAL MODIFICATIONS INCLUDING SHOULDER OVERBUILDS AND SLAB MODIFICATION AS PER PLANS. | 🔒 Address & contractors |
| 2026-10-22 | Queens · Astoria (East)-Woodside (North) | Renewal Permit Without Changes · General Construction | $1M–5M | Propose 4 story 3 family new building | 🔒 Address & contractors |
| 2026-10-21 | Bronx · University Heights (South)-Morris Heights | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical plans filed herewith | 🔒 Address & contractors |
| 2026-10-21 | Brooklyn · Gravesend (East)-Homecrest | Initial Permit · General Construction | $1M–5M | HEREWITH FILING FOR HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION. NOCHANGE IN USE EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-21 | Brooklyn · Prospect Heights | Renewal Permit Without Changes · General Construction | $1M–5M | Vertical and horizontal enlargement and renovation of existing building. | 🔒 Address & contractors |
| 2026-10-21 | Brooklyn · Coney Island-Sea Gate | Renewal Permit with Changes · General Construction | $1M–5M | APPLICATION FILED TO HORIZONTALLY ENLARGE AND RENOVATE THE EXISTING 3-STORY + CELLAR SYNAGOGUE AND DORMITORY. | 🔒 Address & contractors |
| 2026-10-21 | Queens · Woodside | Renewal Permit Without Changes · Plumbing | $1M–5M | filing for the installation of plumbing fixtures and all associated work for plumbing as per plans. | 🔒 Address & contractors |
| 2026-10-21 | Bronx · Mott Haven-Port Morris | Renewal Permit Without Changes · General Construction | $1M–5M | Building rehabilitation of 42 apts, new kitchen and bathrooms, new windows, refinishing apt. floors, scrape, patch & paint apt. walls/ceiling, new build entry/vest. doors, new mail | 🔒 Address & contractors |
| 2026-10-21 | Manhattan · Tribeca-Civic Center | Initial Permit · Mechanical Systems | $1M–5M | Mechanical modifications as per plans | 🔒 Address & contractors |
| 2026-10-21 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $10M–50M | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 15TH AND 16TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-21 | Bronx · Mott Haven-Port Morris | Renewal Permit Without Changes · General Construction | $1M–5M | Building rehabilitation of 42 apts, new kitchen and bathrooms, new windows, refinishing apt. floors, scrape, patch & paint apt. walls/ceiling, new build entry/vest. doors, new mail | 🔒 Address & contractors |
| 2026-10-21 | Queens · Queensboro Hill | Initial Permit · Mechanical Systems | $1M–5M | FIT OUT_INFUSION 6TH, 7TH, 8TH FLOORS AND ROOF - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-21 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Interior renovation of commercial office space - Removal/installation of interior non-bearing partitions & related finishes. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-10-21 | Brooklyn · Crown Heights (South) | Initial Permit · General Construction | $5M–10M | General Construction work for Medgar Evers College | 🔒 Address & contractors |
| 2026-10-21 | Brooklyn · Fort Greene | Initial Permit · Mechanical Systems | $1M–5M | Alt. MS filed subsequently with the alt. GC application. Modify existing and install new HVAC components. | 🔒 Address & contractors |
| 2026-10-21 | Brooklyn · Prospect Heights | Renewal Permit Without Changes · General Construction | $10M–50M | Vertical and horizontal enlargement and renovation of existing building. | 🔒 Address & contractors |
| 2026-10-21 | Queens · Sunnyside | Initial Permit · Mechanical Systems | $5M–10M | Mechanical modifications taking place on floors 1-5 as per plans filed herewith. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-10-20 | Bronx · Throgs Neck-Schuylerville | Initial Permit · Mechanical Systems | $1M–5M | HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-20 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $5M–10M | Patching and repairing of existing roofing membrane with in-kind materials at new structural penetrations as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-20 | Brooklyn · Greenpoint | Renewal Permit with Changes · General Construction | $1M–5M | PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT TO AN EXISTING 3 STORY & CELLAR BUILDING. | 🔒 Address & contractors |
| 2026-10-20 | Queens · Pomonok-Electchester-Hillcrest | Renewal Permit Without Changes · General Construction | $1M–5M | Infrastructure to improve management of stormwater runoff from the tributary impervious surfaces. On-site Green Infrastructure Cloudburst Pilot Project. DEP Capital Contract No. GQ | 🔒 Address & contractors |
| 2026-10-20 | Queens · Long Island City-Hunters Point | Initial Permit · General Construction | $1M–5M | TO CONVERT A WAREHOUSE TO AN INDOOR AMUSEMENT PLAYGROUND ON 1ST FLOOR. TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-20 | Queens · Sunnyside | Renewal Permit Without Changes · Structural | $1M–5M | Q125- Flood elimination, interior wall and courtyard repair, mitigation of interior water damage, excavation and waterproofing foundation walls. | 🔒 Address & contractors |
| 2026-10-20 | Brooklyn · East New York-New Lots | Initial Permit · Structural | $10M–50M | Structural filing for partial demolition of existing building and construction of new building using existing elements as per plans filed. Changes to use, egress, and occupancy bas | 🔒 Address & contractors |
| 2026-10-20 | Brooklyn · Bedford-Stuyvesant (West) | Initial Permit · General Construction | $1M–5M | NYCHA BOILER - Removal of boilers and related equipment, replacement of equipment to remain, and related minor exterior work. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-20 | Queens · Astoria (North)-Ditmars-Steinway | Initial Permit · Foundation | $5M–10M | remove existing asphalt in the lot with in the area of work, install new subsurface stormwater infiltration system, repave the area with new asphalt, replace existing fence in plac | 🔒 Address & contractors |
| 2026-10-20 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · General Construction | $1M–5M | Interior Renovation on 5th Floor. | 🔒 Address & contractors |
| 2026-10-20 | Queens · Auburndale | Renewal Permit Without Changes · General Construction | $1M–5M | ENLARGEMENT OF EXISTING COMMERCIAL BUILDING IN CONJUNCTION WITH SI#421842395. NEW CERTIFICATE OF OCCUPANCY FOR 2-STORY COMMERCIAL BUILDING. | 🔒 Address & contractors |
| 2026-10-20 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Mechanical Systems | $1M–5M | INSTALLATION OF NEW MECHANICAL SYSTEMS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-20 | Bronx · Longwood | Renewal Permit Without Changes · General Construction | $1M–5M | BUILDING REHABILITATION AS FLOOWS: EXTERIOR REPAIRS, NEW BUILDING ENTRY AND VEST. DOORS, KITCHEN CABINET, BATH. WALL/FLOOR SURFACE REPLACEMENT, REPAIR FLOOR/WALL SURFACES, IN EACH | 🔒 Address & contractors |
| 2026-10-20 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | Interior renovation on parts of 13th and 14th floors related to conference center. | 🔒 Address & contractors |
| 2026-10-20 | Bronx · University Heights (North)-Fordham | Initial Permit · General Construction | $1M–5M | THE SCOPE INCLUDES STRUCTURAL FLOOR REPAIRS, RECONFIGURATION AND MODERNIZATION OF KITCHEN AND BATHROOM LAYOUTS, INSTALLATION OF NEW FINISHES THROUGHOUT, AND REPLACEMENT OF ALL DOOR | 🔒 Address & contractors |
| 2026-10-20 | Staten Island · Westerleigh-Castleton Corners | Initial Permit · Earth Work | $1M–5M | remove and replace pavement, install basketball court, install new fitness units. | 🔒 Address & contractors |
| 2026-10-20 | Brooklyn · Bath Beach | Renewal Permit Without Changes · General Construction | $1M–5M | Exterior Masonry work such as re-pointing of masonry joints, brick replacement areas, cleaning of face brick efflorescence, and sealant replacement of all coping stone joints and w | 🔒 Address & contractors |
| 2026-10-20 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit with Changes · General Construction | $1M–5M | RENOVATION OF EXISTING HOUSE OF WORSHIP, INT & EXT DEMO, GENERAL CONSTRUCTION. REMOVAL & REPLACEMENT OF EXISTING FACADE INCLUDING ORNAMENTAL TOWER/SPIRE, EXISTING ARCADE & EXTERIOR | 🔒 Address & contractors |
| 2026-10-19 | Brooklyn · East New York-New Lots | Renewal Permit with Changes · Plumbing | $1M–5M | REPLACEMENT OF ALL BATHROOM, KITCHEN FIXTURES, SLOP SINK IN JANITORS CLOSET AND ROOF DRAINS WITHIN EXISTING LOCATION. NEW PLUMBING FIXTURES AT CELLAR AS PER PLANS FILED. THE REPL | 🔒 Address & contractors |
| 2026-10-19 | Brooklyn · Brooklyn Heights | Initial Permit · General Construction | $5M–10M | Modification of existing building to include General construction, facade and roof work as well as a change in use on the first floor. | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · Manhattanville-West Harlem | Renewal Permit with Changes · General Construction | $1M–5M | NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS. | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · Manhattanville-West Harlem | Initial Permit · Mechanical Systems | $1M–5M | APPLICATION FILED FOR MODIFICATION TO EXISTING HVAC SYSTEM INCLUDING A NEW AIR HANDLING UNIT, NEW DUCTWORK AND ASSOCIATED MECHANICAL WORK. | 🔒 Address & contractors |
| 2026-10-19 | Bronx · Allerton | Initial Permit · General Construction | $1M–5M | Roofing replacement and rooftop structure renovation | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Filing herewith interior demo. and renovation on the 39th FL. (37th Construction, 39th Marketing) as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-19 | Brooklyn · Bushwick (East) | Initial Permit · General Construction | $1M–5M | Exterior masonry repair and replacement, interior water infiltration remediation | 🔒 Address & contractors |
| 2026-10-19 | Queens · Sunnyside | Renewal Permit Without Changes · General Construction | $1M–5M | INSTALLATION OF AN OPEN NON-ACCESSORY BATTERY ENERGY STORAGE SYSTEMS INCONJUNCTION WITH Q01010975. | 🔒 Address & contractors |
| 2026-10-19 | Brooklyn · Brownsville | Initial Permit · Sprinklers | $1M–5M | SPRINKLER SYSTEM FILED IN CONJNCTION WITH ALT CO JOB NUMBER B01246769-I1. | 🔒 Address & contractors |
| 2026-10-19 | Brooklyn · Flatbush | Initial Permit · General Construction | $1M–5M | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Roof (Kings-Theater) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-19 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $10M–50M | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 38th floor (Ares- Buildout) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | NYCHA EAST RIVER BOILERS CONSISTING OF MECHANICAL WORK FOR BOILER REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Lobby renovation, with installation of new partitions, doors, suspended ceilings, and finishes on the 1st Floor (Lobby), as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-19 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit Without Changes · Structural | $1M–5M | NYCHA Sumner Building 6- Proposed Structural work. | 🔒 Address & contractors |
| 2026-10-19 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit Without Changes · General Construction | $10M–50M | ROOFING REPLACEMENT, MASONRY REPAIRS, PARAPET REPAIRS AND PARTIAL REPLACEMENT, LIMITED WINDOW AND EXTERIOR DOOR REPLACMENT, CONCRETE WALL, SLAB, AND VAULT REPAIRS AT CELLAR, CONCRE | 🔒 Address & contractors |
| 2026-10-19 | Queens · Sunnyside | Renewal Permit Without Changes · General Construction | $1M–5M | installation of a BESS system in conjunction with EESE filing | 🔒 Address & contractors |
| 2026-10-16 | Bronx · Williamsbridge-Olinville | Initial Permit · Structural | $1M–5M | New 233rd Street Pumping Station. NYC DEP Capital Project WP-269 PS-DES-2 Pumping Stations. | 🔒 Address & contractors |
| 2026-10-16 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $5M–10M | Interior Renovation as per plans filed herewith. No change of use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-16 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | FILING FOR INTERIOR RENO FOR 7TH FLOOR PREBUILT OFFICE SPACE AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-16 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $50M+ | Alt-CO being filed for the conversion of a commercial building to a residential use per Article 1 Chapter 5. | 🔒 Address & contractors |
| 2026-10-16 | Brooklyn · Brooklyn Navy Yard | Renewal Permit Without Changes · Structural | $1M–5M | Installation of Electrical Platform as per plans. SUBSTATION G BUILDING 386, no change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-10-16 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | RENOVATION OF EXISTING 39TH FLOOR OFFICE SUITE FOR NEW OFFICES & CONFERENCE ROOMS, INCLUDING DEMOLITION OF EXISTING AND CONSTRUCTION OF NEW INTERIOR PARTITIONS, FINISHES, DOORS, C | 🔒 Address & contractors |
| 2026-10-16 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $5M–10M | MECHANICAL WORK TO REMOVE EXISTING COOLING TOWER AND INSTALL OF HEAT PUMP CHILLERS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-16 | Manhattan · Tribeca-Civic Center | Renewal Permit Without Changes · General Construction | $5M–10M | Interior renovation of the Cellar (A Level), including ceilings, partitions, floors and finishes as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-15 | Bronx · Bedford Park | Initial Permit · General Construction | $1M–5M | Lehman College, Carman Hall Courtyards & Main Staircases waterproofing: Removal / replacement /repairs of waterproofing membrane, spalled concrete & deteriorated reinforcements, fl | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Manhattanville-West Harlem | Renewal Permit with Changes · General Construction | $1M–5M | NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Upper West Side (Central) | Renewal Permit Without Changes · Full Demolition | $1M–5M | full demolition of four story structure | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Manhattanville-West Harlem | Renewal Permit with Changes · General Construction | $1M–5M | NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS. | 🔒 Address & contractors |
| 2026-10-15 | Brooklyn · Brooklyn Navy Yard | Initial Permit · Standpipe | $1M–5M | Bldg 3: Revisions to the existing fire sprinkler system and standpipe. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Financial District-Battery Park City | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy | 🔒 Address & contractors |
| 2026-10-15 | Brooklyn · East New York-New Lots | Initial Permit · General Construction | $1M–5M | GC work correspondent to the installation of a new water line and RPZ within an existing comfort station @Jerome Playground Comfort Station. All as per plans filed herewith. | 🔒 Address & contractors |
| 2026-10-15 | Queens · Flushing Meadows-Corona Park | Initial Permit · Foundation | $50M+ | FILING HEREWITH FOUNDATION/EARTHWORK FOR TEMPORARY PARKING AREA AS PER PLANS. FILED UNDER MPP Project-000000254. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | General construction plans filed herewith to show interior renovations. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-15 | Queens · Astoria (East)-Woodside (North) | Initial Permit · Mechanical Systems | $1M–5M | THIS APPLICATION IS FILED FOR MECHANICAL WORKTYPE IN CONJUNCTION WITH Q00921620-I1. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | PROPOSED CONVERSION OF EXISTING NINE (9) STORY COMMERCIAL BUILDING USE TO RESIDENTIAL & COMMERCIAL USE AND ADDITION OF SIX (6) STORIES. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION TAKING PLACE ON CEL, 1ST & MEZ AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Upper West Side (Central) | Initial Permit · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING, AND CEILINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | Installation of a new HVAC system on the 38th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Manhattanville-West Harlem | Renewal Permit with Changes · General Construction | $1M–5M | NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS. | 🔒 Address & contractors |
| 2026-10-15 | Queens · Flushing Meadows-Corona Park | Renewal Permit with Changes · General Construction | $50M+ | MPP#442/NYC DEV HUB FILING: Application filed for renovations to Arthur Ashe Stadium and updated layouts to obtain new CO. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · East Village | Initial Permit · General Construction | $1M–5M | Upgrading school auditorium (lights, PA system, finishes). | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Manhattanville-West Harlem | Renewal Permit with Changes · General Construction | $1M–5M | NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Manhattanville-West Harlem | Renewal Permit with Changes · General Construction | $1M–5M | NEW STORE FRONT ASSEMBLY AT BUILDING ENTRANCE AND TERRACES, NEW WINDOWS, REPLACEMENT OF ALL MAIN AND BULKHEAD ROOFS. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · West Village | Renewal Permit Without Changes · General Construction | $1M–5M | General Construction modifications taking place on floors CEL-006 as per plans filed herewith. No change in Use, Egress or Occupancy. | 🔒 Address & contractors |
| 2026-10-15 | Manhattan · Murray Hill-Kips Bay | Initial Permit · General Construction | $1M–5M | General construction associated with lobby renovation on 1st floor as per plans filed herewith. No changes in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-14 | Manhattan · West Village | Renewal Permit Without Changes · Plumbing | $1M–5M | Installation of new plumbing infrastructure, fixtures and related piping for proposed 5-story multi-family residential building with accessory parking storage. | 🔒 Address & contractors |
| 2026-10-14 | Manhattan · Morningside Heights | Renewal Permit with Changes · General Construction | $1M–5M | MS MORNINGSIDE - CHAPEL PAVILION FACADE REPAIRS - GENERAL CONSTRUCTION INCLUDING FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit Without Changes · Structural | $10M–50M | INT. REMOVALS & INSTALLATIONS OF NON-LOAD BEARING PARTITIONS, FLOOR, WALL & CLG FINISHES. REPAIR/REPLACEMENT OF WINDOWS & 1FL FRONT ENTRY AND ROOF MEMBRANE/INSULATION REPAIR AND/OR | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Gravesend (South) | Renewal Permit with Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-14 | Queens · Astoria (East)-Woodside (North) | Initial Permit · General Construction | $1M–5M | installation of energy storage system in open space. no change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit Without Changes · General Construction | $5M–10M | P.S. 057-K: Window replacement, limited facade maintenance/renovation, limited repaving, replacement of exterior lighting fixtures, parapet repairs, and miscellaneous exterior repa | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Brooklyn Heights | Initial Permit · General Construction | $1M–5M | Sidewalk wearing course, curb and limited roadway paving replacement at Court Street & Montague Street frontages over vault water proofing and below grade sidewalk vault structural | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Bay Ridge | Initial Permit · Structural | $1M–5M | Conversion of the reail space to the day care center | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Gravesend (East)-Homecrest | Renewal Permit with Changes · General Construction | $1M–5M | COMPLETE RENOVATION OF THE EXISTING BUILDING, HORIZONTAL AND VERTICAL EXTENSIONS, PARTITIONS | 🔒 Address & contractors |
| 2026-10-14 | Manhattan · West Village | Renewal Permit Without Changes · General Construction | $1M–5M | MISCELLANEOUS FACADE, ROOF AND TERRACE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-14 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Sidewalk Shed | $1M–5M | INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Initial Permit · General Construction | $1M–5M | New elevator addition and existing building alterations for ADA compliance including but not limited to: accessible toilets, exterior accessible ramp, fire rescue rooms and other u | 🔒 Address & contractors |
| 2026-10-14 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · East Williamsburg | Initial Permit · General Construction | $1M–5M | Repair of roof and replacement of skylights. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-14 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit with Changes · Structural | $1M–5M | MSW - WEST BUILDING FISP SUB-CYCLE FACADE REPAIRS - GENERAL CONSTRUCTION FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Gravesend (South) | Renewal Permit with Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-14 | Bronx · Morris Park | Initial Permit · General Construction | $1M–5M | ARCHTECTURAL MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-14 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Initial Permit · Structural | $5M–10M | structural work at cellar as needed. Related Job Numbers: B01266291-I1; B01266291-S1; B01266291-S2; B01266291-S3; B01322412-I1 | 🔒 Address & contractors |
| 2026-10-14 | Queens · Queensbridge-Ravenswood-Dutch Kills | Renewal Permit Without Changes · General Construction | $1M–5M | PROPOSED NEW BUILDING WITH EXISTING ELEMENTS TO REMAIN FOR A 4 STORY MIXED USE BUILDING WITH 6 CLASS A DWELLING UNITS | 🔒 Address & contractors |
| 2026-10-14 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · Mechanical Systems | $1M–5M | Modification of mechanical systems as per plans filed herewith. | 🔒 Address & contractors |
| 2026-10-14 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit with Changes · Structural | $10M–50M | Structural work for the construction of new 23 story Mixed Use Building as per plans filed | 🔒 Address & contractors |
| 2026-10-13 | Brooklyn · Ocean Hill | Initial Permit · General Construction | $1M–5M | Exterior Facade Repair | 🔒 Address & contractors |
| 2026-10-13 | Brooklyn · Ocean Hill | Renewal Permit Without Changes · General Construction | $1M–5M | New addition foundation walls, excavation and backfill, concrete basement slab on grade, floor framing for floors 1-4, reinforce masonry exterior bearing walls, steel support colum | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Upper West Side (Central) | Initial Permit · Plumbing | $1M–5M | PLUMBING WORK CONSISTING OF REPLACEMENT OF EXISTING HOT WATER HEATERS, DOMESTIC BOOSTER PUMPS, A SEWAGE EJECTOR PUMP, THE EXISTING NATURAL GAS SYSTEM AND EXISTING PLUMBING FIXTUR | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Initial Permit · General Construction | $1M–5M | THIS IS A HUB PROJECT. Remove interior partitions and construct temporary protection on floors basement, and 1 through 5 in the existing commercial building as per plans filed her | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Initial Permit · General Construction | $1M–5M | HUB JOB- MPP 678. Construction of new restrooms on floors 7-9 in the existing building including alterations for mechanical equipment in penthouse. Install rated construction at f | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Upper West Side (Central) | Initial Permit · General Construction | $1M–5M | Application filed to demise existing retail spaces into (3) retail spaces on first floor and work in cellar. No change in use, egress and occupancy | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Interior renovation work in commercial office space to include construction of new partitions, finishes, new doors, ceilings, new core restrooms, new warming pantry, meeting spaces | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Sprinklers | $1M–5M | Sprinkler and Standpipe work associated with the conversion. | 🔒 Address & contractors |
| 2026-10-13 | Queens · Flushing Meadows-Corona Park | Renewal Permit Without Changes · Foundation | $1M–5M | Foundation work related to renovation of existing stadium structure including reinforcement of the existing steel columns for loads imposed by future work (ASHE STADIUM) | 🔒 Address & contractors |
| 2026-10-13 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · General Construction | $1M–5M | Removal of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-10-13 | Queens · Ozone Park | Initial Permit · General Construction | $1M–5M | HEREWITH FILING A ZERO LOT LINE THREE STORY WITH CELLAR HOUSE OF WORSHIP. | 🔒 Address & contractors |
| 2026-10-13 | Bronx · Pelham Bay Park | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of a fuel oil storage tank 8000 gallon. | 🔒 Address & contractors |
| 2026-10-13 | Bronx · Soundview-Bruckner-Bronx River | Initial Permit · Plumbing | $1M–5M | X123: Subsequent filing of plumbing work type. Removal and replacement of roof, area drains and associate piping. | 🔒 Address & contractors |
| 2026-10-13 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Renewal Permit with Changes · General Construction | $5M–10M | Modernization of NYCHA housing building, to be vacated during construction. | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | REPLACEMENT OF CHILLER, PROVIDE NEW PAD FOR HEAT EXCHANGER, PROVIDE NEW HEAT EXCHANGER ALONG WITH COOLING TOWER MODIFICATIONS | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $5M–10M | INSTALLATION OF NON-LOAD BEARING WALLS, FLOORS, CEILING AND FINISHES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Midtown-Times Square | Initial Permit · Full Demolition | $1M–5M | Full demolition of structure | 🔒 Address & contractors |
| 2026-10-13 | Queens · Ridgewood | Initial Permit · Mechanical Systems | $1M–5M | Install New Mechanical Systems within Structural Steel Framing that was reconstructed under Investigative Environmental Probes Under DOBNOW Permitted Application #Q00934566-I1 and | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | Alteration, addition of (4) electric baseboard radiators, (7) supplemental water source heat pumps, associated ducts, and piping. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-13 | Queens · Kew Gardens Hills | Initial Permit · General Construction | $1M–5M | HEREWITH FILING DEMO & CONSTRUCTION TO EXISTINGS WALLS, DOORS, AND PARTITIONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | 🔒 Address & contractors |
| 2026-10-13 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Renewal Permit with Changes · General Construction | $5M–10M | nycha modernization | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · Harlem (North) | Initial Permit · Structural | $1M–5M | BUILDING #1: INSTALLATION OF TEMPORARY SHORING FOR COLUMN REPAIRS AS PER PLANS. | 🔒 Address & contractors |
| 2026-10-13 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | Alteration, addition of (2) supplemental water source heat pump, (16) supplemental VRF evaporators, (4) water source condensing units, associated ducts, and piping. No change to us | 🔒 Address & contractors |
| 2026-10-13 | Brooklyn · Mapleton-Midwood (West) | Renewal Permit Without Changes · General Construction | $5M–10M | INTERIOR DEMOLITION AND RENOVATION OF SCHOOL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-09 | Queens · Ridgewood | Initial Permit · Plumbing | $1M–5M | Install Sprinkler and Standpipe systems modifications within floors 001, 002, 003 in conjunction with original Environmental Investigative Probe and Foundation Removal Application | 🔒 Address & contractors |
| 2026-10-09 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | 🔒 Address & contractors |
| 2026-10-09 | Manhattan | Renewal Permit Without Changes · General Construction | $1M–5M | NEW EQUIPMENT SUPPORT BUILDING (NORTH) FOR DEP AS PART OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT IN EAST RIVER PARK. | 🔒 Address & contractors |
| 2026-10-09 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $10M–50M | JOB WAS ACCEPTED TO HUB AT CONSULTATION ON 7/18/23. PROPOSED CHANGE OF USE FROM UG 3 & 4 TO UG V & VIII. HORIZONTAL ENLARGEMENT AT 6TH FLOOR & ROOF. INTERIOR AND EXTERIOR RENOVATIO | 🔒 Address & contractors |
| 2026-10-09 | Bronx · Pelham Parkway-Van Nest | Initial Permit · Structural | $1M–5M | See comments.Demo ex. steel dunnage syst@roof level,inst.new one to support rooftop equip. New dunnage t/be anchored to existing roof structural framing to be reinforced. Local.con | 🔒 Address & contractors |
| 2026-10-09 | Queens · Flushing Meadows-Corona Park | Renewal Permit with Changes · General Construction | $5M–10M | NYC DEV HUB: Selective architectural related demolition in preparation for future renovations at Arthur Ashe Stadium | 🔒 Address & contractors |
| 2026-10-09 | Manhattan · Harlem (North) | Renewal Permit Without Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-09 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | REMOVAL AND CONSTRUCTION OF INTERIOR PARTITIONS, CEILINGS,DOORS, AND FLOORS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE TOUSE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-09 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | GENERAL CONSTRUCTION TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-09 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL WORK TAKING PLACE ON THE 26TH AND 27TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · Structural | $1M–5M | DevHUB Consultation 7.18.2025 @2pm. Application filed for structural work associated with horizontal and vertical enlargement. | 🔒 Address & contractors |
| 2026-10-08 | Bronx · Bedford Park | Initial Permit · Mechanical Systems | $5M–10M | Replacement of air handler units and associated duct work at existing CUNY Library Lehman College Shuster Hall | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Additions & modifications to existing mechanical system and related piping. Interior partitions work filed under DOBNOW #M00450681. File in conjuction with Alt I # 123907512. No ch | 🔒 Address & contractors |
| 2026-10-08 | Staten Island · Westerleigh-Castleton Corners | Renewal Permit Without Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · East Harlem (North) | Initial Permit · General Construction | $1M–5M | HEREBY FILING GUT RENOVATION WITH VERTICAL AND HORIZONTAL ENLARGEMENT (AT REAR) TO EXISTING 4 FAMILY RESIDENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED PLUMBING/SPRINKLER WO | 🔒 Address & contractors |
| 2026-10-08 | Brooklyn · East Flatbush-Erasmus | Renewal Permit Without Changes · Structural | $1M–5M | EXTERIOR RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQURED TO BE FILED SEPARATELY. | 🔒 Address & contractors |
| 2026-10-08 | Brooklyn · Flatbush | Renewal Permit Without Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS FILED HEREWITH.. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site Yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · The Battery-Governors Island-Ellis Island-Liberty Island | Renewal Permit Without Changes · General Construction | $1M–5M | Governor's Island: Civil work - Installing new curb and sidewalk as per site layout plan. Installing drainage pipe. Removal of landscape feature wall. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Upper East Side-Yorkville | Renewal Permit Without Changes · General Construction | $1M–5M | application filed for facade repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Midtown-Times Square | Initial Permit · Plumbing | $1M–5M | Modification to plumbing fixtures as per plans filed herewith. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $1M–5M | SELECTIVE BRICK MASONRY REPLACEMENT, STONE SILL REPLACEMENT, LINTEL REPLACEMENT, PARAPET RECONSTRUCTION, CHIMNEY RECONSTRUCTION, MARBLE STONE PATCHING/REPLACEMENT, BLUESTONE REP | 🔒 Address & contractors |
| 2026-10-08 | Brooklyn · Sunset Park (West) | Initial Permit · General Construction | $1M–5M | VERTICAL ENLARGEMENT OF EXISTING 1-STORY COMMERCIAL BUILDING TO CREATE A MIXED-USE BUILDING AS PER THE DRAWINGS FILED HEREIN. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Filing herewith application for mechanical systems modifications. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-08 | Queens · Bayside | Initial Permit · General Construction | $1M–5M | Herewith filing interior alterations, change of use at second floor, for proposed restaurant build out. | 🔒 Address & contractors |
| 2026-10-08 | Brooklyn · Prospect Park | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | APPLICATION IS FILED FOR MECHANICAL/ARCHITECTURAL WORK ASSOCITED WITH THE INSTALLATION OF THE HYDRONIC DISTRIBUTION PIPING FROM CELLAR TO ALL FLOORS AT BROOKLYN MUSEUM, IT WILL BE | 🔒 Address & contractors |
| 2026-10-08 | Brooklyn · Sunset Park (West) | Initial Permit · Mechanical Systems | $1M–5M | MH: Provide new mechanical systems to serve the building. No change in use, occupancy, or egress. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $5M–10M | General construction as shown on plans filed herewith. No change in use, egress, and occupancy. | 🔒 Address & contractors |
| 2026-10-08 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | amend c of o to reflect proposed build out of eating and drinking establishment with accessory kitchen in cellar and mechanical equipment at mezzanine | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Harlem (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | M076-INSTALLATION OF DUCTWORK & PIPING, EXHAUST FANS, VENTILATORS & GRAVITY VENTILATORS & AUTOMATIC TEMP CONTROLS. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | General construction as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-07 | Staten Island · Port Richmond | Renewal Permit Without Changes · General Construction | $1M–5M | ENLARGEMENT OF WAREHOUSE, ONE STORY AND MEZZANINE | 🔒 Address & contractors |
| 2026-10-07 | Brooklyn · Bedford-Stuyvesant (West) | Initial Permit · Foundation | $1M–5M | Foundation and structure for new elevator lobby on cellar through fifth floor. This is a SHPO Building. | 🔒 Address & contractors |
| 2026-10-07 | Staten Island · Oakwood-Richmondtown | Renewal Permit Without Changes · General Construction | $5M–10M | Filing here general construction work related to demolition of equipment, concrete pads, repairs, patch and repaint related to replacement and installation of sludge thickening equ | 🔒 Address & contractors |
| 2026-10-07 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · General Construction | $1M–5M | PROPOSED CONCRETE PADS FOR CON EDISONS ELECTRICAL EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCPANCY. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | REPAIRS TO FACADE PANELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Tribeca-Civic Center | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Manhattan Family Court - Mechanical work on the sub-cellar, cellar, 1st mezzanine, 1st thru 12th floor as indicated on drawings. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Manhattanville-West Harlem | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | REPLACEMENT OF EXISTING DUCTWORK AND ACCESSORIES, FIRE DAMPERS, SUPPLY AND RETURN GRILLES AND BALANCING THE VENTILATION SYSTEM. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $1M–5M | HEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Tribeca-Civic Center | Renewal Permit Without Changes · General Construction | $1M–5M | Filing application for interior renovation of restaurant space in cellar and first floor. Work includes installation of interior non-load bearing partitions and finishes. No change | 🔒 Address & contractors |
| 2026-10-07 | Bronx · Williamsbridge-Olinville | Renewal Permit with Changes · General Construction | $1M–5M | REPLACEMENT OF MAIN AND BULKHEAD ROOFS, BALCONY REPAIRS, PARAPET REPLACMENT, BRICK REPLACEMENT, POINTING, SILL REPLACEMENT, SHELF ANGLE REPLACEMENT, INTERIOR REPAIRS/UPGRADE AS PER | 🔒 Address & contractors |
| 2026-10-07 | Queens · Glen Oaks-Floral Park-New Hyde Park | Initial Permit · Sprinklers | $1M–5M | Northwell LIJ Sprinkler Upgrade project - Research Wing: sprinkler upgrades throughout building, as per plans filed herewith. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Tribeca-Civic Center | Initial Permit · Structural | $1M–5M | Modification to structural work as per plans filed herewith showing steel dunnages for MEP units. No change of use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-10-07 | Brooklyn · Prospect Lefferts Gardens-Wingate | Initial Permit · General Construction | $1M–5M | 3RD Floor CTF Sensory Room Conversion combining two classrooms and accessory office. The 3RD Floor Path of Travel involves the replacement of Drinking Fountain with Water Bottle Re | 🔒 Address & contractors |
| 2026-10-07 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Renewal Permit Without Changes · General Construction | $1M–5M | REMOVE EXISTING 200KW TURBINE GENERATOR AND EXISTING 350KWDIESEL ENGINE ON FIRST FLOOR. REMOVE EXISTING INTERIOR PARTITIONSIN ORDER TO ENLARGE ROOM FOR NEW ELECTRICAL SWITCH GEAR.P | 🔒 Address & contractors |
| 2026-10-07 | Queens · Glen Oaks-Floral Park-New Hyde Park | Initial Permit · Sprinklers | $1M–5M | Northwell LIJ Sprinkler Upgrade project - West Wing: sprinkler upgrades throughout building, as per plans filed herewith. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $5M–10M | General construction as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-07 | Manhattan · Gramercy | Renewal Permit with Changes · General Construction | $5M–10M | Conversion of Existing 12 story Office Building to Residential and Commercial Mixed Use | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Hell's Kitchen | Initial Permit · General Construction | $1M–5M | Interior renovation of Life Time Fitness. No change in egress, use or occupancy. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Wash. Houses 07, Ext Facade repairs: Repairs at exposed concrete slab/foundation wall, reconstruction of exterior wythe of cavity wall system, mortar joint repointing, masonry repa | 🔒 Address & contractors |
| 2026-10-06 | Brooklyn · East New York (North) | Initial Permit · Mechanical Systems | $1M–5M | K435- INSTALL NEW SPLIT COOLING SYSTEM /DUCTED SPLIT COOLING SYSTEM. NEW VENTILATORS, EXHAUST FANS, MAKEUP AIR UNIT. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · Mechanical Systems | $10M–50M | DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AIR HANDLING UNITS, FAN COIL UNITS, FANS. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $10M–50M | HUNTER COLLEGE NORTH BUILDING. RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-06 | Brooklyn · Gravesend (East)-Homecrest | Initial Permit · General Construction | $1M–5M | alteration application to do enlargement and interior and exterior renovations | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Replacement of existing water cooled centrifugal chillers on the 2nd floor with new with related piping and ductwork as per plans filed herewith. | 🔒 Address & contractors |
| 2026-10-06 | Queens · Rego Park | Initial Permit · Plumbing | $1M–5M | Q174- REPLACE ROOF DRAINS,FLOOR DRAINS & STORM PIPING WITH NEW. REPLACING SUMP PUMP WITH NEW. REMOVE EXISTING HW TANK, GAS PIPING, BOOSTER HEATER & ALL ITS APPURTENANCES. RELOCATE | 🔒 Address & contractors |
| 2026-10-06 | Queens · Long Island City-Hunters Point | Initial Permit · Mechanical Systems | $10M–50M | Provide new AHUs for each floor and associate duct work and VAV boxes. Provide dedicated kitchen exhaust and make-up air for the culinary lab. All plans filed as herewith. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | General construction as shown on plans. Work to include demolition and fit out of existing restaurant space. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit Without Changes · General Construction | $1M–5M | One story vertical extension on top of the existing 5-story mixed-use building, including facade repair, rehabilitation, and partial demolition on all floors, to convert to a resid | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Tribeca-Civic Center | Renewal Permit Without Changes · Plumbing | $1M–5M | Modifications of the plumbing fixtures for the Men's and Women's Bathrooms, No change of egress, use or occupancy. | 🔒 Address & contractors |
| 2026-10-06 | Bronx · Allerton | Initial Permit · General Construction | $1M–5M | Roofing replacement and rooftop structure renovation | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Facade repairs, FISP 9B repairs, as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-06 | Bronx · Mott Haven-Port Morris | Initial Permit · Support of Excavation | $1M–5M | SUPPORT OF EXCAVATION FOR RENOVATIONS TO THE EXISTING BUILDINGS, INCLUDING NEW FOUNDATIONS, ELECTRICAL UTILITIES, AND STORM WATER MANAGEMENT FACILITIES. EXCAVATION SUPPORT CONSISTS | 🔒 Address & contractors |
| 2026-10-06 | Bronx · Allerton | Initial Permit · General Construction | $1M–5M | Roofing replacement and rooftop structure renovation | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $5M–10M | NYU - Infrastructure Package - INFRASTRUCTURE MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH AND NEW ELEVATOR BULKHEAD. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | GENERAL CONSTRUCTION, COLUMN AND WALKWAY RESTORATION AS PER PLANS HEREWITH FILED. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | Architectural scope associated with the interior renovation of a duplex apt. 24A/25A located on 22-23FL levels. No Change of use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-06 | Bronx · Throgs Neck-Schuylerville | Renewal Permit Without Changes · General Construction | $5M–10M | X072- Exterior Masonry Repairs, Parapet Repairs, and Window Replacement | 🔒 Address & contractors |
| 2026-10-06 | Queens · Astoria (Central) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | MECHANICAL UPGRADES AND CHILLER REPLACEMENT ON ROOF AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | NYCHA EAST RIVER BOILERS CONSISTING OF GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · General Construction | $1M–5M | Facade repairs to include masonry, pointing, lintels, sills, coping stones, caulking, scrape, prime, and paint exposed steel. Vertical and horizontal concrete patching of cracks. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | EXTERIOR GENERAL CONSTRUCTION TAKING PLACE ON THE 20TH CONSTRUCTION FLOOR AND PENTHOUSE (21ST AND 22ND MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC | 🔒 Address & contractors |
| 2026-10-06 | Bronx · Wakefield-Woodlawn | Renewal Permit Without Changes · General Construction | $1M–5M | EXTERIOR RENOVATION INCLUDING ROOF WATERPROOFING SYSTEM AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQUIRED TO BE FILED SEPARATELY. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON FLOORS 7TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · Harlem (South) | Renewal Permit with Changes · General Construction | $1M–5M | FACADE REPAIR AND ROOF REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-06 | Manhattan · West Village | Initial Permit · Mechanical Systems | $1M–5M | Modification of mechanical on 3rd and 4th floor as per plans. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-06 | Brooklyn · Williamsburg | Initial Permit · General Construction | $1M–5M | PROPOSED ENLARGEMENT AND CONVERSION TO ONE STORY COMMERCIAL BUILDING TO MULTI FAMILY MIXED-USE. | 🔒 Address & contractors |
| 2026-10-05 | Brooklyn · Crown Heights (South) | Renewal Permit Without Changes · General Construction | $5M–10M | Masonry repairs and brick replacement, Roofing systems replacement , parapets replacement , bulkhead doors replacement . | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Interior fit up with new sales fixtures/finishes. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · Structural | $1M–5M | Herewith filing structural modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Harlem (North) | Renewal Permit Without Changes · General Construction | $5M–10M | Harlem Hospital, MLK Bldg exterior facade & roof level repairs as per the plans filed including: Removal, repairs/replacement of cracked masonry, stone cladding w/metal panel cladd | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Wash. Houses 06, Ext Facade repairs: Repairs at exposed concrete slab/foundation wall, reconstruction of exterior wythe of cavity wall system, mortar joint repointing, masonry repa | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | Facade repairs on the north and east elevations as shown on the drawings filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Murray Hill-Kips Bay | Initial Permit · Mechanical Systems | $1M–5M | Modifications to the existing HVAC system on the 20th and 21st floors (TD Securities- Marketing Floors 21 + 22) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Fit out of three floors with new ductwork and air conditioning units. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Mechanical Systems | $1M–5M | Demolition of existing steam chiller, and associated piping and accessories throughout the level 12 MER. Steam chiller 2 and piping distribution shall be replaced with new water so | 🔒 Address & contractors |
| 2026-10-05 | Brooklyn · Crown Heights (North) | Initial Permit · General Construction | $1M–5M | Proposed horizontal enlargement to an existing four (4) story + cellar community facility building. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · Plumbing | $1M–5M | REMOVE AND INSTALL NEW PLUMBING FIXTURES AND PIPING IN CONJUNCTION WITH ALT-CO #M01127304-I1. WORK ON FLOORS UG, SC1, CEL, 01-06, ROF, OSP. | 🔒 Address & contractors |
| 2026-10-05 | Manhattan · West Village | Initial Permit · Structural | $1M–5M | Installation of concrete columns to support the demolition and reconstruction of new double height floors for a proposed hospitality space. | 🔒 Address & contractors |
| 2026-10-05 | Queens · Jamaica | Initial Permit · General Construction | $10M–50M | PROPOSED ONE (1) NEW THIRTEEN (13) STORY MIX USED BUILDING WITH NINTY-NINE (99) DWELLING UNITS, COMMERCIAL AT THE CELLAR, GROUND, 3RD AND 4TH FLOOR LEVELS, AND PARKING AT THE GROU | 🔒 Address & contractors |
| 2026-10-02 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | OT- REMOVE & INSTALL NEW PARTITIONS, DOORS, CEILING & FINISHES. INSTALL ELEVATOR. REPLACEEXISTING & INSTALL NEW ADA RAMP ON GRADE. ST- REMOVE PORTION OF EXIST. FLOOR SLABS & BEAMS | 🔒 Address & contractors |
| 2026-10-02 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Removal and construction of interior partition, doors and ceiling as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Interior fit out of the 13th, 14th, and 16th Floors. No change to use, egress, or occupancy | 🔒 Address & contractors |
| 2026-10-02 | Queens · Auburndale | Initial Permit · General Construction | $1M–5M | work includes per the filed plans waterproofing in cellar including grout injection of foundation walls, crack and spall repairs, floor painting, limestone crack repair, lintel coa | 🔒 Address & contractors |
| 2026-10-02 | Queens · Jamaica | Renewal Permit Without Changes · Structural | $1M–5M | Exterior masonry cleaning, repair of cast stone, replacement of sealant, brick & stone repointing. Removal of existing and installation of new roof system and associated components | 🔒 Address & contractors |
| 2026-10-02 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · Mechanical Systems | $1M–5M | COMMERCIAL TENANT IMPROVEMENT (PAYPAL) ON SINGLE TENANT CONSTRUCTION FLOORS 6 THRU 8 (MARKETING FLOORS 7 THRU 9) MECHANICAL WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-02 | Staten Island · Great Kills-Eltingville | Renewal Permit Without Changes · General Construction | $5M–10M | Structural rehabilitation of the Existing Richmond Ave Pumping Station Pump Building. | 🔒 Address & contractors |
| 2026-10-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | GENERAL CONSTRUCTION RELATED TO INTERIOR OFFICE RENOVATION AT THE 23RD & 24TH FLOORS INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AS INDICA | 🔒 Address & contractors |
| 2026-10-02 | Bronx · Concourse-Concourse Village | Initial Permit · Structural | $1M–5M | Non mechanical removal of existing brick at all facades at 001-014 floors, in conjunction with Alt 1 filing X01097644.No change to use egress of occupancy | 🔒 Address & contractors |
| 2026-10-02 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · General Construction | $5M–10M | COMMERCIAL TENANT IMPROVEMENT (PAYPAL) ON SINGLE TENANT CONSTRUCTION FLOORS 6 THRU 8 (MARKETING FLOORS 7 THRU 9) INCLUDING CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, CEILINGS, FINI | 🔒 Address & contractors |
| 2026-10-02 | Queens · Oakland Gardens-Hollis Hills | Renewal Permit Without Changes · Plumbing | $1M–5M | 213Q - FILING HEREWITH FOR THE PLUMBING WORK RELATED TO THE FLOOD ELIMINATION UPGRADE FOR THIS SCHOOL. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. SPRINKLERPIPING TO BE RE | 🔒 Address & contractors |
| 2026-10-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | Interior fit out of the 15th Floor. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Queens · Jamaica | Renewal Permit Without Changes · General Construction | $1M–5M | Interior and exterior renovations | 🔒 Address & contractors |
| 2026-10-01 | Queens · Bayside | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Renewal Permit Without Changes · Plumbing | $1M–5M | INSTALLATION OF NEW AREA DRAIN AND REPAIR OF BROKEN STORM PIPE | 🔒 Address & contractors |
| 2026-10-01 | Staten Island · Tompkinsville-Stapleton-Clifton-Fox Hills | Initial Permit · General Construction | $1M–5M | FILING HEREWITH INTERIOR AND EXTERIOR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | NYU - Infrastructure MER - MER ADDITION ACCORDING TO PLANS FILED HEREWITH. MINOR CHANGE TO CERTIFICATE OF OCCUPANCY UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | OFFICE RENOVATION WORK TO INCLUDE PARTITIONS, DOOR, CEILLING,MILLWORK, FINISHES MODICATIONS TO FLOORS 1, MEZ, 2, 3 & 4 AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Murray Hill-Kips Bay | Renewal Permit with Changes · Structural | $1M–5M | TOWER EMERGENCY STRUCTURAL SHORING AND EXTERIOR LOCAL LAW 11 FACADE REPAIRS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-01 | Queens · Bayside | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Filing herewith interior renovations of existing 21st floor space. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | SCOPE INCLUDES SELECTIVE DEMOLITION AND INTERIOR ALTERATION OF THE 10THFLOOR AS NOTED ON PLAN. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · Mechanical Systems | $1M–5M | Filing for interior Mechanical modifications in retail space, including relocations of existing ductwork for new elevator shafts, HVAC to new electrical service rooms, install indo | 🔒 Address & contractors |
| 2026-10-01 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit with Changes · Standpipe | $1M–5M | IMC ED: PLUMBING, SPRINKLER AND STANDPIPE MODIFICATIONS TO ACCOMMODATE ALTERATIONS TO THE EXISTING EMERGENCY DEPARTMENT WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · Harlem (North) | Renewal Permit Without Changes · General Construction | $1M–5M | WORK ON THE ROOF AND EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-10-01 | Queens · Bayside | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Brooklyn · Williamsburg | Renewal Permit Without Changes · Sprinklers | $10M–50M | SPRINKLER AND STANDPIPE IN CONJUNCTION WITH NB 320917503 | 🔒 Address & contractors |
| 2026-10-01 | Brooklyn · Mapleton-Midwood (West) | Renewal Permit Without Changes · General Construction | $1M–5M | APPLICATION FILED TO PROPOSE NEW COMMUNITY FACILITY/HOUSE OF WORSHIP. | 🔒 Address & contractors |
| 2026-10-01 | Manhattan · West Village | Renewal Permit Without Changes · General Construction | $1M–5M | Interior cellar renovations of lounge, room, showers and toilets and locker rooms, first floor office and single used toilet room | 🔒 Address & contractors |
| 2026-10-01 | Bronx · Soundview-Clason Point | Initial Permit · Structural | $1M–5M | Partial replacement of the second floor structure between grid lines 1 and 6. | 🔒 Address & contractors |
| 2026-10-01 | Queens · Bayside | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical upgrades as related to updated Building Automation System as per plans. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-10-01 | Brooklyn · Sunset Park (West) | Initial Permit · Mechanical Systems | $1M–5M | HEREWITH FILING FOR MECHANICAL MODIFICATION FOR TENANT FITOUT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-30 | Bronx · Melrose | Renewal Permit Without Changes · General Construction | $1M–5M | SELECTIVE DEMOLITION OF EXISTING SITE RETAINING WALL AND CONSTRUCTION OF NEW CONCRETE SITE RETAINING WALL. | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Initial Permit · Mechanical Systems | $1M–5M | Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · East Harlem (North) | Initial Permit · General Construction | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · West Village | Renewal Permit Without Changes · General Construction | $1M–5M | General construction alterations on the 1st thru 5th floors and cellar level for proposed elevator modernization and change of use/occupancy; related work as per plans. | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · Murray Hill-Kips Bay | Initial Permit · General Construction | $5M–10M | Installation of new partitions, doors, ceilings and finishes on the 20th and 21st floors (TD Securities- 21st and 22nd Marketing Floors) as per plans. No change to use, egress or o | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · East Harlem (South) | Initial Permit · Structural | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-30 | Bronx · Claremont Village-Claremont (East) | Renewal Permit Without Changes · Structural | $10M–50M | Q148Q: Roof Replacement, Bulkhead Roofs, Parapets, Canopy, Roof Curbs. Remove, repair, replace, point Brick Work including Masonry Repairs. Replace Doors on 2nd flr and Bulkhead ro | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham | 🔒 Address & contractors |
| 2026-09-30 | Manhattan · East Village | Initial Permit · General Construction | $1M–5M | EXTERIOR REPAIR AND RESTORATION. NO CHANGE TO USE EGRESS NOR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-30 | Staten Island · Arden Heights-Rossville | Renewal Permit Without Changes · Plumbing | $1M–5M | SITE DRAINAGE & PLUMBING: REDIRECT SITE STORMWATER TO PROPOSED NEW DRYWELLS ON SITE; REMOVE AND REPLACE EXISTING STORM STRUCTURES AND PIPING. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Lobby renovation as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $5M–10M | General construction filed for removal and replacement of existing window glazing and sash within existing window openings on floors 44-53, as shown on plans herewith. No change in | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Filed herewith rear facade replacement. No change of use, occupancy or egress under this application | 🔒 Address & contractors |
| 2026-09-29 | Queens · Fresh Meadows-Utopia | Renewal Permit Without Changes · Plumbing | $1M–5M | J.S. 216-Q: PROPOSED PLUMBING WORK-NEW 4-STORY SCHOOL BUILDING. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · East Harlem (South) | Initial Permit · Structural | $1M–5M | SITE YARD WORK WITH 8' HIGH ENCLOSING FENCE AND GATES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Harlem (North) | Initial Permit · Structural | $1M–5M | Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Bronx · University Heights (South)-Morris Heights | Initial Permit · General Construction | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $5M–10M | WMC INTERIOR 4th Floor: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCC | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Castle Hill-Unionport | Initial Permit · General Construction | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-29 | Queens · Bayside | Initial Permit · Mechanical Systems | $1M–5M | Proposed installation of a new steam generator, a large heat exchanger supplied by the campus high-temperature hot water system. This unit is not a fuel-fired boiler. All as per pl | 🔒 Address & contractors |
| 2026-09-29 | Queens · Corona | Renewal Permit Without Changes · Support of Excavation | $1M–5M | Filing for support of excavation in conjunction with Q0067300-I1 and 440554302 as per plans filed herewith | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Mott Haven-Port Morris | Initial Permit · Structural | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Inwood | Initial Permit · Structural | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Melrose | Initial Permit · Structural | $1M–5M | Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · West Village | Renewal Permit Without Changes · General Construction | $1M–5M | Renovation of commercial building, No change in use egress or occupancy | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR RENOVATION AT CELLAR, 1ST TO 5TH FLOORS & ROOF. HORIZONTAL ENLARGEMENT OF SECOND FLOOR. INSTALLATION OF NON-LOAD BEARING INTERIOR PARTITIONS & CEILINGS, REPLACEMENT OF STA | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | WCM INTERIOR 4: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE CLINICAL PRACTICES RENOVATION IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 6th floor as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of air conditioning system, condensate pump, condenser water pumps, terminal boxes, air outlets and related ductwork/piping as per plans filed herewith. No change in u | 🔒 Address & contractors |
| 2026-09-29 | Queens · Springfield Gardens (North)-Rochdale Village | Renewal Permit Without Changes · General Construction | $1M–5M | Q400 - Existing School Building - Room #164 Convert Existing Auto Shop to New Aeronautics Lab and Classroom | 🔒 Address & contractors |
| 2026-09-29 | Brooklyn · Crown Heights (North) | Renewal Permit Without Changes · Plumbing | $1M–5M | Application filed for plumbing work in conjuntion with B01021153-I1. | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Mott Haven-Port Morris | Initial Permit · General Construction | $1M–5M | To be reviewed with Development HUB. Alt II filing for renovation of existing waste yard - demo of existing concrete slab, knee wall ,fences, gates. New concrete slab, knee wall, 8 | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. No change to use egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Morrisania | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Riverdale-Spuyten Duyvil | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATION OF AN EXISTING ONE- FAMILY RESIDENCE. NEW INTERIOR PARTITIONS AND FINISHES. NEW WINDOWS AND DOORS IN EXISTING OPENINGS. MODIFICATION TO EXISTING CERTIFICATE OF | 🔒 Address & contractors |
| 2026-09-29 | Bronx · Castle Hill-Unionport | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 36th & 40th floors (Ares- Buildout Phase) as per plans. No change to use, egress | 🔒 Address & contractors |
| 2026-09-29 | Brooklyn · Brownsville | Initial Permit · Structural | $1M–5M | Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | APPLICATION FILED FOR LOCAL LAW FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-29 | Brooklyn · Crown Heights (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | (AHU) AIR HANDLING UNIT REPLACEMENT AND REPLACEMENT OF ROOFTOP EXHAUST FANS. INSTALLATION OF NEW CONDENSING UNIT ON THE ROOF. | 🔒 Address & contractors |
| 2026-09-29 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | HUB ACCEPTED- Exterior Installation of temporary structure for 90 days, Temp Structure to be removed after duration for LOC issuance no change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-29 | Brooklyn · Sunset Park (West) | Initial Permit · General Construction | $1M–5M | Alt. CO filed to Convert Existing Coffee Roasting Facility to Artists Studio; Provide New Roof, New Skylights, and new Interior Partitions. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Tribeca-Civic Center | Initial Permit · Mechanical Systems | $1M–5M | Modifications to HVAC system in BNY Lobby Level (1st Floor Entry) and atrium, including alteration to ducts and piping, and the addition of new units, as per plans. No change to us | 🔒 Address & contractors |
| 2026-09-28 | Queens · Astoria (North)-Ditmars-Steinway | Initial Permit · General Construction | $1M–5M | INSTALLATION OF NEW CONCRETE FOUNDATIONS FOR ELECTRICAL EQUIPMENT AND PRIVATE ASPHALT DRIVEWAY AT CON EDISON'S ASTORIA WEST SUBSTATION. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Midtown-Times Square | Initial Permit · Structural | $1M–5M | Facade repairs as per plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Bronx · Morris Park | Renewal Permit Without Changes · General Construction | $1M–5M | MONTEFIORE - LABOR AND DELIVERY COSMETIC REFRESH - GENERAL CONSTRUCTION INCLUDING DEMO TO EXISTING FLOOR FINISHES, CEILING, DOORS AND PARTITIONS AND NEW DOORS, FLOORS, CEILINGS. AN | 🔒 Address & contractors |
| 2026-09-28 | Brooklyn · Greenpoint | Renewal Permit Without Changes · General Construction | $1M–5M | HEREWITH FILING FITOUT TO NB(B00772431-I1) ARCHITECTURAL WORK AS PER PLANS. NO CHANG TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit Without Changes · General Construction | $1M–5M | Interior renovation proposed for an existing penthouse. PAA filed for omission of Fire-Resistant Penetration and Joints as a special inspection No change to use, occupancy or egres | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | Architectural modifications for plaza renovation as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Brooklyn · South Williamsburg | Initial Permit · Structural | $1M–5M | Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Queens · East Flushing | Renewal Permit Without Changes · General Construction | $1M–5M | Facade repairs as per plans; no change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Brooklyn · East New York-New Lots | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work on the facade, 1st, 2nd and roof as indicated on drawings. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Harlem (North) | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work filed in conjunction with GC application. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Queens · John F. Kennedy International Airport | Renewal Permit Without Changes · Mechanical Systems | $10M–50M | FILING HEREWITH CONTRACT JA-179: INSTALLATION OF MECHANICAL AND ELECTRICAL EQUIPMENT, INCLUDING BLACK START GENERATOR (1), STANDBY GENERATORS (2), SYNCHRONIZING SWITCHGEAR, AND STA | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · West Village | Renewal Permit with Changes · General Construction | $1M–5M | INTERIOR/EXTERIOR WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · East Village | Initial Permit · General Construction | $1M–5M | Filing for IPNA repairs as per plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $1M–5M | Interior build-out of existing apt #PH-36W, as per plans filed herewith. Work to include minor non-structural demolition, general construction and related finishes. No change in us | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | GENERAL CONSTRUCTION TAKING PLACE ON CEL,1ST & 14TH FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $1M–5M | Interior renovation of an existing duplex. No change to use, occupancy or egress. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Mechanical work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-28 | Staten Island · Great Kills-Eltingville | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Provide intermittent ventilation of Pump Building Screen Room, Fan Room, Mechanical Room No.1; Electric heaters for Electrical Room, Generator Room, Future Generator Room, ATS Room | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $10M–50M | Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Modifications to existing HVAC system and piping including installation of new AC units for new office tenant. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | Demolition of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Modification to existing ductwork and installation of AC units as per plans filed herewith. 15,16,17,18 Construction vs 17,18,19 & 20 Marketing | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit Without Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS BEEN FILLED HEREWITH. | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $10M–50M | Interior office fit out of 15th through 18th floors including open office, private offices, restroomrenovation, new unisex powder rooms, wellness rooms, conference rooms, non cooki | 🔒 Address & contractors |
| 2026-09-28 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | HEREWITH TO PROPOSE INTERIOR RENOVATION OF 3RD. FLOOR OF EXISTING OFFICE BUILDING. NO CHANGES IN OCCUPANCY, USE GROUP OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-09-28 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Initial Permit · Mechanical Systems | $1M–5M | Install new AHU-1 w/ DC-1 and AHU-2; modify ductwork & hot/chilled-water piping; add exhaust fans, diffusers/grilles, dampers, controls & duct smoke detector; UV disinfection; seal | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL WORK ON THE SUBCELLAR2, SUBCELLAR1, CELLAR AND 1ST FLOOR, AS SHOWN ON DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Tribeca-Civic Center | Initial Permit · General Construction | $1M–5M | Minor Interior demolition and white box of existing office space, including removal of ceilings, doors, floors, and partitions on the 3rd & 4th Floors (BNY), as per plans. No chang | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Respectfully filing herewith for GC work as per plans. No change to use, egress or occupancy on this application. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Construction work on the 10th floor (Dubin & Co.) as indicated on drawings. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $10M–50M | GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | MECHANICAL MODIFICATIONS TAKING PLACE ON 25TH FL CONSTRUCTION (26TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Gramercy | Renewal Permit Without Changes · General Construction | $1M–5M | HEREWITH FILING FOR PARTIAL INTERIOR RENO AT GD FL,REMOVAL/INSTALL OF NON-LOAD BEARING PARTITIONS, FIX+ FINISHES FOR EX BOOKSTORE TB CONVERTED TO WELCOME CENTER/ONE-STOP SHOP FOR S | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | 9th Cycle Facade Repair Program. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Installation of new interior finishes, lighting, glass guardrail at perimeter curtain wall. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Harlem (North) | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work filed in conjunction with GC application. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Harlem (South) | Initial Permit · General Construction | $1M–5M | PARTIAL REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND NEW FINISHES AS PER PLANS ON THE MAIN HOSPITAL FLOOR 6 OF WING 'A'. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | Removal and installation of non load bearing partitions as per plans filed herewith. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-25 | Brooklyn · Prospect Lefferts Gardens-Wingate | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | KINGS COUNTY HOSPITAL CENTER - ED EXPANSION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-25 | Bronx · Bedford Park | Renewal Permit Without Changes · General Construction | $1M–5M | Application filed for Interior renovation of public toilets and adjoining spaces, including removal and installation of nonbearing partitions, fixtures and finishes. no change is p | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of a new HVAC system on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · SoHo-Little Italy-Hudson Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical modifications taking place on the 6-7th floors as indicated on the drawings. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | alterations to existing mechanical systems as per plans filed herewith | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | AT 28TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | Interior renovation of an existing commercial office floor. 30TH CONSTRUCTION FLOOR (32ND MARKETING FLOOR). no change in use, occupancy, egress or occupancy. Proskauer build out p | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Interior renovation of the 12 through 14 floors totaling approx. 27,008 square feet as per plans. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | Architectural modifications taking place on the 1st floor (lobby) as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Modification to existing HVAC systems as per plans filed herewith. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | General construction for Jenner & Block space on 28th marketing floor (27th construction) | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Mechanical, taking place on the Mezz, 2nd, 3rd floor as per plans filed herewith. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · SoHo-Little Italy-Hudson Square | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR BUILD OUT OF OFFICE SPACE AS PER PLANS. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Modifications to the existing HVAC system on the 17th Floor (Industrious), as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Interior renovation of existing office space with the installation of ceilings, floors, partitions, and finishes on the 17th Floor (Industrious), as per plans. No change to use, eg | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | General construction modifications taking place on the 32nd floor as per plans filed herewith. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Brooklyn · Clinton Hill | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR AND EXTERIOR CHURCH RENOVATION INCLUDING ROOF, WINDOWS WORK, AND NEW ELEVATOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-25 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $10M–50M | Interior renovations as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Harlem (South) | Renewal Permit Without Changes · General Construction | $50M+ | PROPOSED 21-STORY MIXED-USE BUILDING W/ 180 D.U. & COMMERCIAL STORE AT GROUND FLOOR LEVEL | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Modify mechanical ductwork and related piping. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | Installation of new partitions, doors, ceilings and finishes on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Bronx · Norwood | Renewal Permit Without Changes · General Construction | $1M–5M | Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress. | 🔒 Address & contractors |
| 2026-09-24 | Bronx · Mount Hope | Initial Permit · General Construction | $1M–5M | Removal of all concrete and/or asphalt paving within the play areas, regrading of play areas, installation of playground equipment, site furnishings, safety mats, enclosed storage | 🔒 Address & contractors |
| 2026-09-24 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit Without Changes · General Construction | $1M–5M | NYCHA/Gowanus/B1-Interior reno. incl. repl. of kitchen & bath fixtures, finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504 fo | 🔒 Address & contractors |
| 2026-09-24 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Initial Permit · Mechanical Systems | $1M–5M | Replacement of existing mechanical equipment (boilers, vacuum pumps, exhaust fans, valves) as shown on plans. No change to use and egress. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit Without Changes · General Construction | $1M–5M | Hereby filing related architectural construction on basement, 1st and roof levels in support of replacement of rooftop emergency generator and associated equipment. No change to u | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-24 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit Without Changes · General Construction | $1M–5M | NYCHA/Gowanus/Bldg4W- Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibility work per BC-Ch.11 & Section504 for | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Mechanical work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Hell's Kitchen | Initial Permit · General Construction | $1M–5M | Interior reno of 42 units consisting of existing 1 bedroom apt units 2 bedroom apt units and studio apt units to meet or exceed UFAS compliance as indicated on drawings. Minor reco | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Structural | $1M–5M | Structural work as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | WCM 2 & 3: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-24 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit Without Changes · General Construction | $1M–5M | NYCHA/Gowanus/Bldg#6- (195 Hoyt Street/413 Baltic Street). Int. reno. incl. repl. of kitchen & bath fixt., finishes, & cab.; upgrades to doors, partitions, & flooring. Accessibilit | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Structural | $1M–5M | STRUCTURAL WORK FROM THE 13TH THRU THE 14TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th f | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st, 41st & 42nd floors (Ares- Buildout) as per plans. No change to use, egress | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Queens · Far Rockaway-Bayswater | Renewal Permit Without Changes · Earth Work | $5M–10M | Architectural/ structural park improvements as per plans. Work includes Flagpole, Boardwalk, sloped walkway, boulder wall. Flood lights, play ground, kayak station. Filed in Conjun | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of a new HVAC system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · Structural | $1M–5M | Structural work as shown on plans | 🔒 Address & contractors |
| 2026-09-24 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · Earth Work | $1M–5M | REMOVE EXISTING ASPHALT PAVEMENT, LANDSCAPING, AND PARTIAL REMOVAL OF SITE WALL. REMOVE AND REPLACE EXISTING STORM INLETS. RESTORE ASPHALT PAVEMENT IN DISTURBED AREAS. Excavate to | 🔒 Address & contractors |
| 2026-09-24 | Queens · Far Rockaway-Bayswater | Initial Permit · General Construction | $5M–10M | Complete Renovation of Natatorium including Pool & Spectator Area. Complete Renovation of Locker Rooms, Shower/Dressing Rooms, and Toilet Areas. Installation of new Pool Filtration | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL MODIFICATIONS TO 13TH THRU 15TH FLOOR AND 18TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-24 | Bronx · Pelham Gardens | Initial Permit · General Construction | $1M–5M | Remove and replace existing BUR roof and provide New Cold-Applied SBS- Modified Roofing System and Insulation. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Initial Permit · Structural | $1M–5M | Structural modifications: install new structural steel framing and removal of slab on the 23 (CO)/ 24 (Mktg) Floor as per plans (Latham & Watkins.) No change to use, egress or occu | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Renewal Permit with Changes · Mechanical Systems | $5M–10M | MECHANICAL WORK IN CONJUNCTION WITH OFFICE RENOVATION FOR TENANT (BAIN & COMPANY) AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-24 | Queens · Fresh Meadows-Utopia | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | PROVIDE A/C SPLIT COOLING SYSTEM & MINI CONDENSATE PUMP. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Tribeca-Civic Center | Renewal Permit with Changes · General Construction | $1M–5M | JOB ACCEPTED TO CDU ON 5/7/25. FILING FOR CHANGE OF OCCUPANCY FROM J-3 RECTORY TO J-1 (R-1) ROOMING UNITS AS PERMITTED BY HMC 27-2077. INTERIOR RENOVATIONS ON FLOORS SUB, CEL, MEZ, | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Morningside Heights | Initial Permit · Mechanical Systems | $10M–50M | Modifications to mechanical systems as per plans filed herewith. No change to use, occupancy or egress. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · Sprinklers | $1M–5M | VC SP: SPRINKLER MODIFICATIONS WITHIN THE EXISTING VANDERBILT CLINIC AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $10M–50M | General construction as shown on plans filed herewith. No change in use, egress, and occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $10M–50M | General construction as shown on plans filed herewith. No change in use, egress, and occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · West Village | Initial Permit · Mechanical Systems | $1M–5M | Mechanical modification of floors 3 thru 5 for Guestrooms as per plans No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Remove and replace exterior soffit at drum floors with new metal panel system, also, floors are the mechanical windbreak floors open to outside. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Modifications to the existing HVAC System: Install new ductwork, diffusers, and FCU and associated piping on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham & Watkins.) | 🔒 Address & contractors |
| 2026-09-24 | Brooklyn · Sunset Park (West) | Renewal Permit Without Changes · Sidewalk Shed | $1M–5M | INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and replacement of pavers at 3rd floor plaza and exterior stairs leading up at 1st-3rd. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $5M–10M | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-24 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Interior renovation as per plans filed herewith. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | HVAC modifications for rooftop amenity as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Staten Island · Annadale-Huguenot-Prince's Bay-Woodrow | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for roof replacment & concrete patching as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | Interior alterations to the 10th and 11th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $1M–5M | GENERAL CONSTRUCTION WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILINGS FLOORS 1-10 AS SHOWN ON PLANS, EXTERIOR WORK RELATED TO NEW FIRE E | 🔒 Address & contractors |
| 2026-09-23 | Staten Island · Grasmere-Arrochar-South Beach-Dongan Hills | Initial Permit · General Construction | $5M–10M | Filing for interior partitions (non-load bearing) & renovations No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | INTERIOR MECHANICAL WORK TAKING PLACE ON THE 20TH CONSTRUCTION FLOOR AND PENTHOUSE (21ST AND 22ND MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-23 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $1M–5M | General construction on floors MZ2, 5 and 7 as per plans filed herewith. No changes in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Village | Initial Permit · Plumbing | $1M–5M | Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress. | 🔒 Address & contractors |
| 2026-09-23 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Harlem (South) | Renewal Permit with Changes · General Construction | $1M–5M | THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-23 | Queens · Maspeth | Initial Permit · General Construction | $1M–5M | IT IS PROPOSED TO ENLARGE EXISTING BUILDING (HORIZONTAL) BY 20,600 OF EXISTING STORAGE FACILITY. | 🔒 Address & contractors |
| 2026-09-23 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $5M–10M | Facade overclad as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Brooklyn · Coney Island-Sea Gate | Renewal Permit Without Changes · General Construction | $1M–5M | FILING HEREWITH GENERAL CONSTRUCTION WORK ASSOCIATED WITH INSTALLATION OF BATTING CAGE STRUCTURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | INSTALLATION OF TWO NEW COGEN ENGINES. | 🔒 Address & contractors |
| 2026-09-23 | Staten Island · Westerleigh-Castleton Corners | Renewal Permit Without Changes · General Construction | $1M–5M | HEREWITH FILING FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE TO USE, OCCUPANY, OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-09-23 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Lower East Side | Initial Permit · General Construction | $1M–5M | Filing herewith interior renovation, removal, and installation of non-load-bearing partitions, doors, ceilings, and floors as per plans. | 🔒 Address & contractors |
| 2026-09-23 | Brooklyn · Fort Greene | Renewal Permit Without Changes · General Construction | $1M–5M | Renovation of the BPL Walt Witman Library, architectural plans filed herewith. removal and relocation of elevator tower and egress stair | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Structural | $1M–5M | Structural modifications for plaza renovation as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Structural | $1M–5M | Structural modifications (Rooftop Amenity) as per plans. No change to use ,egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Queens · Rego Park | Renewal Permit Without Changes · Mechanical Systems | $10M–50M | Mechanical systems and work related to New Building Application Q00713415-I1 | 🔒 Address & contractors |
| 2026-09-23 | Queens · Murray Hill-Broadway Flushing | Renewal Permit Without Changes · General Construction | $10M–50M | Q189_Remove and replace parapets, roofs, and exterior masonry. Provide flood elimination. | 🔒 Address & contractors |
| 2026-09-23 | Brooklyn · East Williamsburg | Initial Permit · General Construction | $1M–5M | HEREBY FILING TO ENLARGE AN EXISTING 2 STORY COMMERCIAL BUILDING INTO A 6 STORY, MIXED USE BUILDING WITH 8 DWELLING UNITS & 1 COMMERCIAL UNIT | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical modifications on floors MZ2, 5 and 7 as per plans filed herewith. No changes in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-23 | Queens · College Point | Renewal Permit Without Changes · Plumbing | $1M–5M | Plumbing for interior renovation | 🔒 Address & contractors |
| 2026-09-23 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · Plumbing | $5M–10M | NYU - Infrastructure Package - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-23 | Bronx · Soundview-Clason Point | Renewal Permit Without Changes · Construction Fence | $10M–50M | Installation of a temporarily heavy-duty sidewalk shed and construction fence with netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in u | 🔒 Address & contractors |
| 2026-09-23 | Queens · Fresh Meadows-Utopia | Initial Permit · Structural | $1M–5M | Related ST/FO work | 🔒 Address & contractors |
| 2026-09-22 | Queens · John F. Kennedy International Airport | Renewal Permit Without Changes · Structural | $1M–5M | FILING HEREWITH CONTRACT JA-179: JAMAICA WRRF STRUCTURAL ACTIVITIES AS PER SUBMITTED PLANS. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Village | Initial Permit · Mechanical Systems | $1M–5M | REPLACEMENT OF EXISTING STEAM CONTROL VALVES, STEAM RADIATOR SHUT-OFF VALVES, HEATING AND VENTILATION UNIT AND STEAM TRAPS | 🔒 Address & contractors |
| 2026-09-22 | Staten Island · Grasmere-Arrochar-South Beach-Dongan Hills | Renewal Permit Without Changes · General Construction | $1M–5M | HEREWITH FILING FOR 2ND FLR INTERIOR RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · Construction Fence | $1M–5M | CONSTRUCTION FENCE TO SUPPORT INSTALLATION OF COGEN ENGINES. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Washington Heights (South) | Initial Permit · General Construction | $1M–5M | HP4: Modifications to interior partitions and finishes to accommodate alterations for the HP Blood Bank within the existing hospital building as per plans. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. IN-KIND REPLACEMENT OF TREADS AT EXISTING CONVENIENCE STAIRS. NO CH | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · Structural | $1M–5M | Constructing CHP platform at Bellevue Hospital. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Removal and installation of interior non bearing partitions. Scope of Work includes Partial Demolition, New MEP and Structure. No change in use, egress or occupancy under this appl | 🔒 Address & contractors |
| 2026-09-22 | Queens · Bay Terrace-Clearview | Initial Permit · Mechanical Systems | $1M–5M | MODIFICATIONS TO EXISTING MECHANICAL SYSTEM RELATED TO PROPOSED WORKOUT FACILITY. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Harlem (North) | Renewal Permit with Changes · General Construction | $1M–5M | Application filed for window replacements at all floors 6-35, as per drawings filed herewith. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF WALLS, DOORS,CEILINGS AND FINISHES AS PER PLANS ON THE MAIN HOSPITAL 3RD FLR WING 'A' PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLIC | 🔒 Address & contractors |
| 2026-09-22 | Bronx · Morris Park | Initial Permit · Mechanical Systems | $1M–5M | INSTALLATION OF A VENTILATION SYSTEM TO CREATE A CLEANROOM ON THE 12TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · Structural | $1M–5M | CONCRETE REPAIR OF BALCONY CURBS AND SLABS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Village | Initial Permit · Plumbing | $1M–5M | Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION TAKING PLACE ON THE 32ND FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-22 | Bronx · Mount Eden-Claremont (West) | Initial Permit · General Construction | $1M–5M | Full program accessibility involves a new passenger elevator addition serving all floors - cellar-4 fl and EMR room. Provide new fire rescue area rooms, accessible toilets, modify | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Full Demolition | $1M–5M | full demolition of two story structure using hand held with mechanical to assist | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Full Demolition | $1M–5M | full demolition of four story structure using hand held with mechanical to assist on grade. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Harlem (North) | Initial Permit · Plumbing | $1M–5M | REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-22 | Brooklyn · Marine Park-Mill Basin-Bergen Beach | Renewal Permit Without Changes · General Construction | $1M–5M | Program Accessibility: building alterations related to accessibility upgrades: provide new elevator, ramps, toilets, partitions, finishes and other work as per drawings. No change | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Midtown-Turtle Bay | Renewal Permit with Changes · Mechanical Systems | $1M–5M | Filing herewith to replace existing HVAC equipment in the central cooling plant. | 🔒 Address & contractors |
| 2026-09-22 | Brooklyn · Brighton Beach | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS AT THE ROOF, NORTH, SOUTH, EAST, AND WEST, INCLUDING BALCONY STRUCTURAL REPAIRS AND PARAPET WALL REPLACEMENT AS PER PLANS FILED HE | 🔒 Address & contractors |
| 2026-09-22 | Bronx · Soundview-Bruckner-Bronx River | Renewal Permit Without Changes · General Construction | $1M–5M | Architectural filing for swimming pool renovation. Provide a new tile finished concrete ramp to correct the existing non-compliant threshold at Girl's ADA Toilet | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Upper West Side-Manhattan Valley | Renewal Permit Without Changes · General Construction | $1M–5M | Facade and cornice repair/reconstruction to include balusters, pointing, limestone, and terracotta patching, caulking | 🔒 Address & contractors |
| 2026-09-22 | Bronx · Norwood | Initial Permit · General Construction | $1M–5M | Interior removals of partitions, ceilings and finishes | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | INTERIOR GENERAL CONSTRUCTION TAKING PLACE ON THE 20TH CONSTRUCTION FLOOR AND PENTHOUSE (21ST AND 22ND MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC | 🔒 Address & contractors |
| 2026-09-22 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit with Changes · Support of Excavation | $5M–10M | SOE WORK AS SHOWN ON PLANS. | 🔒 Address & contractors |
| 2026-09-22 | Brooklyn · Williamsburg | Renewal Permit Without Changes · General Construction | $1M–5M | ALT-CO - NB APPLICATION FILED FOR 4-STORY, THREE DWELLINGS WITH CELLAR. | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-22 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-22 | Queens · Woodside | Renewal Permit Without Changes · Plumbing | $1M–5M | Connect to existing building water connection with new dedicated meter for water distribution. Connect new sanitary to existing sanitary lines. Distribute hot water from cellar hot | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · East Harlem (North) | Renewal Permit Without Changes · Structural | $1M–5M | Application filed for GC/ST for emergency generator installation in open space, as per drawings filed herewith. | 🔒 Address & contractors |
| 2026-09-21 | Queens · Jamaica | Initial Permit · General Construction | $5M–10M | The design aims to minimize interventions in the Plazas reconstruction and repair. Key upgrades and repairs include drainage, waterproofing, structural slabs, granite pavers, plant | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Plumbing | $5M–10M | Plumbing work associated with Alt-CO as shown on plans. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Removal and replacement of glycol water supply and return lines for the heat exchange system, including installation of new heat pumps and associated backup pumps and piping NO CHA | 🔒 Address & contractors |
| 2026-09-21 | Staten Island · West New Brighton-Silver Lake-Grymes Hill | Initial Permit · General Construction | $1M–5M | SLB Bldg-ARCHITECTURAL WORK FOR PROPOSED ROOF REPLACEMENT FOR SLB BUILDING -- 3RD FLOOR AND 5TH FLOOR ROOF SETBACKS-- LOCATED AT RICHMOND UNIVERSITY MEDICAL CENTER. ALL AS PER PLA | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Full Demolition | $1M–5M | full demolition of four story structure using hand held with mechanical to assist. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | PROPOSED NEW RESTAURANT WITH PARTITION WORK AT CELLAR, 1ST FLOOR, MEZZANINE. INSTALL NEW HOODS AND EXHAUST SYSTEM IN COMMERCIAL KITCHEN. INSTALL NEW HVAC SYSTEM. NO CHANGE IN USE | 🔒 Address & contractors |
| 2026-09-21 | Staten Island · Freshkills Park (South) | Initial Permit · General Construction | $1M–5M | New foundation and Structural work for service building. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · East Village | Initial Permit · Mechanical Systems | $1M–5M | Replacement and installation of new mechaical equipment as shown on plans. | 🔒 Address & contractors |
| 2026-09-21 | Staten Island · Oakwood-Richmondtown | Renewal Permit Without Changes · Plumbing | $1M–5M | RPZ replacements, construction of a new water supply loop to improve water distribution through the facility. Connection of water loop to Dewatering Building. | 🔒 Address & contractors |
| 2026-09-21 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · General Construction | $10M–50M | Proposed 24 story residential and commercial building. Building #362 and #372 (on single zoning lot) filed under separate applications | 🔒 Address & contractors |
| 2026-09-21 | Bronx · Co-op City | Renewal Permit Without Changes · General Construction | $50M+ | Construct new two (2) story community facility building as per plans filed. | 🔒 Address & contractors |
| 2026-09-21 | Queens · Rego Park | Initial Permit · Support of Excavation | $1M–5M | SOE FILING IN CONJUNCTION WITH NEW BUILDING | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Mechanical Systems | $1M–5M | Replacement of air handling units on the 15th and 16th floor as indicated on drawings. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · Plumbing | $1M–5M | Filing for exterior Plumbing infrastructure upgrades, including sanitary drainage lines and treated water supply to/from cooling tower. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · East Harlem (North) | Renewal Permit Without Changes · General Construction | $1M–5M | Application filed for window replacements at all floors 6-35, as per drawings filed herewith. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Interior Gut and renovation of the 4th floor. No changes to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · East Harlem (North) | Renewal Permit with Changes · General Construction | $1M–5M | Application filed for window replacements at all floors 6-35, as per drawings filed herewith. | 🔒 Address & contractors |
| 2026-09-21 | Queens · Long Island City-Hunters Point | Renewal Permit Without Changes · Sprinklers | $5M–10M | New water, gas, sanitary, and lab systems with booster, heaters, pH skid; reroute piping. New wet, dry, pre-action sprinklers with alarm valve for basement, rooftop AHUs, generator | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Morningside Heights | Renewal Permit Without Changes · Sprinklers | $1M–5M | MSM SP N - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-21 | Brooklyn · Park Slope | Renewal Permit Without Changes · Sprinklers | $1M–5M | PLUMBING AND SPRINKLER MODIFICATIONS TO THE POST-NATAL UNIT ON THE 5TH FLOOR IN THE EXISTING CARRINGTON PAVILION HOSPITAL BUILDING. NO CHANGE, USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION TAKING PLACE ON FLOORS 1-4 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-21 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-18 | Queens · Richmond Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of HVAC including related ductwork on first, second and third floors in Building Segments 3, 6, 7, 10, 11, 12, 13, 16, 17 and 18 and related dunnage and FDNY access ac | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | Interior renovations has shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-18 | Brooklyn · Sheepshead Bay-Manhattan Beach-Gerritsen Beach | Renewal Permit with Changes · Mechanical Systems | $1M–5M | P.S. 206-K: MECHANICAL WORK TYPE | 🔒 Address & contractors |
| 2026-09-18 | Staten Island · West New Brighton-Silver Lake-Grymes Hill | Renewal Permit Without Changes · General Construction | $1M–5M | ALT-CO (MAJOR ALT) FILED FOR PROPOSED VERTICAL & HORIZONTAL EXTENSION TO EXISTING 3 STORY RESIDENCE. NEW ROO, ROOF TERRACE LEVEL. NO CHANGE IIN USE OR OCCUPANCY. INCREASE IN FLOOR | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | Interior renovation as per plans filed herewith. | 🔒 Address & contractors |
| 2026-09-18 | Bronx · Longwood | Initial Permit · Mechanical Systems | $1M–5M | remove &replace existing exhaust fans on roof and provide new curbs, extensions as shown in the drawings. remove and replace split ac units in kind. No change in use, egress , or o | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Financial District-Battery Park City | Initial Permit · Plumbing | $1M–5M | Plumbing work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-18 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · General Construction | $5M–10M | HEREWITH FILING INTERIOR RENOVATIONS WITHIN AN EXISTING SCHOOL AS PER PLANS FILED HEREWITH NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED. | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Financial District-Battery Park City | Initial Permit · Plumbing | $1M–5M | Plumbing work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Modification/additions to existing HVAC system and related ductwork/piping. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Upper West Side (Central) | Initial Permit · General Construction | $1M–5M | PROPOSED BUILD-OUT FOR NEW EATING AND DRINKINGESTABLISHMENT. NEW PARTITION WALLS, FIRESTOPPING,FLOOR AND CEILING FINISHES, FIRE PROOF DOORS,EMERGENCY AND EXIT LIGHTSNO CHANGE IN U | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | FACADE RENOVATION IS LIMITED TO FLOORS 1, 2, AND 3 ONLY, REMOVAL OF DIRECT APPLIED EXISTING STONE & CERAMIC TILE & SELECT AREAS OF CURTAIN WALL & A MARQUEE ON THE PARK AVENUE SOUT | 🔒 Address & contractors |
| 2026-09-18 | Bronx · West Farms | Initial Permit · Full Demolition | $1M–5M | full demolition of 6 story structure, using hand held and mechanical means to assist | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Full Demolition | $1M–5M | full demolition of four story structure, using hand held with mechanical assist | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Gramercy | Renewal Permit Without Changes · Plumbing | $5M–10M | Modifications to existing Plumbing System related to Guestrooms renovation. | 🔒 Address & contractors |
| 2026-09-18 | Queens · Maspeth | Renewal Permit Without Changes · General Construction | $1M–5M | NEW 3 STORY MIXED USE BUILDING. (5) OPEN CAR PARKING SPACES. (7) ENCLOSED BICYCLE PARKING SPACES. | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $1M–5M | The Proposed project is adding this portion (146 E 62nd St.) to the existing Mellon foundation building (136-144 E 62nd St.). New Rear extension and elevator and stair bulkhead and | 🔒 Address & contractors |
| 2026-09-18 | Brooklyn · Borough Park | Renewal Permit with Changes · General Construction | $1M–5M | VERTICAL & HORIZONTAL ENLARGEMENT TO EXISTING 2 STORY BUILDING | 🔒 Address & contractors |
| 2026-09-18 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · Upper East Side-Yorkville | Initial Permit · General Construction | $1M–5M | HEREBY FILING FOR DISTRIBUTION SYSTEM UPGRADE. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS, UNITS AND LETTERED, A, B, C, D, E, F, G, H, J, K, L, M, N, P, & Q = 15 UNITS PER FLOOR THERE IS N | 🔒 Address & contractors |
| 2026-09-17 | Staten Island · Mariner's Harbor-Arlington-Graniteville | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Provide intermittent ventilation of Wet Well and Screen Room, Dry Well Pump Room, Valve Room and Access Room; Electric heaters for Dry Well Pump Room, Valve Room and Access Room. P | 🔒 Address & contractors |
| 2026-09-17 | Queens · Woodhaven | Initial Permit · General Construction | $1M–5M | Repair/repoint select areas of damaged exterior brick and stone; Remove existing coatings on brick and replace with new breathable coating; Repair copper bulkhead roofs; Repair/rep | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | Interior Renovation and new demising wall on part of 1st floor | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · West Village | Renewal Permit with Changes · General Construction | $1M–5M | Amending occupant loads and layout for the theater and relocating an exit. | 🔒 Address & contractors |
| 2026-09-17 | Staten Island · Westerleigh-Castleton Corners | Renewal Permit with Changes · General Construction | $1M–5M | three story community facility with parking for 16 cars | 🔒 Address & contractors |
| 2026-09-17 | Brooklyn · Bushwick (East) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Install new modulating Gas Burners, replace existing hot water pumps with variable speed motors & install 2-way control valves each floor. provide heating controls. Demo existing | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Interior renovation of 33rd floor including new fixture, furniture, and finishes. New communication stairs between 33rd and 34th floor. No change in use, egress, or occupancy Ducer | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · East Village | Initial Permit · Structural | $1M–5M | Repair of existing piers and beams supporting ground floor | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Structural | $1M–5M | Structural work as shown on plans | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · East Village | Renewal Permit Without Changes · Structural | $1M–5M | Repair of existing slabs, beams, and piers supporting ground floor | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Remedial Facade work associated with FISP Cycle 10A as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-17 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · Mechanical Systems | $5M–10M | INSTALLATION OF MECHANICAL EQUIPMENT AND PIPING AS PER PLANS | 🔒 Address & contractors |
| 2026-09-17 | Brooklyn · Sunset Park (Central) | Renewal Permit Without Changes · General Construction | $1M–5M | PROPOSED ENLARGEMENT EXITING 2 STORY RESIDENTIAL USE BUILDING TO 5 STORY COMMUNITY FACILITY AND RESIDENTIAL MIXED USE BUILDING, WORK ON CELLAR, 1ST~5TH FLOOR AND ROOF, OBTAIN NEW | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Interior renovation as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-16 | Brooklyn · Fort Greene | Renewal Permit Without Changes · Plumbing | $1M–5M | ADA upgrade cap/remove various fixtures and install new plumbing fixtures, sump pump and roof drain | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Plumbing | $10M–50M | Installation of a new plumbing system as per plans. | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $5M–10M | Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Modify mechanical ductwork and related piping. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · Murray Hill-Kips Bay | Renewal Permit with Changes · General Construction | $1M–5M | Balcony repairs including new railings and concrete patching with repair mortar and misc. masonry replacement. No change in use occupancy or egress. | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $1M–5M | HEREWITH FILING FOR INTERIOR DEMO & FITOUT AND EXTERIOR WORK AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. | 🔒 Address & contractors |
| 2026-09-16 | Queens · Queensboro Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | NYPQ - AC 3, 4, 5 REPLACEMENTS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | WCM Lobby, Cellar; Modification to HVAC piping, ductwork and equipment to accommodate the Primary Care Renovation in the existing building. | 🔒 Address & contractors |
| 2026-09-16 | Brooklyn · Brooklyn Heights | Initial Permit · General Construction | $1M–5M | Interior demolition, construction of interior partitions and installation of doors and frames as shown. No change to use, egress, or occupancy | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | New VAV boxes, chilled water fan coil units, ductwork, piping, and controls per new architectural programming and ceilings | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Initial Permit · Structural | $1M–5M | INSTALLATION OF NEW STAIR ON 3RD FL, REPLACE SKYLIGHT AND ADD BULKHEAD ON THE ROOF, HVAC UNITS INSTALLATION AND ASSOCIATED STRUCTURAL WORK FOR THE BUILDING AS PER PLANS FILED HEREW | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · General Construction | $10M–50M | INTERIOR BUILDOUT FOR OFFICE SPACE AS PER PLANS. | 🔒 Address & contractors |
| 2026-09-16 | Brooklyn · Madison | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | PARTIAL INTERIOR AND EXTERIOR DEMOLITION. INTERIOR AND EXTERIOR RENOVATION, GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS. PLUMBING,FOUNDATION, SOE FILED UNDER SEPERATE AP | 🔒 Address & contractors |
| 2026-09-16 | Brooklyn · Prospect Lefferts Gardens-Wingate | Renewal Permit Without Changes · Structural | $10M–50M | REPLACEMENT OF PARAPETS & ROOFS.MASONRY WORK FOR FACE BRICK REPLACEMENT INCLUDING LINTELS, REPOINTING, CONCRETE COLUMN LIMESTONE CLADDING REPLACEMENT. | 🔒 Address & contractors |
| 2026-09-16 | Bronx · Soundview-Clason Point | Initial Permit · General Construction | $1M–5M | RENOVATE EXISTING LIBRARY SUITE 209 - REMOVE EXISTING NON-STRUCTURAL PARTITIONS - MODIFY SUSPENDED CEILING- PROVIDE NEW NON-STRUCTURAL PARTITIONS - NO CHANGE IN USE - NO CHANGE IN | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Herewith filing Alt-Co to establish new place of assembly, Cafeteria Accessory to existing office at 12th floor as per plans. | 🔒 Address & contractors |
| 2026-09-16 | Brooklyn · Mapleton-Midwood (West) | Renewal Permit Without Changes · General Construction | $1M–5M | FILING FOR HORIZONTAL EXTENSION AT THE REAR OF AN EXISTING STRUCTURE ON ENLARGED LOT | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Interior fit-out, removal and installation of non load bearing partitions as per plans filed herewith- no change in use egress or occupancy | 🔒 Address & contractors |
| 2026-09-16 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Minor demolition. Installation of new partitions, floor finishes and suspended ceilings on the 4th Floor as per plans (BNP Asset Mgmt - Annex.) No change to use, egress or occupanc | 🔒 Address & contractors |
| 2026-09-15 | Queens · Jamaica Estates-Holliswood | Renewal Permit with Changes · General Construction | $1M–5M | Repairs to exterior masonry facade and main roof parapets; spot replacement of damaged brick, precast / stone window sills, window lintels & masonry tuck pointing. | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Bushwick (West) | Renewal Permit Without Changes · General Construction | $1M–5M | FILING ELECTRICAL DRAWINGS FOR THE FOLLOWING ITEMS: PROVIDE POWER CONNECTION FOR THE ELEVATOR; PROVIDE NEW POWER CONNECTION FOR MECHANICAL,PROVIDE NEW LIGHTING AND CONTROLS PER LA | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Greenpoint | Renewal Permit Without Changes · General Construction | $1M–5M | Masonry rebuilding, waterproofing lining of gutters, drain pipe repair related interior repair as per plans filed herewith. no change to use, egress or occupancy to PK110K. | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Brownsville | Renewal Permit Without Changes · General Construction | $1M–5M | Facade restoration at Howard House #7 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | replacement of existing exhaust fans and make-up air units. | 🔒 Address & contractors |
| 2026-09-15 | Queens · Flushing-Willets Point | Initial Permit · Full Demolition | $1M–5M | NYC DDC/DOT project for full demos of 6 existing structures. | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit Without Changes · General Construction | $10M–50M | Interior renovation of 7-story NYCHA multiple dwelling. Renovation, improvements at cellar, lobby, dwelling units, egress stairs, common corridors, laundry facility, community faci | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · East Midtown-Turtle Bay | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. No change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-09-15 | Bronx · Rikers Island | Renewal Permit with Changes · General Construction | $1M–5M | General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupanc | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · Structural | $1M–5M | Facade repairs as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | BCG FLOORS 43 & 46-- GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR DEMOLITION AND INSTALLATION OF NON-LOAD BEARING PARTITIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPAN | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Gramercy | Renewal Permit Without Changes · General Construction | $1M–5M | Architectural modifications taking place on the Cellar, 1st and Mezz as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-15 | Bronx · Morrisania | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site Yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-15 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. | 🔒 Address & contractors |
| 2026-09-15 | Bronx · Hunts Point | Renewal Permit Without Changes · Mechanical Systems | $10M–50M | Equipment gallery ventilation and heating. Control Building heating, cooling and ventilation. Gas room heating and ventilation. | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Interior tenant build-out on 6th floor including installation of non-load bearing partitions, doors/frames, and related finishes. No change in use, egress or occupancy under this a | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · General Construction | $10M–50M | PROPOSED 24 STORY RESIDENTIAL AND COMMERCIAL BUILDING. BUILDING #370 AND #362 (ON SINGLE ZONING LOT) FILED UNDER SEPARATE APPLICATION | 🔒 Address & contractors |
| 2026-09-15 | Bronx · Norwood | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · East Harlem (South) | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Madison | Renewal Permit Without Changes · General Construction | $1M–5M | Replace exterior ramps and reinforce concrete floors, patch and paint as required. PAA description in comments | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Gramercy | Initial Permit · General Construction | $1M–5M | Filing for a change of use at cellar & 1st floor from Office to an Exhibition space. Work includes a new interior non load bearing partition, finish work. | 🔒 Address & contractors |
| 2026-09-15 | Bronx · Eastchester-Edenwald-Baychester | Renewal Permit Without Changes · Plumbing | $1M–5M | FILED FOR PLUMBING WORK RELATED TO CONSTRUCTION OF GREENINFRASTRUCTURE PRACTICES AND PROPOSED CONNECTIONS TO NYCDEPSEWER. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-15 | Brooklyn · Gravesend (East)-Homecrest | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR RENOVATION WITH VERTICAL & HORIZONTAL ENLARGEMENTS CHANGING THE METES AND BOUND TO THE LOT AS PER PLAN | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · The Battery-Governors Island-Ellis Island-Liberty Island | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work in conjunction with Alt-Co | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Greenwich Village | Initial Permit · Mechanical Systems | $1M–5M | Mechanical modifications taking place on the 1, 3-5, 9-12, 13- 16 construction/14-17 marketing floors as per plans filed herewith. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Hamilton Heights-Sugar Hill | Renewal Permit Without Changes · Plumbing | $5M–10M | FILING FOR PLUMBIING WORK IN CONJUNCTION WITH APPL # M00677430. NOCHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-15 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · Plumbing | $1M–5M | Modification of plumbing system as shown on plans | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATION OF 1ST FLOOR COMMERICAL SPACE AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-14 | Bronx · Morris Park | Renewal Permit Without Changes · Plumbing | $1M–5M | 1400 PELHAM PARKWAY SOUTH - PLUMBING MODIFICATIONS TO PROVIDE NEW SANITARY VENT DOMESTIC CLD WATER & DOMESTIC HOT WATER IN WEST AND SOUTH WING. PROVIDE NEW OXYGEN MEDICAL AIR AND V | 🔒 Address & contractors |
| 2026-09-14 | Brooklyn · Sunset Park (West) | Renewal Permit Without Changes · Structural | $5M–10M | Structural modifications as indicated on the plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-14 | Brooklyn · Borough Park | Initial Permit · Structural | $10M–50M | REMOVAL AND REPLACEMENT OF FACE BRICK MASONRY, AS INDICATED ON DRAWINGS.2. REMOVAL AND REPLACEMENT OF SELECTIVE DECORATIVE TERRA COTTA AND LIMESTONEMASONRY, AS INDICATED ON DRAWING | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Full Demolition | $1M–5M | full demolition of four story structure, by hand held equipment only. | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | Interior build-out related to LA Fitness. No change in Use, Egress or Occupancy. | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | PAA submitted to replace 100% the TC cornice with new FRP cornice, as shown in filed drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-14 | Brooklyn · Williamsburg | Initial Permit · General Construction | $1M–5M | REMOVAL AND REPLACEMENT OF INTERIOR NON LOAD BEARING PARTITIONS AT EXISTING LOCATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-14 | Brooklyn · East Flatbush-Erasmus | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Demolish and remove (4) existing AHU. Provide (4) new roof top units. | 🔒 Address & contractors |
| 2026-09-14 | Brooklyn · Brownsville | Renewal Permit Without Changes · General Construction | $1M–5M | Facade restoration at Howard House Building #5 to comply with LL 11/98, cycle 9 report. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | Installation of overlay panels over existing spandrel panels, fire-rated opening infill and miscellaneous facade maintenance. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-14 | Bronx · Mott Haven-Port Morris | Initial Permit · Plumbing | $5M–10M | BACK OF HOUSE WORK INCLUDES ALL DOMESTIC WATER PIPING WITHIN FIRST FLOOR AND CELLAR INCLUDING ALL RISERS UPSTREAM OF LEAK DETECTION METERS AND ALL LEAK DETECTION METERS, AS DEPICTE | 🔒 Address & contractors |
| 2026-09-14 | Brooklyn · Brownsville | Renewal Permit Without Changes · General Construction | $1M–5M | Facade restoration at Howard House #2 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | AT 35TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · East Village | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work for Intuit space on 7th floor | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · East Village | Initial Permit · General Construction | $1M–5M | General construction for Intuit space on 7th floor | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION FROM THE 33RD TO THE 35TH FLOORS AS PLANS FILED FOR HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-14 | Queens · Auburndale | Initial Permit · Earth Work | $1M–5M | Playground redevelopment, Including removal & installation of asphalt pavement, playground equipment, and landscaping. | 🔒 Address & contractors |
| 2026-09-14 | Queens · Forest Hills | Renewal Permit with Changes · General Construction | $10M–50M | (HUB job) Convert existing 6 story hospital building to an 8 story residential AIRS and Community Facility building under ZR Article 1 Chapter 5, Vertical and Horizontal enlargemen | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Midtown-Times Square | Initial Permit · Structural | $5M–10M | Exterior alterations to add new occupiable roof level; reinforcing existing roof slab, install new rooftop canopy structure, new slab opening for HVAC, slab infill on the 43rd Floo | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and installation of non-load bearing partitions, doors/frames, ceiling/lighting and related finishes as per plans filed herewith. No change in use, egress or occupancy unde | 🔒 Address & contractors |
| 2026-09-14 | Staten Island · Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights | Initial Permit · Plumbing | $1M–5M | FILING HEREWITH SITE PLUMBING INCLUDING STORMWATER DRAINAGE, RETENTION AND INFILTRATION SYSTEMS AND NEW WATER SERVICE AS INDICATED ON PLANS. | 🔒 Address & contractors |
| 2026-09-14 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Interior demo and general construction for part of the 7th floor. | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Gramercy | Renewal Permit with Changes · General Construction | $1M–5M | PARTIAL INTERIOR RENOVATION OF EXISTING 1ST FLOOR SPACES INCLUSIVE OF TOILET ROOMS AND HOTEL LOBBY. NEW FINISHES AND LIGHTING WITH PARTITION MODIFICATIONS. UPDATES TO EXISTING MAR | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Washington Heights (South) | Initial Permit · General Construction | $1M–5M | EXTERIOR RESTORATION INCLUDING BRICK MASONRY, TERRACOTTA, LIMESTONE, PARAPET AND LINTEL REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical modifications to take place on the cellar as per drawings filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | General construction modifications taking place on the 23-24 Construction/ 24-25 Marketing floors as per plans filed herewith. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Architectural work on the 7th and 12th as indicated on drawings. | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Filing herewith Mechanical modifications as per plans. | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION ON THE 13TH THRU 15TH AND 18TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Greenwich Village | Initial Permit · General Construction | $10M–50M | General construction modifications taking place on the cellar, 1, 3-5, 9-12, 13- 16 construction/14-17 marketing floors as per plans filed herewith. No change in use, egress or occ | 🔒 Address & contractors |
| 2026-09-11 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Central Park | Initial Permit · Mechanical Systems | $10M–50M | SSCP. South Side Chiller Plant. DEMO AND REPLACE EXIST. COOLING TOWER ON P-WING ROOF. DECOMISSIONING OF EXIST. SATELITE CHILLER PLANTS IN K-WING AND U-WING. ADDITION OF 2 NEW CHIL | 🔒 Address & contractors |
| 2026-09-10 | Bronx · West Farms | Initial Permit · Full Demolition | $1M–5M | full demolition of 5 story structure using hand held and mechanical means. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | INTERIOR ARCHITECTURAL OFFICE RENOVATION ON 4TH AND 5TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Modification to existing HVAC systems. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-10 | Staten Island · Grasmere-Arrochar-South Beach-Dongan Hills | Renewal Permit Without Changes · Standpipe | $1M–5M | Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drai | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Hell's Kitchen | Initial Permit · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND RELATED FINISHES ON FLOOR 3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS CAPACITY, OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Upper West Side-Lincoln Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Herewith filing for mechanical modifications as per plans including new units on the roof. no change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $5M–10M | VERTICAL ENLARGEMENT AND CONVERSION OF AN EXISTING 6-STORY COMMERCIAL BUILDING INTO A RESIDENTIAL 11-STORY BUILDING | 🔒 Address & contractors |
| 2026-09-10 | Brooklyn · Prospect Lefferts Gardens-Wingate | Renewal Permit with Changes · General Construction | $10M–50M | NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL1) - FILING FOR A NEW BUILDING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW BUILDING | 🔒 Address & contractors |
| 2026-09-10 | Bronx · Tremont | Renewal Permit Without Changes · Earth Work | $1M–5M | removal of asphalt pavement and benches. Installation of new asphalt pavement, play unit, safety surface, picnic tables, planters and benches. | 🔒 Address & contractors |
| 2026-09-10 | Bronx · Tremont | Renewal Permit Without Changes · General Construction | $1M–5M | X234-REMOVAL OF TCU. RESURFACE EXISTING ASPHALT. REPLACE EQUIPMENT WITH NEW. NEW BENCHES, GAME LINES, BASKETBALL COURT. | 🔒 Address & contractors |
| 2026-09-10 | Queens · North Corona | Renewal Permit with Changes · Foundation | $1M–5M | VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING MIXED USE BUILDING. | 🔒 Address & contractors |
| 2026-09-10 | Brooklyn · Borough Park | Renewal Permit Without Changes · Structural | $1M–5M | Structural framing and work as per plans filed | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | Removal and installation of interior non-load bearing partition and related finishes as per drawings. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Morningside Heights | Renewal Permit Without Changes · General Construction | $1M–5M | APPLICATION FILED HEREWITH FOR FACADE RESTORATION WORK AS SHOWN ON PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Harlem (South) | Initial Permit · Sprinklers | $1M–5M | INSTALLATION OF A NEW SPRINKLER SYSTEM THROUGHOUT THE BUILDING AND PROVISION OF THE SPRINKLER COVERAGE TO THE EXISTING LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal of non-structural elements on all floor in a commercial building. No change in use, egress or occupancy . | 🔒 Address & contractors |
| 2026-09-10 | Staten Island · Westerleigh-Castleton Corners | Initial Permit · General Construction | $1M–5M | NYU PHYSICIAN PRACTICE - 1534 VICTORY BLVD - INTERIOR RENOVATIONS TO EXISTING FIRST FLOOR AMBULATORY CARE FACILITY AND FINISHES AT LOBBY ENTRANCE. NO CHANGE IN USE, EGRESS, OR OCCU | 🔒 Address & contractors |
| 2026-09-10 | Bronx · Morrisania | Renewal Permit Without Changes · General Construction | $1M–5M | Remove (8) TCUs including all related utilities & fire alarm, asphalt & concrete pavements, concrete curbs, chain link fencing gates, guardrail. Installation of new pavements, synt | 🔒 Address & contractors |
| 2026-09-10 | Queens · Forest Hills | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for exterior repair work at the roof and all facades. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Full Demolition | $1M–5M | full demolition of two story structure using hand held and mechanical means to assist with first floor removal. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Murray Hill-Kips Bay | Initial Permit · General Construction | $1M–5M | Facade Repair Project as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Tribeca-Civic Center | Initial Permit · Sprinklers | $1M–5M | Removal and installation of perimeter sprinkler heads on Floors 3 -24 (BNY), as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Mechanical modifications on Floors 03 through 06. No change in use, egress, or occupancy in this application. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Filing herewith for the installation of mechanical/hvac for amenities floors. | 🔒 Address & contractors |
| 2026-09-10 | Manhattan · Washington Heights (South) | Renewal Permit with Changes · General Construction | $50M+ | As per HUB consultation. The expansion project will be designed & classified as an addition to the existing RBSP & will be 9 storiesin height w/ approximately 75,000 sf of NB area | 🔒 Address & contractors |
| 2026-09-09 | Staten Island · Grasmere-Arrochar-South Beach-Dongan Hills | Renewal Permit Without Changes · General Construction | $5M–10M | Removal and renovation of interior non-load bearing paritions. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-09 | Brooklyn · Brooklyn Heights | Initial Permit · General Construction | $1M–5M | FACADE REPAIRS (FISP CYCLE 9) | 🔒 Address & contractors |
| 2026-09-09 | Brooklyn · Bay Ridge | Renewal Permit Without Changes · General Construction | $1M–5M | Repairs to the exterior masonry. Interior renovations at Boy's and Girls Cellar Toilet rooms, Kindergarten Toilet room, Cellar, first floor main entrance, and Auditorium. There wil | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | OFFICE INTERIOR FIT-OUT FOR BOTH THE 25TH AND 26TH FLOORS (29TH & 30TH FLOOR MARKETING) | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Hell's Kitchen | Initial Permit · General Construction | $1M–5M | Interior reno of 42 units consisting of existing 1 bedroom apt units 2 bedroom apt units and studio apt units to meet or exceed UFAS compliance as indicated on drawings. Minor reco | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $10M–50M | REMOVAL OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-09 | Staten Island · Port Richmond | Renewal Permit Without Changes · General Construction | $1M–5M | Selective roof replacements, parapet replacements, and exterior masonry repairs, along with miscellaneous MEP work related to the aforementioned replacements. | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Gramercy | Initial Permit · General Construction | $1M–5M | HEREWITH FILING GENERAL CONSTRUCTION WORK FOR INTERIOR RENOVATION, NON BEARING PARTITION, FLOORING, CEILING, & MILLWORK. NO CHANGE TO USE OCCUPANCY OR EGRESS | 🔒 Address & contractors |
| 2026-09-09 | Brooklyn · South Williamsburg | Renewal Permit Without Changes · General Construction | $1M–5M | APPLICATOIN FILED HERWITH FOR INTERIOR RENOVATION TO CELLAR, FIRST, SECOND AND PART OF THIRD AND FOURTH FLOOR OF AN EXISTING FOUR STORY MIXED USED BUILDING. NO EGRESS OF BULK CHANG | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · Mechanical Systems | $1M–5M | HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Gramercy | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATION OF EXISTING 17TH FLOOR PENTHOUSE, INCLUDING RECEPTION, LOUNGES, TOILET ROOMS, BARS, FINISHES, AND LIGHTING THROUGHOUT, PARTITION MODIFICATIONS,NEW WINDOWS AND D | 🔒 Address & contractors |
| 2026-09-09 | Manhattan · Washington Heights (South) | Initial Permit · General Construction | $1M–5M | Interior alterations, including modification of interior non-loadbearing partitions, bathrooms, and kitchens. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-09 | Bronx · Mott Haven-Port Morris | Renewal Permit Without Changes · General Construction | $1M–5M | Proposed vertical enlargement to an existing 1-story + cellar community facility building, converting to a 2-story + cellar community facility building. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Filing herewith mechanical/hvac installations/modifications on floors 24 through 26 as per plans. No change in use, egress, or occupancy in this application. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Filing herewith mechanical/hvac ductwork and piping for floors 27 through 29. Early scope filed in Mechanical job # M01344776-I1 with construction costs included in this filing. No | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Greenwich Village | Renewal Permit Without Changes · Plumbing | $1M–5M | Filing herewith sprinkler and plumbing modifications as per plans | 🔒 Address & contractors |
| 2026-09-08 | Bronx · Tremont | Renewal Permit Without Changes · General Construction | $10M–50M | APPLICATION FILED FOR NEW 8-STORY BUILDING AS PER FILED HEREWITH. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION TAKING PLACE ON 7TH FLOOR AS SHOWN ON DRAWINGS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · General Construction | $1M–5M | Work includes per the filed plans remove/replace roof membrane, flashing, replace roof drains, repair/replace selected guard rails, remove/replace cracked masonry units, masonry re | 🔒 Address & contractors |
| 2026-09-08 | Queens · Pomonok-Electchester-Hillcrest | Initial Permit · General Construction | $1M–5M | SELECTIVE INTERIOR DEMOLITION OF NON-STRUCTURAL ELEMENTS. NEW INTERIOR PARTITIONS,DOORS, CEILINGS, FINISHES, ELECTRICAL, HVAC, PLUMBING, FIRE ALARM, AND FIRE PROTECTION.NO CHANGE O | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Gramercy | Initial Permit · General Construction | $1M–5M | Architectural modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-08 | Queens · Far Rockaway-Bayswater | Renewal Permit Without Changes · General Construction | $5M–10M | MODIFICATIONS TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS FOR NEW MEDICAL OFFICES AT THE 2ND FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | MJFF -- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH OFFICE BUILDOUT. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | Filing herewith removal and installation of interior non load bearing partitions and related finishes as per plans. No change in use, occupancy, or egress under this application. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · Plumbing | $5M–10M | NYU - Multi-Floor Reno - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-08 | Brooklyn · Sunset Park (West) | Initial Permit · General Construction | $1M–5M | HEREWITH FILING FOR OPEN PARKING LOT FOR NYU LANGONE HEALTH WITH PARKING LIFTS FOR 327 SPACES AND ATTENDANT BOOTH ACCESSORY FO UG 4A NB B08050677. | 🔒 Address & contractors |
| 2026-09-08 | Staten Island · Port Richmond | Initial Permit · General Construction | $1M–5M | REMOVAL AND REPLACEMENT OF FURRED GYPSUM BOARD WALLS AT RETAINING WALLS, FLOORING, DOORS, FRAMES, CASEWORK, RESILIENT BASE, FIN TUBE RADIATORS, CONCRETE FLOOR SLAB. INSTALLATION OF | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATION OF TENANT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Upper West Side (Central) | Renewal Permit Without Changes · Structural | $1M–5M | Exterior Facade & Roof per the plans: Removal and replacement of the existing roof membrane & flashing, cracked masonry units, parapet and roof drains. Installation of guard rails. | 🔒 Address & contractors |
| 2026-09-08 | Brooklyn · Bushwick (West) | Renewal Permit with Changes · General Construction | $1M–5M | Proposed horizontal and vertical enlargement to create an 4-story and penthouse, 8-family mixed use building | 🔒 Address & contractors |
| 2026-09-08 | Brooklyn · East New York-New Lots | Renewal Permit Without Changes · Plumbing | $1M–5M | Application filed herewith for the installation of new underground sanitary and storm piping for new building. Filed in conjunction with NB applic. # 321590774. Associated DOBNOW | 🔒 Address & contractors |
| 2026-09-08 | Queens · Elmhurst | Initial Permit · General Construction | $1M–5M | Elmhurst Hospital Center Roof repairs as per the plans filed including: Removal/ replacement / repairs of existing roof membrane & flashings, existing roof drains and metal coating | 🔒 Address & contractors |
| 2026-09-08 | Queens · Astoria (East)-Woodside (North) | Initial Permit · Structural | $1M–5M | (PHASE 2) - RESTORATION OF INTERIOR MASONARY WALLS. SUPPORT OF NEW ROOFTOP UNITS. RAISE FIRST FLOOR CEILING. ADDITION OF STAIR CASE FROM THE CELLAR TO FIRST FLOOR. FIRST FLOOR SLAB | 🔒 Address & contractors |
| 2026-09-08 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $1M–5M | MINOR ALTERATIONS WITH NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-04 | Bronx · Bedford Park | Renewal Permit Without Changes · General Construction | $1M–5M | Lehman College, Shuster Hall Exterior Faade, Stair and Loading Dock renovation and repairs as per the plans filed including removal & replacement of facade conditions, stairs, rail | 🔒 Address & contractors |
| 2026-09-04 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · Structural | $1M–5M | Facade modifications as per drawings filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-04 | Bronx · Bedford Park | Renewal Permit Without Changes · Structural | $1M–5M | Lehman College, Fine Arts Building Exterior Faade, Stair and Loading Dock renovation and repairs as per the plans filed including removal & replacement of facade conditions, stairs | 🔒 Address & contractors |
| 2026-09-04 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | Scope to include new storefront and marquee at Broadway main lobby entrance, new storefront at 50th Street secondary lobby entrance, associated structural modification, new mechani | 🔒 Address & contractors |
| 2026-09-04 | Brooklyn · Canarsie | Initial Permit · General Construction | $1M–5M | Breukelen Bldg 28, Facade repairs: Removal/replacement/repairs of cracked masonry units, steel lintels and brick masonry. Provide slate sill and new backer rod & sealant. Masonry r | 🔒 Address & contractors |
| 2026-09-04 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Removal of existing windows, facade stone and waterproofing and installation of new on the 1st, 2nd, 3rd and 4th floors(Harry Winston - Exterior) as per plans. No change to use, e | 🔒 Address & contractors |
| 2026-09-04 | Bronx · Parkchester | Initial Permit · General Construction | $1M–5M | BUILD OUT OF THE INTERIOR OFFICE SPACE ON THE CELLAR, 1ST & 2ND FLOOR. INCLUDES DEMOLITION OF EXISTING PARTITIONS & INSTALLATION OF NEW PARTITIONS (FIRE-RATED WHERE REQUIRED) & IN | 🔒 Address & contractors |
| 2026-09-04 | Brooklyn · Sunset Park (West) | Renewal Permit Without Changes · General Construction | $50M+ | Herewith filing for 6 story Ambulatory Health Care New building as per plans. Early foundation pursuant to admin code 28-104.2.5. | 🔒 Address & contractors |
| 2026-09-04 | Brooklyn · Brownsville | Renewal Permit with Changes · General Construction | $10M–50M | Filing New Building herewith. Consultation meeting took place 12/8/21. | 🔒 Address & contractors |
| 2026-09-04 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work for Dental Center & Member's Lobby as per plans filed herewith. no change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-04 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit with Changes · General Construction | $10M–50M | HEREBY FILING INTERIOR DEMO TO REMOVE PORTIONS OF EXISTING CEILINGS, NONBEARING PARTITIONS, REMOVAL OF EXISTING STAIRS, ELEVATORS & EXISTING PLUMBING FIXTURES. GENERAL CONSTRUCTION | 🔒 Address & contractors |
| 2026-09-04 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | PHASE 3.3: Partial int. fitout including dismantling/installation of non-load bearing walls, doors, ceiling, floors, finishes, exterior repairs and glazing. Replace existing window | 🔒 Address & contractors |
| 2026-09-04 | Brooklyn · Flatbush | Renewal Permit Without Changes · General Construction | $1M–5M | REMOVAL & REPLACE OF WINDOWS, REPOINTING AND LOCAL REMOVAL & REPLACEMENT OF DAMAGED STONE. REMOVAL & REPLACE OF PARAPETS WALLS AND ROOFS. COURTYARD SLAB REMOVAL & RECONSTRUCTION | 🔒 Address & contractors |
| 2026-09-04 | Brooklyn · Borough Park | Renewal Permit with Changes · General Construction | $1M–5M | HEREWITH FILING FOR VERTICAL AND HORIZONTAL ENLARGEMENT, AND INTERIOR RENOVATION | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $5M–10M | Filing herewith for the installation of mechanical/hvac scope as per plans. | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | LEVEL 23 GENERAL CONSTRUCTION FOR OFFICE FITOUTINCLUDING NEW PARTITIONS, INTERIOR GLAZING, FLOORING,CEILING, LIGHTING, AND LIGHTING CONTROLS.NO IMPACT ON PRESENT ZONING OF BUILDING | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · East Harlem (North) | Renewal Permit with Changes · General Construction | $1M–5M | ENLARGEMENT OF EXISTING 1 STORY COMMERCIAL BUILDING WITH 4 STORIES OF RESIDENTIAL (1 DU EACH ON FLOORS 2 AND 3. 2 UNITS EACH ON FLOORS 4 AND 5). | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Filing herewith general construction scope for elevators lobbies at 12th thru 13th and 19th thru 43rd floor as per plans. No change in use, occupancy, or egress under this applicat | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Midtown-Times Square | Initial Permit · Sprinklers | $1M–5M | Filing herewith sprinkler and standpipe installations/modifications on floors 34-38 as per plans. No change in use, occupancy, or egress proposed under this application. | 🔒 Address & contractors |
| 2026-09-03 | Bronx · Norwood | Initial Permit · General Construction | $1M–5M | MONTEFIORE - LAB 9 - MODIFICATIONS OF PARTITIONS, CEILING, DOORS PLUS CONNECTING BRIDGE ADDITION ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-03 | Staten Island · West New Brighton-Silver Lake-Grymes Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Seton bldg-ARCHITECTURAL WORK FOR PROPOSED ROOF REPLACEMENT FOR SETON BUILDING LOCATED AT RICHMOND UNIVERSITY MEDICAL CENTER. ALL AS PER PLANS FILED HEREWITH. | 🔒 Address & contractors |
| 2026-09-03 | Brooklyn · Bedford-Stuyvesant (West) | Initial Permit · General Construction | $1M–5M | ALTERATION APPLICATION FOR THE CURRENTLY APPROVED SUPERMARKET UNDER THE FRESH PROGRAM AT THE FIRST AND CELLAR FLOOR. INTERIOR PARTITIONS, PLUMBING THROUGHOUT. | 🔒 Address & contractors |
| 2026-09-03 | Bronx · Concourse-Concourse Village | Initial Permit · Sprinklers | $1M–5M | Install sprinkler heads to existing sprinkler and standpipe system as per plan filed in conjunction with GC # X01373793-I1. | 🔒 Address & contractors |
| 2026-09-03 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Interior fit out | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $10M–50M | Modifications to the existing HVAC System: Removal and replacement of HVAC equipment and system, including (11) Air Handling Units being replaced on the 16th Floor as per plans (AH | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and construction of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Upper East Side-Yorkville | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | REMOVAL AND REPLACEMENT OF HEATING AND VENTILATION UNITS, MODIFICATION OF EXISTING DUCTWORK, AND INSTALLATION OF NEW EXHAUST FANS. | 🔒 Address & contractors |
| 2026-09-03 | Brooklyn · Gravesend (South) | Renewal Permit with Changes · General Construction | $1M–5M | Vertical and horizontal enlargement of the existing building | 🔒 Address & contractors |
| 2026-09-03 | Brooklyn · Clinton Hill | Initial Permit · General Construction | $1M–5M | THIS APPLICATION IS FILED FOR MINOR INTERIOR ALTERATION WORK ON GROUND, 2ND, PARTIAL 3RD & 4TH FLOOR ONLY & REPAIR EXIST STAIRS TO ADDRESS VIO#39147401K & #34687097K. NO CHANGE IN | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Filed herewith front facade replacement. No change of use, occupancy or egress under this application | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Application filed for Facade repair at Bard Hall building as per plans. No changes to egress or occupancy. | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Interior renovation / modifications as per plans filed herewith. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-03 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | #8998 - STOREFRONT AND NON-BEARING PARTITION INSTALLATIONS IN EXISTING RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or | 🔒 Address & contractors |
| 2026-09-02 | Queens · Kew Gardens Hills | Initial Permit · General Construction | $1M–5M | HEREWITH FILE ALT CO FOR TO ADD A SECOND STORY TO AN EXISTING 1 STORY COMMERICAL BUILDING, IN ORDER TO DO VERTICAL ENLARGEMENT, AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | APPLICATION FILED TO RENOVATE OFFICES SPACES AT FLOORS 8 & 23. WOIRK INCLUDES DEMOLITION OF EXISTING PARTITIONS AND CONSTRUCTION OF NEW INTERIOR PARTITIONS, DOORS, AND FINISHES. NO | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Chinatown-Two Bridges | Renewal Permit Without Changes · General Construction | $1M–5M | NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boil | 🔒 Address & contractors |
| 2026-09-02 | Queens · Forest Hills | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for masonry and related exterior repairwork. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for the renovation of duplex apt 1/2B at the 1st and 2nd floor. Work includes removal and installation of interior non load bearing partitions, doors, finish work. No change | 🔒 Address & contractors |
| 2026-09-02 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Hereby filing to construct new interior partitions, ceilings and doors for office renovation as shown on plans filed herewith. No change to use, occupancy or egress. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Filing herewith partial (exterior) demolition of existing facade, including but not limited to windows removals and terraces elements as per plans. No change in use, occupancy, or | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION WORK AS SHOWN ON PLANS FILED HEREWITH | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | Herewith filing for facade repair as per the drawings. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-02 | Brooklyn · Crown Heights (North) | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work as shown on plans | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | FILED HEREWITH FOR INTERIOR FITOUT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-09-02 | Brooklyn · Cypress Hills | Initial Permit · General Construction | $1M–5M | PROPOSED NEW FIVE (5) STORY WITH CELLAR. MIXED-USE BUILDING. MECHANICAL (MH), STRUCTURAL (ST), PLUMBING/SPRINKLER/STANDPIPE (PL/SP/SD), FIRE ALARM(FA) & BPP FILED SEPERATELY. 8 CL | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work Floors 42-43. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · East Harlem (North) | Initial Permit · General Construction | $5M–10M | INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF CELLAR, INTERIOR UNITS AND CORRIDORS. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESSIS PROPOSED UND | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Filing herewith mechanical/hvac installations/modifications on floors 30 through 33. Filing in conjunction with early-phase mechanical #M01344778-I1 approved and permitted. No chan | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Removal and installation of non-load bearing partitions, doors, frames, flooring, ceiling and related finishes as per plans filed herewith. No change in use, egress or occupancy un | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Filing herewith removal and installation of interior non load bearing partitions and related finishes as per plans. No change in use, occupancy, or egress under this application. | 🔒 Address & contractors |
| 2026-09-02 | Queens · Forest Hills | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for masonry and related exterior repairwork. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-09-02 | Bronx · Eastchester-Edenwald-Baychester | Initial Permit · General Construction | $1M–5M | INTERIOR AND EXTERIOR RENOVATIONS OF EXISTING TRUCK TERMINAL AND ADJACENT PARKING INSIDE PROPERTY LINE INCLUDING STRUCTURAL FRAMING AND CONCRETE RAMP REPLACEMENT AS PER PLANS FILED | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Washington Heights (North) | Renewal Permit with Changes · General Construction | $1M–5M | Reroofing as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-09-02 | Bronx · Morrisania | Renewal Permit with Changes · General Construction | $1M–5M | APPLICATION FILED HEREWITH TO CONVERT AN EXISTING TWO STORY + CELLAR AND BASEMENT MIXED USE BUILDING INTO A TEN FAMILY RESIDENTIAL BUILDING | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | WCM INTERIOR 2 & 3: DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE RENOVATIONS IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-02 | Manhattan · Murray Hill-Kips Bay | Initial Permit · General Construction | $1M–5M | Architectural/Structural modifications taking place on the 1st floor (lobby exterior) as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-01 | Queens · Queensbridge-Ravenswood-Dutch Kills | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work related to Covid Ventialtion upgrades. | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Tribeca-Civic Center | Renewal Permit with Changes · Support of Excavation | $1M–5M | Support of excavation to accommodate removal of remnant foundation walls at the existing demolition site. | 🔒 Address & contractors |
| 2026-09-01 | Brooklyn · Sunset Park (West) | Initial Permit · General Construction | $1M–5M | Renovation of existing business occupancy into medical office space, including 15 exam rooms, waiting area associated support spaces. No change to use, egress or occupancy | 🔒 Address & contractors |
| 2026-09-01 | Bronx · Mott Haven-Port Morris | Renewal Permit Without Changes · General Construction | $1M–5M | X027_Remove existing blowers. Provide H&V units in cellar and roof, new AC units in cellar and on roof, and new roof fans. Provide new ductwork and shaft vents. | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $10M–50M | Filing herewith for the installation of interior partitions and related finishes for offices and accessory support rooms/spaces/areas as per plans. No change in use, occupancy, or | 🔒 Address & contractors |
| 2026-09-01 | Brooklyn · Bushwick (East) | Initial Permit · General Construction | $1M–5M | Four Story and Penthouse, mixed use building consisting of 8 residential dwelling units, commercial space and a community facility | 🔒 Address & contractors |
| 2026-09-01 | Brooklyn · South Williamsburg | Initial Permit · Sprinklers | $1M–5M | Sprinkler/Standpipe work in conjunction with Alt-CO. | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Chinatown-Two Bridges | Renewal Permit Without Changes · General Construction | $1M–5M | Change the use in Cellar from Eating & Drinking Establishment to Retail; 18,498 S.F. interior renovation with new partitions, demolition of non-structural partitions, relocation of | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Financial District-Battery Park City | Initial Permit · Plumbing | $1M–5M | Plumbing work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-09-01 | Queens · Jamaica | Renewal Permit Without Changes · General Construction | $1M–5M | MEDISYS HEALTH NETWORK, CENTER FOR WELLNESS AND HEALTH AMBULATORY CARE CENTER. WORK INCLUDES INTERIOR PARTITIONS, SUSPENDED CEILINGS, FINISHES; CHANGE OF USE TO COMMUNITY FACILITY | 🔒 Address & contractors |
| 2026-09-01 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit with Changes · General Construction | $5M–10M | Herewith filed 5 story mixed use New Building. | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | MECHANICAL MODIFICATIONS AND INSTALLATION OF SYSTEMS ASSOCIATED DUCTS AND PIPING | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS, DOORS AND FINSHES AS SHOWN ON DRAWINGS. NO CHANG TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-09-01 | Queens · Queensbridge-Ravenswood-Dutch Kills | Renewal Permit Without Changes · General Construction | $1M–5M | Auditorium seating replacement, replace existing fixed seating with new fixed seating with no impact to occupancy. Install new bi-level ADA compliance drinking fountains with bottl | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | Interior renovation of 4th floor office space as per plans filed. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-09-01 | Queens · Astoria (East)-Woodside (North) | Renewal Permit Without Changes · Plumbing | $1M–5M | INSTALLATION OF A PACKAGE DOMESTIC HOT WATER PODS, INCLUDING DIRECT-BURIED DOMESTIC HOT WATER PIPING, AND PUMPS. CONNECT THE NEW TO EXISTING DOMESTIC HOT WATER PIPING PER PLANS. NO | 🔒 Address & contractors |
| 2026-09-01 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $1M–5M | General Construction for installation of interior partitions, floors, ceilings and related finishes as per plans for tenant fitout | 🔒 Address & contractors |
| 2026-09-01 | Queens · Flushing-Willets Point | Initial Permit · Mechanical Systems | $1M–5M | INSTALL NEW HVAC SYSTEM FOR NEW COMMERCIAL HOTEL BUILDING IN CONJUNCTION WITH NB #421405642.NO CHANGE IN USE,EGRESS AND OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Kensington | Renewal Permit Without Changes · General Construction | $1M–5M | Excavation of north facade. Repair, repointing, and waterproofing of foundation. Demolition and replace of areaways and stair. Infill permeable soil, grading, and landscaping. Repl | 🔒 Address & contractors |
| 2026-08-31 | Queens · College Point | Renewal Permit Without Changes · General Construction | $1M–5M | WATER INFILTRATION REPAIR / MITIGATIONAT EXISTING SCHOOL P.S. 029 - QUEENS, INCLUDING STRUCTURAL REPAIR, WATERPROOFING OF BELOW-GRADE FOUNDATION WALLS, AND ASSOCIATED SITE IMPROVEM | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | WCM Lobby, Cellar; Interior partitions and finishes to accommodate the Primary Care Renovation in the existing building. | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Fort Greene | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-31 | Bronx · Kingsbridge-Marble Hill | Renewal Permit with Changes · General Construction | $1M–5M | Filing for facade and balcony repairs as per plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-31 | Queens · Astoria (North)-Ditmars-Steinway | Initial Permit · Structural | $5M–10M | INSTALLATION OF ONE-STORY MOTOR CONTROL CENTER (MCC) ENCLOSURE ON FOUNDATION APPROVED UNDER APPLICATION # Q01238068-I1. | 🔒 Address & contractors |
| 2026-08-31 | Queens · Astoria (North)-Ditmars-Steinway | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL INSTALLATION TO INCLUDE NITROGEN STORAGE, VAPORIZERS, PIPING, CONTROLS AND OTHER ASSOCIATED SYSTEMS. | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Coney Island-Sea Gate | Initial Permit · Foundation | $1M–5M | Propose to install new canopy and new pre-engineered kiosk. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Bedford-Stuyvesant (West) | Initial Permit · Structural | $1M–5M | STRUCTURAL APPLICATION FILED IN CONJUNCTION TO APPLICATION #B01286361-I1 | 🔒 Address & contractors |
| 2026-08-31 | Bronx · University Heights (North)-Fordham | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work for comprehensive energy upgrades as per plans filed herewith. No change to use, egress or occupancy | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Bedford-Stuyvesant (East) | Renewal Permit Without Changes · Structural | $1M–5M | IT IS PROPOSED TO REPAIR FACADE - BRICK REPLACEMENT; POINTING, REMOVE AND REPLACE STEEL WINDOW LINDEL, WATERPROOF STEEL SHELF ANGLE AS SHOWN ON PLANS. | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · Murray Hill-Kips Bay | Renewal Permit with Changes · Mechanical Systems | $5M–10M | NYU - MSB Restack Build Out - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-31 | Queens · Forest Hills | Renewal Permit Without Changes · General Construction | $5M–10M | 9th Cycle FISP Repair. No Change to Use, Egress or Occupancy. | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Bedford-Stuyvesant (West) | Renewal Permit Without Changes · General Construction | $1M–5M | New elevator and elevator shaft addition with access to floors basement through 4th floor and providing compliant accessible ramp at the basement elevator lobby. Interior alteratio | 🔒 Address & contractors |
| 2026-08-31 | Brooklyn · Crown Heights (North) | Initial Permit · General Construction | $10M–50M | PROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING TWO-STORY BUILDING, PROPOSING 9 STORY, CELLAR, AND BASEMENT MIXED USE BUILDING | 🔒 Address & contractors |
| 2026-08-31 | Queens · Ozone Park (North) | Initial Permit · General Construction | $5M–10M | Repair of existing roofing and parapets. Masonry repairs and window replacement in the third floor courtyard. | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Installation of new partitions, doors, ceilings and finishes on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | Modifications to the existing HVAC system on the 35th floor (OneMain Financial) as per plans. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Filing herewith interior renovation on the 4th FL. as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Interior office renovation on 2nd floor as indicated on plans filed herewith. No change of use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-31 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Filing for facade repairs as per plans filed herewith. No change in use occupancy or egress. | 🔒 Address & contractors |
| 2026-08-28 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $5M–10M | INTERIOR PARTITIONS AND CEILING MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-28 | Manhattan · Gramercy | Initial Permit · General Construction | $1M–5M | Facade repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-28 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · Structural | $1M–5M | Facade and Chimney Repair, Bulkhead reconstruction and roof replacement as per plans filed herewith. No change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-08-28 | Manhattan · Morningside Heights | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Herewith filing mechanical modifications for MSM S&R AHU Replacement Project. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-28 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit with Changes · General Construction | $1M–5M | Alteration CO application as-of-right conversion of existing 2 story commercial building into a residential R-2 building with horizontal & vertical enlargement for 8 D.U.'s, 5 stor | 🔒 Address & contractors |
| 2026-08-28 | Queens · Middle Village | Initial Permit · Mechanical Systems | $1M–5M | HEREBY FILING RENOVATION OF EXISTING COMMERCIAL SPACES AT CELLAR, STOREFRONT, 1ST FLOOR, AND ROOF DUE TO FIRE DAMAGE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. RELATED APPLICATIONS - | 🔒 Address & contractors |
| 2026-08-28 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Renewal Permit with Changes · General Construction | $1M–5M | Alteration CO application as-of-right conversion of existing 3 story mixed use building into a residential R-2 building with horizontal & vertical enlargement for 8 D.U.'s, 5 stori | 🔒 Address & contractors |
| 2026-08-28 | Staten Island · Port Richmond | Renewal Permit with Changes · General Construction | $1M–5M | P.S. 019-R: Construct a connection bridge structure over the existing 1-story building to extend the corridor on the second and third floors to a new building addition. Cellar work | 🔒 Address & contractors |
| 2026-08-28 | Brooklyn · Brooklyn Heights | Renewal Permit with Changes · Plumbing | $5M–10M | Installation of new plumbing fixtures and systems as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-28 | Queens · Bayside | Renewal Permit Without Changes · Plumbing | $1M–5M | PROVIDENEW GAS SERVICE AND METER WITH PRESSURE REGULATOR AT METER ROOM. RUN NEW GAS DISTRIBUTION PIPING TO THE NEW KITCHEN AND ROOF MECHANICAL EQUIPMENT. INSTALLATION OF NEW SPRINK | 🔒 Address & contractors |
| 2026-08-28 | Manhattan · Morningside Heights | Renewal Permit Without Changes · Structural | $1M–5M | MS - S & R MORNINGSIDE FACADE REPAIRS - GENERAL CONSTRUCTION INCLUDING FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-27 | Brooklyn · East Flatbush-Remsen Village | Initial Permit · General Construction | $10M–50M | Snapper 5:: Modifications of interior partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only. | 🔒 Address & contractors |
| 2026-08-27 | Bronx · University Heights (North)-Fordham | Renewal Permit with Changes · General Construction | $10M–50M | Interior renovation and conversion of existing class I-B office building into 1968 BC class I-B community facility building located in 10 story building. | 🔒 Address & contractors |
| 2026-08-27 | Bronx · Throgs Neck-Schuylerville | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Implement ventilation system improvements to ensure all spaces are ventilated. Replace outdated mechanical equipment including air handling units, return fans, exhaust fans, and ch | 🔒 Address & contractors |
| 2026-08-27 | Staten Island · St. George-New Brighton | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site yard work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-27 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-08-27 | Manhattan · Morningside Heights | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION/RENOVATION FOR FOR LEVEL 300 LIBRARY AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. | 🔒 Address & contractors |
| 2026-08-27 | Brooklyn · Sunset Park (West) | Initial Permit · Mechanical Systems | $1M–5M | NYULHB - Install new 48 diameter, 316 stainless steel chimney liner within existing boiler stack to height 175'-0, including new breeching connections serving existing low pressure | 🔒 Address & contractors |
| 2026-08-27 | Manhattan · Financial District-Battery Park City | Renewal Permit with Changes · General Construction | $1M–5M | LMH OB 6fl: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-27 | Bronx · Co-op City | Initial Permit · General Construction | $1M–5M | Replace windows with new windows at existing masonry openings and associated finish work at interior. Replacement window guards. | 🔒 Address & contractors |
| 2026-08-27 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATIONS OF EXISTING CLASSROOMS AND COMPUTER LABS AS PER PLANS. MINOR PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-08-27 | Brooklyn · Borough Park | Initial Permit · General Construction | $1M–5M | PROPOSED HORIZONTAL EXTENSION TO AN EXISTING FOUR (4) STORY WITH MEZZANINE & CELLAR SCHOOL BUILDING. | 🔒 Address & contractors |
| 2026-08-27 | Manhattan · Upper West Side-Manhattan Valley | Renewal Permit Without Changes · General Construction | $1M–5M | ARCHITECTURAL SCOPE ASSOCIATED WITH THE INTERIOR ND MINOR EXTERIOR RENOVATION OF THE PARISH HOUSE INCLUDING RELOATION OF AN EXISTING KITCHEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-27 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · Standpipe | $1M–5M | Modification to existing plumbing systems and fixtures and sprinkler systems and installation of new sprinkler heads as per plans filed herewith. Installation of new standpipe. No | 🔒 Address & contractors |
| 2026-08-26 | Bronx · Crotona Park | Initial Permit · Foundation | $1M–5M | THIS PROJECT WILL RECONSTRUCT A RETAINING WALL AT SOUTHERN BOULEVARD BETWEEN E 175TH STREET AND CROTONA PARK EAST IN CROTONA PARK ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · General Construction | $1M–5M | INTERIOR ALTERATIONS TO SECOND FLOOR OFFICE SPACE FOR TENANT FIT OUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Brooklyn Heights | Renewal Permit with Changes · Mechanical Systems | $1M–5M | Mechanical piping and ductwork installation on cellar and 1st floor to accommdote medical office fit out. Refer to plans filed herewith. | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Brooklyn Heights | Renewal Permit with Changes · General Construction | $1M–5M | Interior demolition on cellar - 1st fls; new 1st floor slab; facade repair to for duct support connections; roof replacement and replacement of exterior metal stair and catwalk for | 🔒 Address & contractors |
| 2026-08-26 | Bronx · Hunts Point | Renewal Permit Without Changes · General Construction | $10M–50M | EXCAVATION, SITE GRADING, CONSTRUCTION OF ACCESS ROADS, SIDEWALKS, CURBS. INSTALLATION OF UTILITIES, STORM, SANITARY,WATER, GAS, ELECTRICAL AND PIPE YARD. | 🔒 Address & contractors |
| 2026-08-26 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Filing herewith for Mechanical modifications as per plans. Removal and installation of HVAC unit and associated duct piping work. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-26 | Manhattan · East Harlem (South) | Initial Permit · General Construction | $1M–5M | MOUNT SINAI HEALTH SYSTEMS - ANNENBERG 2 CARDIOLOGY OFFICES - GENERAL CONSTRUCTION MODIFICATIONS INCLUDING CHANGES TO PARTITIONS, DOORS, CEILINGS AND FLOORS AS PER PLANS FILED HERE | 🔒 Address & contractors |
| 2026-08-26 | Bronx · Hunts Point | Renewal Permit Without Changes · General Construction | $10M–50M | The Hunts Point Wastewater Treatment Plant New Anaerobic Digester Facilities project includes excavation, site grading, construction of access roads, sidewalks, curbs, installation | 🔒 Address & contractors |
| 2026-08-26 | Manhattan · Lower East Side | Renewal Permit Without Changes · Structural | $1M–5M | STRUCTURAL REINFORCEMENT INCONJUNCTION WITH PROPOSED 7 STORY ENLARGEMENT TO EXISTING 8 STORY BUILDING FILED UNDER ALT I APPLICATION 121205114. | 🔒 Address & contractors |
| 2026-08-26 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON FLOORS 4 AND 6 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-26 | Queens · East Flushing | Initial Permit · Support of Excavation | $10M–50M | SOE for New school Q512 | 🔒 Address & contractors |
| 2026-08-26 | Queens · Middle Village | Initial Permit · Plumbing | $1M–5M | Remove and replace 18 roof drains in kind. provide flashing for vent stacks. . extend 1 vents 2ft Above parapet. Pressure wash and clean all 18 roof drain leaders. | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Greenpoint | Initial Permit · General Construction | $1M–5M | CONVERSATION OF EXISTING MANUFACTURING BUILDING TO A COMMERCIAL BUILDING AS INDICATED ON THE DRAWINGS FILED HEREIN. | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Brooklyn Heights | Renewal Permit with Changes · General Construction | $5M–10M | FIT OUT: Construct new partitions and finishes to existing commercial spaces on cellar and 1st floor as per plans filed herewith. No change to zoning, use, egress, occupancy | 🔒 Address & contractors |
| 2026-08-26 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | INT RENO OF EXIST BUSINESS CLASS OCC OF 25,331 SF FT OF THE 4TH FLOOR OF THE BLDG, INSTALL OF NEW NON-LOAD BEARING PRT, CEILINGS, LIGHT FIX, AV, IT AND MECH, ELECT, PL AND FP SYSTE | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Brooklyn Heights | Renewal Permit with Changes · Mechanical Systems | $1M–5M | Mechanical infrastructure to accommodate medical office space on cellar and 1st floor including new rooftop mechanical equipment, new vent piping and ductwork on the exterior facad | 🔒 Address & contractors |
| 2026-08-26 | Manhattan · The Battery-Governors Island-Ellis Island-Liberty Island | Initial Permit · General Construction | $1M–5M | Application filed for exterior facade repairs as shown on plans | 🔒 Address & contractors |
| 2026-08-26 | Brooklyn · Madison | Initial Permit · Structural | $1M–5M | K234-EXTERIOR MASONRY REPAIRS, WINDOW REPLACEMENT INCLUDING GUARDS & SHADES. INTERIOR FINISH REPAIRS. | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Murray Hill-Kips Bay | Renewal Permit with Changes · Mechanical Systems | $5M–10M | HEREWITH FILING FOR MECHANICAL MODIFICATION AS PER PLANS FOR ED EXPANSION. NO CHANGE IN USE, EGRESS OROCCUPANCY. | 🔒 Address & contractors |
| 2026-08-25 | Staten Island · West New Brighton-Silver Lake-Grymes Hill | Renewal Permit Without Changes · General Construction | $1M–5M | RUMC-BI-PLANE EP LAB-SETON & SPELLMAN WINGS - Medical Use Bldg- Proposing Interior Reno on Floor #1 for new Cardiac Cath Labs, Impatient/Outpatient Support Area,as well as Expansio | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Midtown-Times Square | Renewal Permit with Changes · Full Demolition | $10M–50M | Full Demolition of 23 Story Commercial Building | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit with Changes · Mechanical Systems | $1M–5M | ANNEX ESR: MODIFICATION TO HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATION WITHIN THE EXISTING HOSPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO UES, EGRESS OR OCCUPANCY | 🔒 Address & contractors |
| 2026-08-25 | Queens · Glen Oaks-Floral Park-New Hyde Park | Initial Permit · Sprinklers | $1M–5M | Northwell LIJ Sprinkler Upgrade project - Main Building: sprinkler upgrades throughout building, as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Morningside Heights | Initial Permit · General Construction | $1M–5M | Application to be reviewed with the Development HUB. Site Yard Work and new 8'-0 high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | Construction work on the 6th floor (VHB office relocation) as indicated on drawings. | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Midtown-Times Square | Initial Permit · Plumbing | $1M–5M | Plumbing work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Foundation | $1M–5M | Sidewalk Vault Repair | 🔒 Address & contractors |
| 2026-08-25 | Bronx · Westchester Square | Renewal Permit Without Changes · General Construction | $5M–10M | PS12X - FILING HEREWITH FOR THE LIBRARY UPGRADE OF THE SCHOOL. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. | 🔒 Address & contractors |
| 2026-08-25 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $1M–5M | MODIFICATION OF HVAC SYTSEM AND INSTALLATION AC UNITS. | 🔒 Address & contractors |
| 2026-08-25 | Queens · Jackson Heights | Initial Permit · Earth Work | $50M+ | FOUNDATION DESIGN TO FACILITATE CONSTRUCTON OF FITNESS CENTER AS EXTENSION IN EXISTING BUILDING | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $1M–5M | REMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS SHOWN ON DRAWINGS. SEE RELATED JOB NUMBERS LISTED ON PLANS :M01033942,M01033956,M01033949,M01059741 | 🔒 Address & contractors |
| 2026-08-24 | Bronx · Hunts Point | Renewal Permit with Changes · General Construction | $10M–50M | REMOVAL AND REPLACE THE EXTERIOR MASONRY FACADE AT 1ST AND 2ND FLOOR WITH INSULATED METAL PANELS. EXISTING EAST AND WEST MASONRY FACADE TO BE PAINTED WITH MINERAL BASE PAINT. NO CH | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Architectural changes on the 40th floor as indicated on drawings. | 🔒 Address & contractors |
| 2026-08-24 | Bronx · Hutchinson Metro Center | Renewal Permit with Changes · General Construction | $10M–50M | This General Construction application is filed for Phase II work amended under NB # 220243074 Doc 12 for the vertical & horizontal enlargement for addition of hotel on Tax Lot 1102 | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work as shown on plans filed herewith. | 🔒 Address & contractors |
| 2026-08-24 | Staten Island · Port Richmond | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of Mechanical system for a new 4 story building | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $1M–5M | Curtain wall snap cover and masonry facade repairs as per plans. No change to use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $5M–10M | Interior renovation of partitions, ceilings and doors for office tenant on 10C/11M floor. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-24 | Bronx · Hutchinson Metro Center | Renewal Permit Without Changes · Structural | $1M–5M | Structural application filed for Phase II work amended under NB # 220243074 Doc 12 for the vertical & horizontal enlargement for addition of hotel on Tax Lot 1102. Note that Zoning | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Financial District-Battery Park City | Renewal Permit with Changes · General Construction | $50M+ | CONVERSION FROM OFFICE (B) OCCUPANCY TO RESIDENTIAL (R-2) OCCUPANCY PURSUANT TO ARTICLE I, CHAPTER V OF THE NYC ZONING RESOLUTION AND ARTICLE 7B OF THE NYS MULTIPLE DWELLING LAW FO | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit with Changes · Full Demolition | $1M–5M | full demolition of five story structure using hand held and mechanical assist from within. | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · Structural | $1M–5M | Structural demolition including slab openings, mechanical bulkhead, and cooling tower enclosure | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Tribeca-Civic Center | Initial Permit · Structural | $1M–5M | Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Manhattanville-West Harlem | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work for Marshak Science Tower Post-Kathabar HVAC Upgrade, work include Heating and Cooling Coil Upgrades as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-24 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | REPLACE NON WORKING CHILLERS AT ROOF TOP MECHANICAL PENTHOUSE, PROVIDE EMERGENCY LIGHTING THROUGHOUT AND CORRIDOR LIGHTING AT BASEMENT LEVEL | 🔒 Address & contractors |
| 2026-08-24 | Manhattan · Financial District-Battery Park City | Renewal Permit Without Changes · General Construction | $1M–5M | Interior build out for school as per plans filed. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-21 | Queens · Kew Gardens Hills | Initial Permit · Structural | $1M–5M | Vertical and horiontal enlargement of existing building. Enlagement of cellar, first and second floor. Addition of attic. | 🔒 Address & contractors |
| 2026-08-21 | Bronx · West Farms | Renewal Permit Without Changes · General Construction | $1M–5M | INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. ROOF/BULKHEAD/PARAPET WORK. REPLACEMENT OF KITCHEN/BATHR FIXTURES. NEW LED INT/ EXT LIGHTING. MINOR M | 🔒 Address & contractors |
| 2026-08-21 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Renewal Permit Without Changes · Plumbing | $1M–5M | PROPOSED CIVIL PLUMBING WORK FOR ONE STORY PUMP STATION TO BE LOCATED WITHIN THE VICTORY BLVD RIGHT OF WAY NORTHWEST OF WILD AVENUE, ALL AS PER PLANS FILED HEREWITH. | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Repair of roof as shown on plans. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-21 | Queens · Maspeth | Initial Permit · General Construction | $1M–5M | PROPOSED 4 STORY MIXED USE BUILDING WITH EXISTING ELEMENTS TO REMAIN. | 🔒 Address & contractors |
| 2026-08-21 | Brooklyn · Greenpoint | Renewal Permit with Changes · General Construction | $1M–5M | REMOVAL OF MASONRY AND TOILET PARTITIONS; DOORS AND HARDWARE; TOILET FINISHES AND ACCESSORIES. INSTALLATION OF ELEVATOR, MASONRY, GYPSUM BOARD AND TOILET PARTITIONS; DOORS AND HARD | 🔒 Address & contractors |
| 2026-08-21 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Initial Permit · General Construction | $1M–5M | VERTICAL AND HORIZONTAL ENLARGEMENT OF EXISTING 1 STORY SCHOOL | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Financial District-Battery Park City | Renewal Permit with Changes · General Construction | $50M+ | Conversion and Enlargement of Existing Commercial Building to Residential. | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Harlem (North) | Initial Permit · General Construction | $5M–10M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Harlem (North) | Initial Permit · General Construction | $1M–5M | REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS, SUCH AS MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, PATCHING & CRACK REPAIR OF STONE & TERRACOTTA ORNAMENTATION, COPING STO | 🔒 Address & contractors |
| 2026-08-21 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work associated with the proposed renovation, as shown on plans filed herewith. No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · Greenwich Village | Initial Permit · General Construction | $1M–5M | Interior renovation of the 5th floor as shown on plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · Gramercy | Renewal Permit with Changes · General Construction | $1M–5M | Facade repair and miscellaneous exterior work related to the facade as per plans filed | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · East Harlem (South) | Renewal Permit with Changes · Plumbing | $1M–5M | Replace existing sanitary and domestic water risers to new fixtures; replace existing gas risers in kind, provide new gas connections to new kitchen stove as per plan, filed in con | 🔒 Address & contractors |
| 2026-08-20 | Queens · Queens Village | Renewal Permit Without Changes · General Construction | $1M–5M | Selective repairs and replacement of exterior masonry and parapets; select window replacement; select roof replacement; sheet waterproofing of foundation | 🔒 Address & contractors |
| 2026-08-20 | Brooklyn · Sunset Park (West) | Renewal Permit Without Changes · Plumbing | $1M–5M | Provide new ejector pump and associated piping. Provide new storm water piping and connect to new site storm piping. | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · East Village | Initial Permit · Mechanical Systems | $1M–5M | REPLACE (2) COOLING TOWERS WITH VRF HVAC SYSTEM AND ASSOCIATED DUCTWORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | 🔒 Address & contractors |
| 2026-08-20 | Bronx · Castle Hill-Unionport | Initial Permit · Plumbing | $1M–5M | NYCHA - REMOVE ALL EXISTING GAS PIPING AND REPLACED WITH NEW GAS PIPING INCLUDING RISER SUPPORTS, VALVES AND ACCESSORIES. | 🔒 Address & contractors |
| 2026-08-20 | Brooklyn · Gravesend (South) | Renewal Permit Without Changes · General Construction | $1M–5M | NEW FOUR (4) STORY COMMUNITY FACILITY BUILDING | 🔒 Address & contractors |
| 2026-08-20 | Brooklyn · East Williamsburg | Renewal Permit Without Changes · General Construction | $5M–10M | CONSTRUCTION OF 8 STORY MIXED USE NEW BUILDING. | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · General Construction | $1M–5M | (GENERAL CATALYST 9TH FL BUILD OUT) Filing herewith architectural plans to include interior renovation and general construction work on the 9th floor. There will be no change of us | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work filed in conjunction with ALT1#: 123923068 (No Work) and General Construction application (GC)#: M00461800 | 🔒 Address & contractors |
| 2026-08-20 | Brooklyn · Clinton Hill | Renewal Permit Without Changes · General Construction | $10M–50M | Architectural scope associated with the interior and exterior alteration of the Pratt ISC Building, change of the occupant load on the floors. No change to egress or use. | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · Tribeca-Civic Center | Initial Permit · Structural | $10M–50M | Structural work related to facade replacement as per plans. No change to use, egress, or occupancy. Related Job numbers: M01277287, M01283766 | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · Midtown-Times Square | Renewal Permit with Changes · General Construction | $10M–50M | Remedial Facade work associated with FISP cycle 9A as per plans filed herewith. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-08-20 | Queens · Astoria (East)-Woodside (North) | Renewal Permit with Changes · Earth Work | $1M–5M | FOUNDATION AND EARTHWORK. FILED IN CONJUNCTION WITH NB Q00696011 | 🔒 Address & contractors |
| 2026-08-20 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $10M–50M | INTERIOR TENANT IMPROVEMENTS, WORK TO INCLUDE NEW INTERCONNECTING STAIR AND FINISHES, NON-LOADBEARING PARTITIONS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCU | 🔒 Address & contractors |
| 2026-08-20 | Brooklyn · Sunset Park (Central) | Renewal Permit with Changes · General Construction | $50M+ | PROPOSED TWNENTY NINE (29) STORY MIXED-USED DEVELOPMENT | 🔒 Address & contractors |
| 2026-08-19 | Brooklyn · Park Slope | Renewal Permit with Changes · General Construction | $1M–5M | EXTERIOR MASONRY REPAIRS. NO CHANGE IN USE. OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-08-19 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | alterations to existing HVAC Systems as per plans filed herewith | 🔒 Address & contractors |
| 2026-08-19 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Architectural modifications taking place on 38th and 39th floors as per plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-19 | Queens · Astoria (Central) | Renewal Permit with Changes · General Construction | $1M–5M | Alt-CO for a mixed-use building consisting of 10-unit residential Dwelling units on upper floors, along with a community facility space on 1st floor/cellar. | 🔒 Address & contractors |
| 2026-08-19 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | General construction as per plans filed herewith. No change to use, bulk, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-19 | Queens · Richmond Hill | Renewal Permit Without Changes · General Construction | $10M–50M | Renovation and enlargement of Emergency Department | 🔒 Address & contractors |
| 2026-08-19 | Queens · Long Island City-Hunters Point | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Herewith filing Mechanical removals for early work | 🔒 Address & contractors |
| 2026-08-19 | Brooklyn · Bedford-Stuyvesant (West) | Initial Permit · General Construction | $1M–5M | PROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING THREE STORY BUILDING. | 🔒 Address & contractors |
| 2026-08-19 | Queens · Jamaica | Renewal Permit Without Changes · General Construction | $10M–50M | Interior renovation of public toilets and adjoining spaces, including removal and installation of non bearing partitions, fixtures and finishes. No change is proposed to use, occup | 🔒 Address & contractors |
| 2026-08-19 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | MISCELLANEOUS FACADE AND ROOF RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-18 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | Modification to mechanical systems as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-18 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Interior non-structural demolition as shown on the plans. | 🔒 Address & contractors |
| 2026-08-18 | Queens · Far Rockaway-Bayswater | Renewal Permit with Changes · General Construction | $1M–5M | REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR | 🔒 Address & contractors |
| 2026-08-18 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | General construction work for occupied passive recreation space on roof per BB 2018-002, Part E. Passive recreation fitout includes finishes and furnishing. No change in use, egres | 🔒 Address & contractors |
| 2026-08-18 | Manhattan · Murray Hill-Kips Bay | Renewal Permit with Changes · General Construction | $5M–10M | NYU - MSB Restack Build Out - MODIFICATIONS OF PARTITIONS, CEILING, DOORS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-18 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $5M–10M | Hereby filing Removal and installation of non-load bearing partitions and related finishes as shown on plans filed herewith. No change to use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-18 | Staten Island · Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights | Initial Permit · General Construction | $1M–5M | Filing herewith renovation to existing lifeguard house, pump buildings, and changing areas as indicated on plans. No change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-08-18 | Bronx · Pelham Parkway-Van Nest | Initial Permit · General Construction | $1M–5M | MASONRY RESTORATION, PARAPET REBUILDING AT THE MAIN ROOF, ATTIC VENT INSTALLATION, AND INSTALLATION OFCOPING MOUNTED RAILINGS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS | 🔒 Address & contractors |
| 2026-08-17 | Queens · Forest Hills | Renewal Permit Without Changes · General Construction | $1M–5M | facade repairwork as per plans filed herewith. no change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | Propose to change use on 1st, 2nd & 2nd Mezz Levels. Increase # of persons to 306 Persons per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Interior alteration of existing student toilet rooms into ADA accessible toilet rooms. Scope of work include installing new ADA compliant plumbing fixtures and accessories, new doo | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Midtown-Times Square | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $10M–50M | Interior renovation as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Inwood | Initial Permit · General Construction | $1M–5M | INTERIOR AND SELECT WINDOW REPLACEMENT IN-KIND OF EXISTING MULTIFAMILY BUILDING, RENOVATION OF INTERIOR SPACES AND CORRIDORS ON CELLAR & FIRST FLOOR. NO CHANGE TO EXISTING USE, OCC | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · East Village | Initial Permit · General Construction | $1M–5M | Filing for Plaza repairs as per plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-17 | Brooklyn · Coney Island-Sea Gate | Renewal Permit with Changes · Structural | $1M–5M | Modular construction for temporary use of holding facility for NY Aquarium. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit with Changes · General Construction | $1M–5M | REPAIRS TO FACADE INCLUDING REPLACEMENT OF DECORATIVE STONE ELEMENTS, PARAPETS, LINTELS AND DECORATIVE FEATURES. SEE DRAWINGS AND DETAILS HEREWITH FOR EXPLANATION OF WORK. | 🔒 Address & contractors |
| 2026-08-17 | Queens · Kew Gardens Hills | Initial Permit · Plumbing | $1M–5M | Existing area drains on 1st floor and 2nd floor to be replaced. Underground storm piping to be replaced. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | Interior demo (non-structural) & renovation of partitions, ceilings and doors for unit 7B. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-17 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Initial Permit · General Construction | $1M–5M | FILING HEREWITH INTERIOR REMOVALS TO EXISTING SPACES ON FLOORS SUBCELLAR, CELLAR, 1, MEZZANINE, 2, 3, 4, 5, 6, 7, AND 8 AS PER PLANS IN PREPARATION FOR THE FUTURE TENANT FIT OUT. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | General construction work on entire 6th floor as per plans. No change to use. egress or occupancy. | 🔒 Address & contractors |
| 2026-08-17 | Queens · Far Rockaway-Bayswater | Renewal Permit with Changes · General Construction | $1M–5M | REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR | 🔒 Address & contractors |
| 2026-08-17 | Brooklyn · Gravesend (West) | Renewal Permit Without Changes · Mechanical Systems | $5M–10M | K228-REPLACE AIR INTAKE LOUVERS,ROOFTOP GRAVITY VENTILATORS & SPLIT UNIT A/C WITH NEW. INSTALL AUTOMATIC CONTROLS INCLUDING SENSORS & MOTORIZED DAMPERS. | 🔒 Address & contractors |
| 2026-08-17 | Manhattan · Greenwich Village | Initial Permit · General Construction | $1M–5M | Demolition work completed under application # M01385345-I1 . Work under this application consist of construction building of interior partitions as shown on plans no change to use | 🔒 Address & contractors |
| 2026-08-14 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · Mechanical Systems | $1M–5M | STORE RENOVATION (ZARA) WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-14 | Manhattan · Financial District-Battery Park City | Initial Permit · Plumbing | $1M–5M | MPP PROJECT-000000526. PLEASE ASSIGN TO MPP EXAMINER. Plumbing work associated with the conversion of the building. | 🔒 Address & contractors |
| 2026-08-14 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Exterior wall repairs, including: Sealant replacement; EIFS repairs and coating; balcony waterproofing; painting of steel framing. | 🔒 Address & contractors |
| 2026-08-14 | Brooklyn · Mapleton-Midwood (West) | Initial Permit · General Construction | $1M–5M | APPLICATION FILED HEREWITH TO PARTIALY DEMOLISH EXISTING TWO (2) STORY BUILDING, MAINTAINING EXISTING FOUNDATION WALLS TO REMAIN, PROPOSE HORIZONTAL AND VERTICAL ENLARGEMENT AND OB | 🔒 Address & contractors |
| 2026-08-14 | Queens · Far Rockaway-Bayswater | Renewal Permit with Changes · General Construction | $1M–5M | REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR | 🔒 Address & contractors |
| 2026-08-14 | Manhattan · SoHo-Little Italy-Hudson Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-14 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | General Construction to take place on the 46th, 47th, and 48th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as 48th, 49 | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | REPLACE EXISTING WINDOWS WITH NEW,THERMALLY BROKEN ALUMINUM WINDOWS ON THE 3RD THRU 12TH FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · East Midtown-Turtle Bay | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION WORK TAKING PLACE ON THE 10TH CONSTRUCTION FLOOR (16TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-13 | Queens · Elmhurst | Renewal Permit Without Changes · Sprinklers | $1M–5M | Renovation of an existing labor and delivery suite - plumbing and sprinkler filing. | 🔒 Address & contractors |
| 2026-08-13 | Brooklyn · Borough Park | Initial Permit · General Construction | $1M–5M | HEREWITH FILING FOR VERTICAL AND HORIZONTAL ENLARGEMENT, AND INTERIOR RENOVATION | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Hell's Kitchen | Initial Permit · Structural | $1M–5M | Structural drawings filed herewith for alteration of existing church. | 🔒 Address & contractors |
| 2026-08-13 | Staten Island · Tompkinsville-Stapleton-Clifton-Fox Hills | Renewal Permit Without Changes · Earth Work | $1M–5M | New electrical components will be provided and new electrical equipment will be housed in a new designated electrical building. An emergency generator will also be provided. | 🔒 Address & contractors |
| 2026-08-13 | Queens · Richmond Hill | Initial Permit · General Construction | $1M–5M | Herewith filing alteration for early removals of existing scope with related separate removal applications as follows: Elevator, Fuel Tank, and Sprinkler | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Harlem (North) | Renewal Permit Without Changes · Sprinklers | $5M–10M | THIS APPLICATION IS FILED FOR THE INSTALLATION OF NEW SPRINKLERS. | 🔒 Address & contractors |
| 2026-08-13 | Brooklyn · Crown Heights (South) | Initial Permit · General Construction | $1M–5M | K528: Third Floor Gymnasium Upgrade including room Conversions/Partitioning. | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $5M–10M | General construction for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44) | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · General Construction | $1M–5M | CHNY Bed Tower floors 4, 5, and 6. Modifications to partitions and finishes to accommodate a horizontal exit for the adjacent building which is located on the same tax lot and und | 🔒 Address & contractors |
| 2026-08-13 | Bronx · University Heights (North)-Fordham | Renewal Permit with Changes · General Construction | $1M–5M | PROPOSED THREE STORIES SCHOOL UG.3 ON TOP OF EXISTING THREE STORIES COMMERCIAL WITH A TOTAL OF SIX STORIES BUILDING | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Interior renovation of existing office space including partitions, doors, walls, floors, ceilings on the 25th Floor (Geico), as per plans. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-13 | Brooklyn · Williamsburg | Renewal Permit Without Changes · General Construction | $1M–5M | (Please assign to Central Hub.) PROPOSING VERTICAL AND HORIZONTAL ENLARGEMENT TO AN EXISTING THREE STORY BUILDING. | 🔒 Address & contractors |
| 2026-08-13 | Queens · Far Rockaway-Bayswater | Initial Permit · General Construction | $1M–5M | Filing herewith to erect a one-story comfort station as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Tribeca-Civic Center | Initial Permit · Mechanical Systems | $1M–5M | Modification to existing Mechanical systems as per plans filed herewith; Replacement of five (5) fluid coolers on the 15th floor & Provisions for portable A/C units on the 10th Flo | 🔒 Address & contractors |
| 2026-08-13 | Queens · Far Rockaway-Bayswater | Renewal Permit with Changes · General Construction | $1M–5M | REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR | 🔒 Address & contractors |
| 2026-08-13 | Queens · Far Rockaway-Bayswater | Renewal Permit with Changes · General Construction | $1M–5M | REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGR | 🔒 Address & contractors |
| 2026-08-13 | Queens · Douglaston-Little Neck | Renewal Permit with Changes · General Construction | $1M–5M | FILING HEREWITH RENOVATION OF EXISTING 1ST FLOOR SPACE INTO NEW AMENITY CENTER. INSTALLATION OF NEW NON-LOAD BEARING PARTITIONS, LIGHTING WITH NEW FINISHES AND WALL PROTECTION. | 🔒 Address & contractors |
| 2026-08-13 | Manhattan · Hamilton Heights-Sugar Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | PROPOSED RECONSTRUCTION OF THE EXISTING HVAC SYSTEM LOCATED AT JACKIE ROBINSON RECREATION CENTER. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-12 | Staten Island · Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights | Initial Permit · General Construction | $1M–5M | Interior alteration of approx. 15332 sq.ft. of the existing Seaview Administration building to construct a new non-profit institution with sleeping accommodations occupancy class I | 🔒 Address & contractors |
| 2026-08-12 | Queens · Bayside | Initial Permit · General Construction | $1M–5M | ALTCO FILED FOR AN ENLARGEMENT OF THE 4TH FLOOR WEST WING PORTION OF THIS HOSPITAL AS PER PLANS FILED HEREWITH. | 🔒 Address & contractors |
| 2026-08-12 | Brooklyn · Prospect Park | Initial Permit · General Construction | $5M–10M | Interior Renovation of 3rd floor and mez.3 associated with the GC scope. No change in use, egress, or occupancy under this application. | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Upper East Side-Yorkville | Initial Permit · Mechanical Systems | $1M–5M | INSTALL NEW HVAC UNITS, DUCTWOR, EXHAUST FANS, AND RELATED DUCTWORK. | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Washington Heights (North) | Initial Permit · General Construction | $1M–5M | Room 318: Remove existing since lab and associated equipment / finishes; Replace finishes and move college office furniture to this room. | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $1M–5M | General construction alterations on the 1st thru 4th floors and roof level for proposed full building renovation and tenant fit-tout; related work as per plans. No proposed change | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · East Harlem (South) | Initial Permit · General Construction | $1M–5M | HEREWITH FILING FOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILINGS INCLUDING THE REMOVAL EXISTING EXTERIOR CLADDING ONLY AS PER PLANS. | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Chelsea-Hudson Yards | Renewal Permit Without Changes · General Construction | $1M–5M | General construction alterations on the 1st thru 4th floors for proposed change of use/occupancy; related work as per plans. | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Gramercy | Renewal Permit Without Changes · General Construction | $1M–5M | NYU Medical Center -HJD Loading Dock - MODIFICATIONS OF PARTITIONS, DOORS, CEILING AND FLOOR ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-12 | Brooklyn · Sunset Park (West) | Initial Permit · General Construction | $1M–5M | Interior removals of partitions, ceilings, light fixtures, interior mechanical equipment and ductwork, plumbing fixtures (LAA). | 🔒 Address & contractors |
| 2026-08-12 | Bronx · Riverdale-Spuyten Duyvil | Initial Permit · General Construction | $1M–5M | DEMOLITION OF EXISTING STAIRCASE, CONSTRUCTION OF NEWSTAIRCASE TO INCLUDE STONE VENEER CONCRETE RETAINING WALLS, GRANITECAPSTONES, GRANITE STAIR TREADS ON CONCRETE FOUNDATIONS.PLAN | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | HVAC modifications to accommodate interior alterations on partial floors 4, 5 and 6 in the existing CHNY hospital building as per plans filed herewith only. Connect to the existin | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | GENERAL CONSTRUCTION TAKING PLACE ON CELLAR & 1ST FL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · General Construction | $1M–5M | NONSTRUCTURAL INTERIOR DEMOLITION ON FLOORS CELLAR TO 05. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-12 | Bronx · Pelham Bay-Country Club-City Island | Initial Permit · Support of Excavation | $1M–5M | SOE work in conjunction with NB application | 🔒 Address & contractors |
| 2026-08-12 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-08-12 | Queens · Long Island City-Hunters Point | Initial Permit · Structural | $1M–5M | FILING HEREWITH STRUCTURAL WORK ON THE BASEMENT, 1ST THROUGH 9TH FLOOR AND ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · Upper East Side-Carnegie Hill | Initial Permit · General Construction | $1M–5M | STRUCTURAL WORK INCLUDING PARTIAL STRUCTURAL DEMOLITION OF 5 STORY BUILDING. FOUNDATION AND STRUCTURAL WORK INCLUDING STEEL AND CONCRETE WORK FOR PROPOSED 4 STORY BUILDING IN CONJU | 🔒 Address & contractors |
| 2026-08-11 | Bronx · Kingsbridge-Marble Hill | Initial Permit · Structural | $1M–5M | Retaining wall repairs as per plans filed herewith. No change in use, occupancy or egress. | 🔒 Address & contractors |
| 2026-08-11 | Brooklyn · Brooklyn Heights | Renewal Permit with Changes · Structural | $5M–10M | General Construction & Structural work per 8th & 9th Cycle FISP facade repairs at main, bulkhead, second floor plaza/terrace roof replacement including construction of new mechanic | 🔒 Address & contractors |
| 2026-08-11 | Bronx · Pelham Bay Park | Renewal Permit with Changes · General Construction | $5M–10M | Job to be assigned to development hub as per our HUB consultation. Filing herewith for 1 story Ammunition building as per plans filed herewith. | 🔒 Address & contractors |
| 2026-08-11 | Brooklyn · Prospect Heights | Initial Permit · Mechanical Systems | $1M–5M | RENOVATION OF AN EXISTING THREE-STORY WITH BASEMENT AND CELLAR MASONRY ROW-HOUSE, INCLUDING ARCHITECTURAL, MECHANICAL, PLUMBING, SPRINKLER AND STRUCTURAL | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Filing herewith facade work, cladding replacement at existing Citi Bank. No building structure work. No change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · Murray Hill-Kips Bay | Renewal Permit Without Changes · General Construction | $1M–5M | RENOVATION OF EXISTING PLAZA TO INCLUDE REPLACEMENT OF PAVING, THE REPLACEMENT AND ADDITION OF LIGHTING, PLANTERS, AND STAIRS, AS WELL AS THE ADDITION OF RAMPS TO COMPLY WITH ADA R | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · Upper East Side-Carnegie Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Install HVAC units and components for Chase Bank. No changes to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · East Village | Initial Permit · General Construction | $1M–5M | General construction for Xantium Investments on 12th floor | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · East Harlem (North) | Initial Permit · General Construction | $1M–5M | Modification of existing storefront facade to include new glazing, construction of new tenant layout, new doors and partitions to accommodate layout for Planet Fitness fitout. No | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $10M–50M | Removal/installation of interior non-bearing partitions & related finishes. No change in use, egress or occupancy | 🔒 Address & contractors |
| 2026-08-11 | Manhattan · Midtown South-Flatiron-Union Square | Renewal Permit Without Changes · General Construction | $1M–5M | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-11 | Queens · Astoria (Central) | Initial Permit · Mechanical Systems | $1M–5M | Mount Sinai - Mechanical modifications related to the new Intensive care unit as per plans filed herewith. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-10 | Queens · Fresh Meadows-Utopia | Renewal Permit with Changes · Mechanical Systems | $1M–5M | PROPOSED TWO STORY + CELLAR (1) FAMILY HOUSE AS PER DRAWING HEREWITH FILED TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-10 | Manhattan · East Harlem (South) | Initial Permit · General Construction | $1M–5M | GC: Exterior Renovation and Interior Repair Work. ST: Construction of Masonry Infill Wall. No change in Use, Occupancy, or Egress. | 🔒 Address & contractors |
| 2026-08-10 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · General Construction | $1M–5M | REPLACEMENT OF WINDOWS INCLUDING BLOCKING, SHADES & GUARDS. PLASTER & PAINTING REPAIRS. REMOVAL AND REBUILDING OF WINDOW SILL AT AREAWAY. MASONRY REPAIRS. NO CHANGE TO EGRESS, OCCU | 🔒 Address & contractors |
| 2026-08-10 | Queens · Jamaica | Renewal Permit Without Changes · Plumbing | $1M–5M | P.S. 95-Q: UNDERGROUND PLUMBING WORK TYPE FOR A NEW SCHOOL BUILDING. | 🔒 Address & contractors |
| 2026-08-10 | Brooklyn · Williamsburg | Initial Permit · Construction Fence | $1M–5M | Installation of 8' temporary construction fence | 🔒 Address & contractors |
| 2026-08-10 | Brooklyn · Brownsville | Initial Permit · General Construction | $1M–5M | K833 Temporary Classroom Units installation. | 🔒 Address & contractors |
| 2026-08-10 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | Select facade repairs on all elevations and roof as indicated on drawings. | 🔒 Address & contractors |
| 2026-08-10 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Initial Permit · General Construction | $1M–5M | Tenant build out partial 8th floor to accommodate NORTHWELL HEALTH OUTPATIENT FACILITY. | 🔒 Address & contractors |
| 2026-08-10 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · General Construction | $1M–5M | General Construction for Facade Modifications as shown on plans filed herewith. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-10 | Queens · Far Rockaway-Bayswater | Initial Permit · General Construction | $10M–50M | New Building for Brunswick Shelter for Adult Families (UG# 5 Transient Hotel, 3-story with cellar). Development HUB Consultation Accepted on April 8, 2022. | 🔒 Address & contractors |
| 2026-08-10 | Brooklyn · Fort Greene | Initial Permit · Mechanical Systems | $1M–5M | REPLACEMENT OF EXHAUST FANS, H&V UNITS, RADIATORS VALVES, AND LOBBY HEATING SYSTEM AS SHOWN ON PLANS | 🔒 Address & contractors |
| 2026-08-10 | Brooklyn · Bushwick (West) | Initial Permit · General Construction | $1M–5M | Interior renovation of retail space in the cellar, 1st fl, & Roof, including tenant improvement, interior metal stud framing, interior finishes, and interior partitions. Related St | 🔒 Address & contractors |
| 2026-08-10 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit with Changes · Structural | $10M–50M | SWARMP REPAIR AT GREENBERG PAVILION FACADE, CEILING ABOVE FDR DRIVE, 1ST FL AND PARKING LEVEL INCLUDING REPAIR STEEL DECKING AND CONCRETE, AND PRECAST STONE FACADE AS INDICATED ON | 🔒 Address & contractors |
| 2026-08-10 | Bronx · Pelham Parkway-Van Nest | Initial Permit · Mechanical Systems | $1M–5M | MECHANICAL WORRK AS PER PLANS FILED HEREWITH. WORK INCLUDES MECHANICAL DUCT MODIFICATIONS, DAMPERS, AND OTHER WORK IN CONJUNCTIONWITH RENOVATIONS. NO CHANGE TO USE, EGRESS, OR OCCU | 🔒 Address & contractors |
| 2026-08-10 | Queens · Corona | Initial Permit · General Construction | $1M–5M | Q061_ Conversion of existing rooms on the second floor into additional classrooms as part of the Class Reduction Program. No change in use, egress, or occupancy is proposed under t | 🔒 Address & contractors |
| 2026-08-10 | Manhattan · Midtown-Times Square | Renewal Permit with Changes · General Construction | $1M–5M | RENOVATION AND VERTICAL ENLARGEMENT OF EXISTING OFFICE BUILDING TO SELF SERVICE STORAGE FACILITY. APP FILED IN CONJ W/M01004304-I1 (FO), M01003551-S1 (ST), M01003551-S2 (MS), M0100 | 🔒 Address & contractors |
| 2026-08-10 | Brooklyn · Borough Park | Initial Permit · Structural | $1M–5M | INSTALLATION OF INFILL SLABS AT THE 2ND FL & ROOF LEVEL, INSTALLATION OF NEW DUNNAGE & BULKHEAD SUPPORT AT ROOF LEVEL, INSTALLATION OF NEW STEEL BEAMS TO SUPPORT A REVISED SLAB PER | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · Midtown-Times Square | Renewal Permit Without Changes · Sprinklers | $1M–5M | Modification to existing Plumbing fixtures, Sprinkler System, and Standpipe system as per plans filed herewith; No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | INTERIOR RENOVATION OF 2ND-7TH FLOOR AT EXISTING HOTEL:REPLACE CARPETS IN HALLWAY, REPLACE TILE FRONT OF ELEVATOR AREA, REPLACE CARPETS IN ROOMS TO VINYL FLOOR. AND WALL PANEL, REP | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · Financial District-Battery Park City | Initial Permit · General Construction | $1M–5M | Interior renovation of existing office space at floors 17, 18, and 19 as per plans filed. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-07 | Brooklyn · Gravesend (West) | Initial Permit · General Construction | $5M–10M | Vertical extension to existing educational building. | 🔒 Address & contractors |
| 2026-08-07 | Brooklyn · Williamsburg | Renewal Permit Without Changes · General Construction | $1M–5M | FILING HEREWITH FOR RENOVATIONS CHANGE OF USE AND OCCUPANCY FROM OFFICE AND VETERINARIAN CLINIC UG6 TO ART STUDIOS UG9A, AND PENTHOUSE ADDITION TO COMMERCIAL BUILDING INCLUDING NEW | 🔒 Address & contractors |
| 2026-08-07 | Queens · Queensbridge-Ravenswood-Dutch Kills | Renewal Permit Without Changes · General Construction | $1M–5M | STRUCTURAL WORK WILL BE PERFORMED ON THE EXISTING FIREHOUSE. A NEW FLOOR SLAB WILL BE REMOVED AND INSTALLED ON A PORTION OF THE FIRST FLOOR AND CELLAR AS PLANS. NO CHANGE OF USE OR | 🔒 Address & contractors |
| 2026-08-07 | Staten Island · Great Kills-Eltingville | Renewal Permit Without Changes · General Construction | $1M–5M | This application is for the Rehabilitation of the Existing Richmond Ave Pumping Station Pump Building which consists of site civil, system hydraulics, structural/architectural, mec | 🔒 Address & contractors |
| 2026-08-07 | Queens · Long Island City-Hunters Point | Initial Permit · General Construction | $1M–5M | FILING HEREWITH RENOVATION ON THE BSMT, 1 THRU 9TH FLOOR , ROOF AS INDICATED ON THE DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-07 | Queens · Elmhurst | Renewal Permit Without Changes · General Construction | $5M–10M | NEW 5-STORY FIRE STATION BUILDING WITH CELLAR AS PER PLANS FILED HEREWITH. HUB CONSULTATION ACCEPTED ON 8/31. | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · Murray Hill-Kips Bay | Initial Permit · Structural | $1M–5M | Structural modifications taking place on the 1-2nd floors, 2nd floor Mezzanine and roof as indicated on the drawings. | 🔒 Address & contractors |
| 2026-08-07 | Queens · Hollis | Renewal Permit Without Changes · General Construction | $1M–5M | HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING BUILDING FOR PROPOSED DAY CARE CENTER. | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $5M–10M | Interior tenant fit-out and related finishes as per plans. | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · East Harlem (South) | Initial Permit · Mechanical Systems | $1M–5M | MS - GP6 - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-07 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | HVAC modifications and associated ductwork for tenant fit-out as per plans. | 🔒 Address & contractors |
| 2026-08-06 | Brooklyn · Downtown Brooklyn-DUMBO-Boerum Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | REMOVE/INSTALL MS EQUIPMENT, DUCTWORK, PIPING + CTRLS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-06 | Brooklyn · Greenpoint | Initial Permit · General Construction | $1M–5M | APPLICATION FILED HEREWITH FOR VERTICAL & HORIZONTAL ADDITION AND INTERIOR RENOVATIONS TO EXISTING ONE STORY AND CELLAR BRICK BUILDING. | 🔒 Address & contractors |
| 2026-08-06 | Queens · Long Island City-Hunters Point | Renewal Permit Without Changes · General Construction | $5M–10M | 6-STORY NEW BUILDING. | 🔒 Address & contractors |
| 2026-08-06 | Queens · Kew Gardens Hills | Initial Permit · Earth Work | $1M–5M | civil work at Razran hall, earth and excavation work as per plans | 🔒 Address & contractors |
| 2026-08-06 | Brooklyn · Gravesend (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | K358 : Installation of the Mechanical System with Heating System, Ventilation System, Air Conditioning System. No Change in Use, Egress or Occupancy. | 🔒 Address & contractors |
| 2026-08-06 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Facade repairs and maintenance as per plans filed herewith. No change to use, bulk, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-06 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Structural | $1M–5M | STRUCTURAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-06 | Manhattan · Harlem (North) | Renewal Permit Without Changes · General Construction | $1M–5M | REHABILITATION OF EXISTING SCHOOL TO PROVIDE ACCESS TO THE HANDICAPPED. PROVISION OF NEW ELEVATOR, RAMPS, WHEELCHAIR LIFT AND ACCESSIBLE TOILETS. PROVISION OF HOLDING ROOMS. | 🔒 Address & contractors |
| 2026-08-06 | Queens · Kew Gardens Hills | Renewal Permit Without Changes · General Construction | $1M–5M | Queens College, Rufus King Hall Removal & replacement of existing windows with new windows (221) & AC brackets (46). Repairs of masonry at window sill. Repairs of cracked/spalled | 🔒 Address & contractors |
| 2026-08-06 | Manhattan · Manhattanville-West Harlem | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | The Mechanical work shall comply with MC 107, MC 1202 materials, MC 1203 Joints, MC 1204 insulation, MC 1205 valves, MC 1206 installation, and MC 1208 testing. | 🔒 Address & contractors |
| 2026-08-06 | Manhattan · Chinatown-Two Bridges | Renewal Permit Without Changes · General Construction | $1M–5M | Main roof & 12th floor Terraces roof restorations work including remove existing and install new roof system & railings. All work as per plans submitted. No change in use, occupa | 🔒 Address & contractors |
| 2026-08-05 | Queens · Kew Gardens Hills | Renewal Permit Without Changes · General Construction | $1M–5M | Queens College, Delany Hall, Replacement/Recoating/Repairs of existing damaged wood framing, stucco & membrane roofing system, exterior windows, entrance concrete stair, brick maso | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Manhattanville-West Harlem | Renewal Permit Without Changes · General Construction | $1M–5M | Full removal of the detached temporary classroom building including all electrical, mechanical, fire alarm and restoration of the play yard. Limited building alteration scope of w | 🔒 Address & contractors |
| 2026-08-05 | Queens · Richmond Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Mechanical work associated with the replacement of 3 Existing boilers , new Breeching, Dampers, chemical feeds , Steam valves and traps, new exhaust fans,1 new Split A/C unit. new | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $1M–5M | Modification to HVAC systems on 44th FL (64M). No change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-08-05 | Brooklyn · East Williamsburg | Renewal Permit Without Changes · General Construction | $1M–5M | FILED HEREIN VERITICAL AND HORIZONTAL EXTENSION ON EXISTING 3 STORY + CELLAR BUILDING (MIXED USE, STORE + 2 DWELLINGS); PROPOSED CONVERSION TO 4 STORY + CELLAR BUILDING, RESIDENTIA | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · SoHo-Little Italy-Hudson Square | Initial Permit · General Construction | $1M–5M | general construction on 7th floor as per plans filed herewith. no changes in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-05 | Brooklyn · Bushwick (West) | Initial Permit · General Construction | $1M–5M | Exterior facade and roof restoration as indicated on drawings. | 🔒 Address & contractors |
| 2026-08-05 | Brooklyn · Carroll Gardens-Cobble Hill-Gowanus-Red Hook | Initial Permit · Earth Work | $1M–5M | Reso A playground upgrade. New work will include new playground, basketball court, storm drainage system, turf field, landscape areas, track, and kickball field. | 🔒 Address & contractors |
| 2026-08-05 | Brooklyn · East Williamsburg | Initial Permit · General Construction | $1M–5M | ALTERATION TYPE 1 APPLICATION TO EXISTING 3 STORYPROPOSED 4 STORY + CELLAR +PH MIXED USE BUILDING. PROPOSED 8 DWELLING UNITS | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION MODIFICATIONS ON THE 6th FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | Convert existing office building into art gallery. Work includes general construction and installation of new egress stairs. Building will be occupied by a single tenant. GC demo | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | REMOVAL AND INSTILLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES. FILED IN CONJUCTION WITH NEW BUILDING APPLICATION 121209192. MPP 47. | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Harlem (North) | Initial Permit · Structural | $1M–5M | EMERGENCY CONCRETE REPAIRS TO THE INTERIOR OF AN EXISTING BUILDING IN THE CELLAR, PIPE ACCESS SPACE, COAL BUNKER, PUMP ROOM AND BOILER ROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | UBIQUANT-- General construction for office remodel as per plans filed. No change to use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-05 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · General Construction | $1M–5M | HH 02 CATH LABS & HYBRID OR: MODIFICATION OF INTERIOR PARTITIONS AND FINSIHES TO ACCOMMODATE THE CATH LAB AND HYBRID ORS RENOVATION WITHIN THE EXISITNG HOSPITAL BUILDING AS PER PL | 🔒 Address & contractors |
| 2026-08-04 | Brooklyn · Sunset Park (West) | Initial Permit · Mechanical Systems | $1M–5M | NYULH BROOKLYN - 3500 ONCOLOGY BEDS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Standpipe | $1M–5M | Modification to existing plumbing,sprinkler and standpipe systems on 44th (64th M) floor. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Standpipe | $1M–5M | Modification to existing plumbing,sprinkler and standpipe systems. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Manhattanville-West Harlem | Renewal Permit Without Changes · General Construction | $1M–5M | Proposed interior renovation of North Academic Center on the first floor. Work includes but not limited to ..... No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-04 | Brooklyn · Sunset Park (West) | Initial Permit · Mechanical Systems | $1M–5M | PROVIDE NEW EXHAUST FANS TO ACCOMMODATE NEW & UPGRADED TOILETS, INSTALL NEW OR MODIFY EXISTING DUCTWORK, MODIFY & REPLACE SUPPLY DUCTWORK DISTRUBUTION & FIN TUBE CONVECTORS, PROVID | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Midtown-Times Square | Initial Permit · General Construction | $1M–5M | proposed sidewalk vault repairs as per plans filed herewith. no change to use, egress or occupancy | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Tribeca-Civic Center | Initial Permit · General Construction | $50M+ | Removal of non-load bearing partitions, ceilings, & elements as per plans. Removal of a column & slab opening at the lobby entry. Modifications to the layout & finishes primarily a | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Upper West Side-Lincoln Square | Initial Permit · General Construction | $1M–5M | Installation of new finish flooring at first floor and mezzanine as shown on drawings. No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-04 | Brooklyn · Crown Heights (North) | Renewal Permit with Changes · General Construction | $1M–5M | PROPOSED CHANGE OF USE OF EXISTING U.G. III SCHOOL TO U.G. II RESIDENCES BY UTILIZING ART. I CHAPTER 5 OF NYC ZONING RESOLUTION AND A VERTICALLY ENLARGEMENT. PROPOSED 27 CONVERTED | 🔒 Address & contractors |
| 2026-08-04 | Staten Island · New Springville-Willowbrook-Bulls Head-Travis | Renewal Permit Without Changes · Structural | $1M–5M | Structural work proposed for one story Pump Station to be located within the Victory Blvd. right of way Northwest of Wild Avenue, at new address 4465 Victory Blvd.All as per plans | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Hell's Kitchen | Renewal Permit Without Changes · General Construction | $1M–5M | FILING TO REPLACE EXG FILL PORT SPILL CTNR OF (2) 3,000-GAL GAS, (1) 3,000-GAL RENEW DL, (1) 2,000-GAL MOT OIL, (1) 2,000-GAL HYD OIL USTS, EXG TANK TOP SUMPS OF (2) 3,000-GAL GAS, | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Stuyvesant Town-Peter Cooper Village | Initial Permit · Mechanical Systems | $1M–5M | Removal + installation existing HVAC rooftop units, ductwork + assoc diffusers, exhaust fans + existing louvers. new ERV unit w/assoc supply + exhaust ductwork, power + control w | 🔒 Address & contractors |
| 2026-08-04 | Queens · Bay Terrace-Clearview | Initial Permit · Mechanical Systems | $10M–50M | Q169-NEW HEAT PUMP, OUTDOOR AIR SYSTEM, SPLIT UNIT, FANS & ASSOCIATED DUCTS & PIPING. | 🔒 Address & contractors |
| 2026-08-04 | Brooklyn · Prospect Heights | Initial Permit · Structural | $1M–5M | Facade repairs as per plans. No change in use, egress or occupancy under this application. | 🔒 Address & contractors |
| 2026-08-04 | Queens · Long Island City-Hunters Point | Initial Permit · Plumbing | $1M–5M | NEW DOMESTIC WATER BOOSTER PUMP IN BSMT, 1 RPZ ON 9TH FLR, 3 WASH STATIONS IN BSMT, 16 FLR DRAINS IN BSMT, 2 SEWER EJECTORS IN SUB BSMT, 3 FLR DRAINS ON 9TH FLR, 1 FLOOR DRAIN ON 7 | 🔒 Address & contractors |
| 2026-08-04 | Staten Island · Tottenville-Charleston | Renewal Permit Without Changes · General Construction | $1M–5M | PROPOSED TWO STORY ADDITION TO EXISTING 1 STORY BUILDING. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Gramercy | Initial Permit · General Construction | $1M–5M | Interior renovation to include demolition of existing and construction of new partitions. no change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Financial District-Battery Park City | Initial Permit · Mechanical Systems | $1M–5M | Mechanical work associated with the conversion of the building. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $1M–5M | Modification to HVAC systems on 41st Fl (61 M). No change to use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-04 | Queens · Richmond Hill | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | Installation of new 2.5MW emergency diesel generator. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $5M–10M | REMOVAL & RENOVATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 43RD FL (63M). NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Greenwich Village | Renewal Permit Without Changes · General Construction | $1M–5M | South and east facades, and southwest corner return restoration, including repairs and replacement of terra cotta and brick masonry units, and repairs of wood windows, as per drawi | 🔒 Address & contractors |
| 2026-08-04 | Staten Island · Oakwood-Richmondtown | Renewal Permit Without Changes · General Construction | $1M–5M | REPLACEMENT OF HVAC AND ELECTRICAL EQUIPMENT AND ARCHITECTURAL UPGRADES TO EXISTING MAINTENANCE BUILDING ALONG WITH STRUCTURAL CONCRETE EQUIPMENT PADS IN EXISTING MAINTENANCE BUILD | 🔒 Address & contractors |
| 2026-08-04 | Staten Island · Oakwood-Richmondtown | Renewal Permit Without Changes · General Construction | $50M+ | REPURPOSE EXISTING AIR PLENUMN INTO NEW ELEC ROOM; INSTALL NEW DIRECT-BURIED ELECTRICAL CABLES & CMU VESTIBULES; REPLACE HVAC & ELECTRICAL EQUIP & ROOFING MEMBRANE, ARCH UPGRADES, | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $5M–10M | REMOVAL & RENOVATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS ON 41ST FLOOR (61ST M). NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $1M–5M | Removal of existing gas-fired rooftop units, split systems, exhaust fans, indoor gas fired unit heaters, and gas fired boiler and domestic water heater and associated gas piping. I | 🔒 Address & contractors |
| 2026-08-04 | Manhattan · Midtown South-Flatiron-Union Square | Initial Permit · General Construction | $1M–5M | GENERAL CONSTRUCTION MODIFICATIONS ON THE 6th th FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-03 | Queens · Long Island City-Hunters Point | Initial Permit · General Construction | $1M–5M | Project scope is abatement and removal of existing windows and masonry infill at 5th floor and 6th floor. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Hamilton Heights-Sugar Hill | Initial Permit · General Construction | $1M–5M | FILING HEREWITH MODERATE REHABILITATION OF AN EXISTING BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS, OROCCUPANCY IS PROPOSED UNDER THIS APPLICATION. | 🔒 Address & contractors |
| 2026-08-03 | Brooklyn · Brownsville | Renewal Permit Without Changes · General Construction | $1M–5M | Facade restoration at Howard House #4 to comply with LL 11/98, Cycle 9 report. No change in use, egress, or occupancy. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · East Midtown-Turtle Bay | Renewal Permit Without Changes · General Construction | $1M–5M | PAA filed to correct floor from SC to SC1. No change to plans. | 🔒 Address & contractors |
| 2026-08-03 | Staten Island · Port Richmond | Renewal Permit Without Changes · General Construction | $10M–50M | PR-138 PORT RICHMOND WRRF HEADWORKS IMPROVEMENTS PROJECT INCLUDES REPLACEMENT OF MECHANICAL EQUIPMENT, CONSTRUCTION OF NEW INTERIOR ELECTRICAL ROOM, INSTALLATION OF PRESSURIZED VES | 🔒 Address & contractors |
| 2026-08-03 | Brooklyn · Brownsville | Initial Permit · General Construction | $1M–5M | The scope of work includes but is not limited to replacing existing metal stairs outside the mechanical room, and concrete and brick repair. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Tribeca-Civic Center | Initial Permit · General Construction | $1M–5M | Interior tenant fit out for Chase Bank. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $5M–10M | Modification to HVAC systems on 40th & 42nd Floors (60 & 62 M). No change in use egress or occupancy. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Chelsea-Hudson Yards | Renewal Permit with Changes · General Construction | $10M–50M | EXISTING 13 STORY BRICK FACADE BUILDING, CHANGE OF USE FROM OFFICE TO RESIDENTIAL FOR FLOORS 4-13 AND SOUTH ENVELOPE MODIFICATION. ALL LIFE SAFETY SYSTEMS TO BE MAINTAINED PER COD | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $5M–10M | REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 44TH FL (64 M). NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-03 | Brooklyn · Prospect Lefferts Gardens-Wingate | Initial Permit · General Construction | $10M–50M | NYC DEVELOPMENT HUB CONSULTATION ACCEPTED ON 7/9/2022. SPARROW SQUARE (SHL2) - FILING FOR A NEW BUILDING FOR CONGREGATE LIVING (HOMELESS SHELTER). IN CONJUNCTION WITH NEW BUILDINGS | 🔒 Address & contractors |
| 2026-08-03 | Brooklyn · Sunset Park (East)-Borough Park (West) | Initial Permit · General Construction | $1M–5M | PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT ON A 2 STORY BUILDING. OBTAIN NEW C OF O. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · East Harlem (South) | Renewal Permit Without Changes · General Construction | $1M–5M | Application filed for interior partitions in Penthouse A as per drawings filed herewith. No change to use, egress or occupancy as a part of this application. | 🔒 Address & contractors |
| 2026-08-03 | Bronx · Concourse-Concourse Village | Renewal Permit Without Changes · Structural | $1M–5M | Structural framing and foundation work for museum tenant fit out filed in conjunction with HUB NB #210179929. (Hub consultation 9/5/24. S Pavan Ok to assign to S Linehan examiner) | 🔒 Address & contractors |
| 2026-08-03 | Brooklyn · Brownsville | Renewal Permit Without Changes · General Construction | $1M–5M | Roofing Replacement and Roof Structure Renovation | 🔒 Address & contractors |
| 2026-08-03 | Bronx · Concourse-Concourse Village | Renewal Permit Without Changes · General Construction | $10M–50M | Replacement of Elevators & Assoc. Equip. in EMR.(16) General Passenger Elevators Cars, (2) Judges Elevators w/ card access, (1) Person in custody elevator w/ security camera, (1) F | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Chelsea-Hudson Yards | Initial Permit · General Construction | $10M–50M | REMOVAL & RENOVATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON 40TH AND 42ND FLOORS (60TH & 62ND M). NO CHANGE IN USE, EGRESS OR OCCUPANCY. | 🔒 Address & contractors |
| 2026-08-03 | Queens · Richmond Hill | Initial Permit · Mechanical Systems | $1M–5M | Removal & installation of mechanical unit and associated duct, & piping related to Electrification/Heat pump systems and Electrical service upgrade at Q273 | 🔒 Address & contractors |
| 2026-08-03 | Bronx · Kingsbridge-Marble Hill | Initial Permit · General Construction | $1M–5M | Facade restoration, lintel replacement, brick replacement, repointing, sill replacement, bulkhead brick pining, roof parapet replacement with new railing . No change in use, egres | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Washington Heights (South) | Renewal Permit Without Changes · Mechanical Systems | $1M–5M | HH 02 CATH LABS & HYBRID OR: MODIFICATION OF HVAC DUCTWORK, PIPING AND EQUIPMENT TO ACCOMMODATE THE CATH LAB AND HYBRID ORS RENOVATION WITHIN THE EXISITNG HOSPITAL BUILDING AS PER | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Chelsea-Hudson Yards | Initial Permit · Mechanical Systems | $1M–5M | Modification to HVAC systems on 43rd Fl (63 M). No change in use, egress or occupancy. | 🔒 Address & contractors |
| 2026-08-03 | Manhattan · Upper East Side-Lenox Hill-Roosevelt Island | Renewal Permit with Changes · General Construction | $1M–5M | Facade repairs. No change in egress, use or occupancy. | 🔒 Address & contractors |
Source: NYC Department of Buildings via NYC Open Data, published under the NYC Open Data Law. Not endorsed by the City of New York. Terms of use